| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$48,695.01 |
$70,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,210.58 | CY |
$9.00 |
$14.58 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,327.88 | CY |
$12.00 |
$11.36 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$24,939.19 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 29,205 | LF |
$2.00 |
$1.05 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,000 | LF |
$8.00 |
$4.82 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 21,879 | SY |
$2.50 |
$1.97 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.52 | AC |
$500.00 |
$246.93 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,943.59 | CY |
$45.00 |
$44.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 13,944.44 | SY |
$1.44 |
$0.9300 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,593.46 | TON |
$25.00 |
$25.00 |
| 12 | 407(B) 0250 |
TACK COAT | 7,004.19 | GAL |
$3.00 |
$2.89 |
| 13 | 408 5774 |
PRIME COAT | 11,391.59 | GAL |
$5.00 |
$1.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,092.47 | TON |
$78.37 |
$62.51 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,184.18 | TON |
$74.53 |
$65.37 |
| 16 | 411(E) 5990 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 1,463.53 | TON |
$150.00 |
$75.21 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 1,650 | SY |
$8.00 |
$5.84 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 28.4 | CY |
$25.00 |
$43.43 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 78 | CY |
$720.00 |
$839.49 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$325.00 |
$434.29 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 6,793 | LB |
$1.25 |
$1.12 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 18 | TON |
$55.00 |
$90.37 |
| 23 | 613(A) 0403 |
15" R.C.PIPE CLASS III | 64 | LF |
$65.00 |
$43.00 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 233 | LF |
$46.00 |
$92.52 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,390 | LF |
$27.00 |
$42.74 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 160 | LF |
$32.00 |
$69.60 |
| 27 | 613(L) 5724 |
15" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$500.00 |
$1,031.11 |
| 28 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 92 | EA |
$250.00 |
$1,055.37 |
| 29 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 20 | EA |
$500.00 |
$1,088.26 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$23,152.91 |
| 31 | 624(A) 4281 |
FENCE-STYLE WWF | 1,702 | LF |
$8.00 |
$9.31 |
| 32 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 2 | EA |
$1,000.00 |
$310.21 |
| 33 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 12 | EA |
$155.00 |
$186.13 |
| 34 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,563.81 | CY |
$15.00 |
$12.66 |
| 35 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 72.13 | CY |
$20.00 |
$43.43 |
| 36 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$10,000.00 |
$20,473.75 |
| 37 | 509(A) 1326 |
CLASS AA CONCRETE | 251.12 | CY |
$550.00 |
$603.04 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 44,689.72 | LB |
$1.00 |
$1.12 |
| 39 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$6,000.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$70,000.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 188.88 | SY |
$200.00 |
$564.03 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 162.48 | SY |
$9.00 |
$12.41 |
| 43 | 540 4500 |
(PL)REPAIR BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$12,175.76 |
| 44 | 542 4625 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 4 | EA |
$3,000.00 |
$6,768.62 |
| 45 | 542 4655 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE E) | 4 | EA |
$3,000.00 |
$7,682.51 |
| 46 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 923.1 | TON |
$40.00 |
$27.92 |
| 47 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 198 | TON |
$35.00 |
$51.29 |
| 48 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 275 | LF |
$25.00 |
$31.02 |
| 49 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 5 | DAY |
$650.00 |
$650.00 |
| 50 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 75,760 | LF |
$0.5000 |
$0.5000 |
| 51 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 2 | EA |
$500.00 |
$930.63 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$5,893.96 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$24,816.66 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,861.25 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$70,417.28 |