| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$29,500.00 |
$27,100.00 |
$28,000.00 |
$94,720.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 14,919.59 | CY |
$7.00 |
$12.00 |
$8.10 |
$10.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.25 |
$1.24 |
$3.00 |
$3.45 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 455 | LF |
$7.00 |
$6.95 |
$8.00 |
$8.75 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 63,950.44 | SY |
$0.8000 |
$1.34 |
$1.45 |
$1.60 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.21 | AC |
$275.00 |
$249.00 |
$400.00 |
$430.00 |
| 7 | 233(E) 2822 |
EXCELSIOR MAT | 1,382 | SY |
$2.33 |
$2.95 |
$3.00 |
$3.25 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 74.58 | CY |
$81.00 |
$96.44 |
$43.00 |
$98.00 |
| 9 | 307(A) 4200 |
FLY ASH | 4,247.02 | TON |
$50.00 |
$49.25 |
$80.00 |
$80.00 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 84,171.48 | SY |
$2.25 |
$2.50 |
$2.25 |
$4.95 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 450 | SY |
$22.00 |
$2.50 |
$2.00 |
$14.00 |
| 12 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 29,433 | LF |
$4.30 |
$3.50 |
$4.85 |
$8.80 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 606.69 | TON |
$45.00 |
$48.22 |
$42.50 |
$50.00 |
| 14 | 407(B) 0250 |
TACK COAT | 3,904.92 | GAL |
$2.98 |
$2.98 |
$4.10 |
$2.00 |
| 15 | 408 5774 |
PRIME COAT | 27,289.43 | GAL |
$2.98 |
$2.98 |
$4.45 |
$2.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 21,107.12 | TON |
$73.00 |
$61.50 |
$86.25 |
$87.60 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,745.45 | TON |
$82.00 |
$71.00 |
$88.90 |
$94.00 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 74 | CY |
$85.00 |
$55.00 |
$20.00 |
$165.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 71.43 | CY |
$450.00 |
$755.00 |
$420.00 |
$570.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$410.00 |
$300.00 |
$320.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 5,686.72 | LB |
$1.50 |
$1.21 |
$1.00 |
$3.40 |
| 22 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 265 | TON |
$62.00 |
$55.20 |
$55.00 |
$70.00 |
| 23 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 1 | EA |
$2,750.00 |
$2,841.00 |
$2,000.00 |
$1,910.00 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 296 | LF |
$115.00 |
$192.90 |
$105.00 |
$139.50 |
| 25 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$220.00 |
$269.82 |
$185.00 |
$199.00 |
| 26 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 786 | LF |
$40.00 |
$37.00 |
$23.00 |
$34.00 |
| 27 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 486 | LF |
$39.00 |
$43.00 |
$35.00 |
$40.50 |
| 28 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 82 | LF |
$71.00 |
$75.00 |
$70.00 |
$67.00 |
| 29 | 613(E) 4787 |
24" CORRUGATED POLYETHYLENE PIPE TYPE "S" | 30 | LF |
$45.00 |
$55.52 |
$40.00 |
$45.00 |
| 30 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 34 | EA |
$330.00 |
$150.00 |
$300.00 |
$340.00 |
| 31 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$1,400.00 |
$1,498.22 |
$1,400.00 |
$1,650.00 |
| 32 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 24 | EA |
$390.00 |
$200.00 |
$390.00 |
$390.00 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$950.00 |
$1,200.00 |
$1,200.00 |
$525.00 |
| 34 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 3 | EA |
$1,050.00 |
$1,900.00 |
$1,400.00 |
$3,600.00 |
| 35 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,400.00 |
$1,890.00 |
$1,960.00 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$16,661.00 |
$43,000.00 |
$56,500.00 |
| 37 | 619(B) 0291 |
REMOVAL OF HEADWALL | 18 | EA |
$1,700.00 |
$500.00 |
$900.00 |
$1,950.00 |
| 38 | 619(B) 4821 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 17 | SY |
$6.00 |
$15.00 |
$8.00 |
$129.00 |
| 39 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 76 | LF |
$8.56 |
$7.00 |
$8.00 |
$17.00 |
| 40 | 619(C) 0924 |
SAWING PAVEMENT | 106 | LF |
$4.75 |
$5.00 |
$11.35 |
$3.25 |
| 41 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$375.00 |
$50.00 |
$400.00 |
$185.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 75.55 | SF |
$36.00 |
$43.00 |
$50.00 |
$57.50 |
| 43 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,492 | LF |
$0.6000 |
$1.10 |
$0.7500 |
$0.7000 |
| 44 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,500.00 |
$15,000.00 |
$13,450.00 |
$15,470.00 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$46,500.00 |
$43,620.00 |
$36,900.00 |
$104,675.00 |
| 46 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,750.00 |
$10,050.00 |
$25,500.00 |
$40,400.00 |
| 47 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$120,000.00 |
$179,410.00 |
$205,435.00 |
$160,482.00 |