| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$4,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,080 | CY |
$7.50 |
$5.25 |
$10.00 |
$18.88 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,229 | CY |
$11.00 |
$12.50 |
$10.00 |
$17.36 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$13,000.00 |
$5,000.00 |
$11,218.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,686 | LF |
$2.00 |
$1.99 |
$2.00 |
$2.23 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$8.00 |
$12.95 |
$12.00 |
$14.53 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 9,387 | SY |
$2.00 |
$1.59 |
$1.59 |
$1.78 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.91 | AC |
$445.00 |
$99.00 |
$99.00 |
$111.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 769 | TON |
$25.00 |
$16.00 |
$25.00 |
$33.55 |
| 10 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 25 | TON |
$55.00 |
$50.00 |
$37.00 |
$58.34 |
| 11 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 11 | TON |
$44.00 |
$40.00 |
$37.00 |
$50.99 |
| 12 | 613(D) 0780 |
18" CORR. ALUMINUM PIPE | 42 | LF |
$30.00 |
$25.50 |
$37.00 |
$102.35 |
| 13 | 613(D) 0781 |
24" CORR. ALUMINUM PIPE | 41 | LF |
$30.00 |
$30.00 |
$44.00 |
$116.10 |
| 14 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$967.00 |
$2,500.00 |
$1,200.00 |
$1,458.00 |
| 15 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,096.00 |
$3,500.00 |
$1,500.00 |
$1,739.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$1,500.00 |
$3,000.00 |
$5,609.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$13.50 |
$25.00 |
$25.00 |
$30.60 |
| 18 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$140.00 |
$130.00 |
$140.00 |
$153.98 |
| 19 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$245.00 |
$300.00 |
$270.00 |
$321.11 |
| 20 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 292 | LF |
$66.00 |
$100.00 |
$95.00 |
$117.24 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 690 | LB |
$4.50 |
$5.00 |
$3.00 |
$1.49 |
| 22 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,020.00 |
$850.00 |
$1,000.00 |
$747.00 |
| 23 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,050.00 |
$850.00 |
$1,000.00 |
$387.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 86 | CY |
$620.00 |
$750.00 |
$650.00 |
$964.00 |
| 25 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$625.00 |
$750.00 |
$650.00 |
$750.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 36,092 | LB |
$1.00 |
$1.00 |
$1.00 |
$0.8000 |
| 27 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 84 | LF |
$32.00 |
$35.00 |
$45.00 |
$32.08 |
| 28 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 294 | LF |
$39.00 |
$35.00 |
$55.00 |
$36.32 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 84 | LF |
$13.50 |
$30.00 |
$11.00 |
$86.81 |
| 30 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 294 | LF |
$14.00 |
$30.00 |
$11.00 |
$68.68 |
| 31 | 514(K) 6260 |
(PL)PILOT HOLES | 180 | LF |
$120.00 |
$45.00 |
$150.00 |
$80.77 |
| 32 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,011 | TON |
$35.00 |
$28.00 |
$37.00 |
$31.80 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 332 | TON |
$29.00 |
$22.00 |
$32.00 |
$23.65 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$26.00 |
$35.00 |
$35.00 |
$18.60 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$21.50 |
$35.00 |
$35.00 |
$32.87 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$12,000.00 |
$50,000.00 |
| 38 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,450.00 |
$1,450.00 |
$1,767.00 |
| 39 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$2,350.00 |
$2,350.00 |
$2,792.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$1,600.00 |
$1,700.00 |
$1,795.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$6,650.00 |
$7,640.00 |
$13,421.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,450.00 |
$5,000.00 |
$1,200.00 |
$15,000.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,055.00 |
$44,900.00 |
$55,000.00 |
$60,000.00 |