| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$75,000.00 |
$34,000.00 |
$40,000.00 |
$95,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 41,707 | CY |
$7.50 |
$10.00 |
$10.00 |
$11.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,943 | CY |
$10.00 |
$17.50 |
$10.00 |
$13.50 |
$12.00 |
| 4 | 202(L) 6120 |
(SP) SETTLEMENT PLATE | 2 | EA |
$2,500.00 |
$3,400.00 |
$1,200.00 |
$538.62 |
$5,000.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$25,000.00 |
$15,000.00 |
$75,000.00 |
$60,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,210 | LF |
$2.00 |
$2.20 |
$1.18 |
$1.75 |
$5.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 644 | LF |
$7.00 |
$8.00 |
$6.68 |
$7.39 |
$8.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 77,925 | SY |
$2.00 |
$1.65 |
$1.14 |
$1.35 |
$2.00 |
| 9 | 233(E) 2822 |
EXCELSIOR MAT | 3,400 | SY |
$2.00 |
$3.15 |
$1.98 |
$2.33 |
$2.00 |
| 10 | 241 2832 |
MOWING | 16.6 | AC |
$60.00 |
$59.00 |
$89.00 |
$60.88 |
$25.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,736 | CY |
$60.00 |
$76.50 |
$60.00 |
$52.00 |
$54.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 387.5 | TON |
$30.00 |
$37.00 |
$60.00 |
$33.00 |
$36.00 |
| 13 | 407(B) 0250 |
TACK COAT | 502 | GAL |
$3.00 |
$4.25 |
$4.05 |
$4.75 |
$5.00 |
| 14 | 408 5774 |
PRIME COAT | 2,987 | GAL |
$5.50 |
$6.75 |
$6.50 |
$7.50 |
$7.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,535 | TON |
$80.00 |
$108.00 |
$112.00 |
$120.00 |
$115.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 790 | TON |
$85.00 |
$120.00 |
$125.00 |
$135.00 |
$130.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$550.00 |
$450.00 |
$264.56 |
$300.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$15,000.00 |
$21,009.92 |
$25,000.00 |
| 19 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,365 | SY |
$3.00 |
$2.85 |
$7.85 |
$2.85 |
$3.00 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$4.50 |
$7.00 |
$12.00 |
$3.98 |
$6.00 |
| 21 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$22.00 |
$25.00 |
$21.50 |
$25.00 |
$25.00 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,650.00 |
$1,400.00 |
$1,150.00 |
$1,350.00 |
$1,900.00 |
| 23 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,400.00 |
$2,400.00 |
$2,250.00 |
$2,650.00 |
$2,700.00 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 160 | CY |
$27.00 |
$50.00 |
$25.00 |
$22.08 |
$12.00 |
| 25 | 501(F) 6352 |
GRANULAR BACKFILL | 170 | CY |
$65.00 |
$70.00 |
$75.00 |
$55.00 |
$50.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 227.8 | SY |
$200.00 |
$265.00 |
$250.00 |
$211.23 |
$195.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 1,774.3 | SY |
$4.50 |
$4.25 |
$3.80 |
$4.44 |
$6.00 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 998 | LF |
$80.00 |
$60.00 |
$80.00 |
$125.00 |
$95.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 787,510 | LB |
$2.00 |
$1.56 |
$1.83 |
$1.39 |
$1.85 |
| 30 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$600.00 |
$1,000.00 |
$1,500.00 |
$1,025.79 |
$1,200.00 |
| 31 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$2,500.00 |
$2,500.00 |
$1,800.00 |
$1,183.58 |
$1,200.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 452.6 | CY |
$560.00 |
$475.00 |
$850.00 |
$1,045.00 |
$700.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 176.8 | CY |
$600.00 |
$1,000.00 |
$700.00 |
$750.00 |
$700.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 128,690 | LB |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
| 35 | 514(A) 6013 |
PILES, FURNISHED (HP 12X74) | 574 | LF |
$40.00 |
$60.00 |
$35.00 |
$35.00 |
$55.00 |
| 36 | 514(B) 6295 |
PILES, DRIVEN (HP 12X74) | 574 | LF |
$15.00 |
$15.00 |
$15.00 |
$40.00 |
$15.00 |
| 37 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 38 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 208 | LF |
$1,400.00 |
$1,350.00 |
$1,600.00 |
$2,050.00 |
$1,600.00 |
| 39 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$3,000.00 |
$3,000.00 |
$1,402.04 |
$2,500.00 |
| 40 | 523(A) 6550 |
SEALER CRACK PREPARATION | 136.7 | LF |
$4.00 |
$5.00 |
$4.00 |
$4.57 |
$6.00 |
| 41 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$120.00 |
$250.00 |
$150.00 |
$116.95 |
$300.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,170 | TON |
$40.00 |
$52.50 |
$40.00 |
$50.75 |
$50.00 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 475 | TON |
$40.00 |
$47.50 |
$35.00 |
$47.35 |
$40.00 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 68 | LF |
$30.00 |
$25.00 |
$35.00 |
$10.00 |
$28.00 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$30.00 |
$25.00 |
$35.00 |
$10.00 |
$20.00 |
| 46 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 12,400 | LF |
$0.6000 |
$0.5800 |
$0.5800 |
$0.7000 |
$0.8000 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,600.00 |
$10,000.00 |
$5,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$45,000.00 |
$24,700.00 |
$35,000.00 |
$40,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$12,000.00 |
$500.00 |
$5,700.00 |
$2,000.00 |
$5,000.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$250,000.00 |
$230,000.00 |
$225,000.00 |
$245,000.00 |
$150,000.00 |