| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$16,225.00 |
$11,500.00 |
$20,000.00 |
$5,500.00 |
$8,300.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 269 | CY |
$14.50 |
$30.50 |
$25.00 |
$14.70 |
$11.50 |
$30.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 150 | CY |
$15.00 |
$43.50 |
$25.00 |
$30.00 |
$40.00 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,550.00 |
$9,660.00 |
$5,000.00 |
$3,750.00 |
$4,900.00 |
$3,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 480 | LF |
$2.00 |
$1.70 |
$2.40 |
$3.00 |
$2.50 |
$2.35 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$9.50 |
$12.00 |
$26.50 |
$12.75 |
$15.00 |
$26.40 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 35 | CY |
$100.00 |
$159.00 |
$100.00 |
$175.00 |
$100.00 |
$74.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 362 | SY |
$2.80 |
$7.10 |
$11.00 |
$9.00 |
$10.00 |
$10.76 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 430 | CY |
$59.50 |
$84.50 |
$78.00 |
$75.00 |
$93.00 |
$80.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 1,880 | SY |
$2.00 |
$3.60 |
$2.20 |
$3.00 |
$4.50 |
$2.00 |
| 11 | 407(B) 0250 |
TACK COAT | 485 | GAL |
$4.00 |
$2.70 |
$3.85 |
$3.85 |
$4.00 |
$5.00 |
| 12 | 408 5774 |
PRIME COAT | 1,215 | GAL |
$7.30 |
$7.00 |
$16.50 |
$16.50 |
$16.00 |
$6.00 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 255 | TON |
$98.00 |
$103.00 |
$141.00 |
$141.08 |
$150.00 |
$110.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 275 | TON |
$121.00 |
$103.00 |
$150.00 |
$149.33 |
$160.00 |
$117.50 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,810.00 |
$2,650.00 |
$7,500.00 |
$3,250.00 |
$4,000.00 |
$3,000.00 |
| 16 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 900 | SY |
$8.00 |
$12.00 |
$5.00 |
$12.00 |
$20.00 |
$12.00 |
| 17 | 619(C) 0924 |
SAWING PAVEMENT | 55 | LF |
$6.50 |
$40.00 |
$5.00 |
$15.00 |
$5.00 |
$4.00 |
| 18 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 330 | LF |
$8.50 |
$14.00 |
$6.00 |
$14.30 |
$10.00 |
$8.50 |
| 19 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 600 | CY |
$10.00 |
$9.50 |
$15.00 |
$12.20 |
$12.00 |
$25.00 |
| 20 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 66 | CY |
$16.00 |
$21.50 |
$15.00 |
$15.00 |
$35.00 |
$25.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 91.5 | CY |
$80.00 |
$123.00 |
$90.00 |
$75.00 |
$140.00 |
$100.00 |
| 22 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 47.34 | LF |
$120.00 |
$165.00 |
$100.00 |
$225.00 |
$105.00 |
$100.00 |
| 23 | 542 4600 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$245,000.00 |
$225,000.00 |
$255,000.00 |
$285,000.00 |
$375,000.00 |
| 24 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 226 | TON |
$57.00 |
$50.50 |
$48.00 |
$51.00 |
$60.00 |
$60.00 |
| 25 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 20 | TON |
$55.00 |
$42.50 |
$40.00 |
$45.00 |
$50.00 |
$50.00 |
| 26 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 152 | LF |
$23.00 |
$41.00 |
$25.00 |
$24.00 |
$20.00 |
$30.00 |
| 27 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$13,000.00 |
$11,900.00 |
$15,000.00 |
$9,000.00 |
$7,500.00 |
$15,000.00 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$19.50 |
$18.00 |
$18.70 |
$21.00 |
$20.00 |
$17.00 |
| 29 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$1,990.00 |
$2,240.00 |
$2,300.00 |
$2,300.00 |
$1,880.00 |
| 30 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,860.00 |
$2,100.00 |
$1,850.00 |
$2,100.00 |
$1,750.00 |
| 31 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,450.00 |
$159.00 |
$165.00 |
$100.00 |
$180.00 |
$150.00 |
| 32 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,766 | LF |
$1.30 |
$2.90 |
$3.00 |
$2.50 |
$3.25 |
$2.75 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,900.00 |
$1,910.00 |
$1,980.00 |
$5,000.00 |
$4,000.00 |
$3,000.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,900.00 |
$5,720.00 |
$5,950.00 |
$6,400.00 |
$8,000.00 |
$5,570.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,800.00 |
$2,650.00 |
$4,000.00 |
$2,800.00 |
$6,000.00 |
$1,000.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,325.00 |
$20,368.95 |
$25,000.00 |
$23,100.00 |
$25,000.00 |
$57,000.00 |