| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 865 | CY |
$10.00 |
$22.70 |
$15.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$625,000.00 |
$517,300.00 |
$750,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,313 | LF |
$1.75 |
$1.18 |
$1.30 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,760 | LF |
$8.00 |
$5.63 |
$6.20 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 117,080 | SY |
$1.75 |
$1.06 |
$1.16 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 24.19 | AC |
$550.00 |
$368.00 |
$400.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,675 | CY |
$55.00 |
$48.19 |
$64.00 |
| 8 | 307(A) 4200 |
FLY ASH | 2,943 | TON |
$72.00 |
$116.00 |
$115.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 58,346 | SY |
$2.70 |
$2.50 |
$3.00 |
| 10 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 15,945 | LF |
$4.25 |
$4.32 |
$5.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 815 | TON |
$30.00 |
$49.90 |
$33.00 |
| 12 | 407(B) 0250 |
TACK COAT | 2,878 | GAL |
$3.50 |
$3.44 |
$3.80 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,493 | TON |
$80.00 |
$63.68 |
$71.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,488 | TON |
$85.00 |
$65.77 |
$73.00 |
| 15 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 77 | CY |
$20.00 |
$5.00 |
$15.00 |
| 16 | 509(B) 0321 |
CLASS A CONCRETE | 197 | CY |
$450.00 |
$706.65 |
$700.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 138 | CY |
$325.00 |
$417.97 |
$450.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 16,287 | LB |
$1.00 |
$0.9000 |
$0.9000 |
| 19 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 169 | TON |
$45.00 |
$59.10 |
$45.00 |
| 20 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 51 | TON |
$38.00 |
$68.90 |
$34.00 |
| 21 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 184 | LF |
$70.00 |
$164.00 |
$130.00 |
| 22 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 86 | LF |
$80.00 |
$180.00 |
$150.00 |
| 23 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 54 | LF |
$100.00 |
$207.00 |
$190.00 |
| 24 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 730 | LF |
$30.00 |
$58.20 |
$30.00 |
| 25 | 613(B) 4532 |
57" X 38" CORR. GALV. STEEL PIPE ARCH | 92 | LF |
$50.00 |
$118.00 |
$90.00 |
| 26 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$1,100.00 |
$1,510.00 |
$1,400.00 |
| 27 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,200.00 |
$1,700.00 |
$1,700.00 |
| 28 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,700.00 |
$2,360.00 |
$2,200.00 |
| 29 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 18 | EA |
$1,200.00 |
$1,400.00 |
$1,500.00 |
| 30 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$1,950.00 |
$2,500.00 |
| 31 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$3,500.00 |
$8,680.00 |
$4,000.00 |
| 32 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 334 | LF |
$10.00 |
$10.80 |
$6.00 |
| 33 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 36.26 | SF |
$22.00 |
$20.00 |
$22.00 |
| 34 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 84 | LF |
$10.00 |
$8.00 |
$10.00 |
| 35 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 57,207 | LF |
$0.5000 |
$0.4400 |
$0.4600 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$7,200.00 |
$8,000.00 |
| 37 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 722 | CY |
$10.00 |
$25.00 |
$15.00 |
| 38 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 112 | CY |
$10.00 |
$5.00 |
$15.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 234 | CY |
$445.00 |
$490.61 |
$500.00 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 45,897 | LB |
$1.00 |
$0.9000 |
$0.9000 |
| 41 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 218 | TON |
$45.00 |
$59.10 |
$45.00 |
| 42 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 66 | TON |
$38.00 |
$68.90 |
$34.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$8,680.00 |
$10,000.00 |
| 44 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 709 | CY |
$10.00 |
$25.00 |
$15.00 |
| 45 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 144 | CY |
$10.00 |
$5.00 |
$15.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 289 | CY |
$445.00 |
$477.77 |
$500.00 |
| 47 | 511(A) 1332 |
REINFORCING STEEL | 53,295 | LB |
$1.00 |
$0.9000 |
$0.9000 |
| 48 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 297 | TON |
$45.00 |
$59.10 |
$45.00 |
| 49 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 90 | TON |
$38.00 |
$68.90 |
$34.00 |
| 50 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$8,680.00 |
$7,500.00 |
| 51 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 393 | CY |
$10.00 |
$25.00 |
$15.00 |
| 52 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 106 | CY |
$10.00 |
$5.00 |
$15.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 199 | CY |
$445.00 |
$547.16 |
$500.00 |
| 54 | 511(A) 1332 |
REINFORCING STEEL | 33,572 | LB |
$1.00 |
$0.9000 |
$0.9000 |
| 55 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 139 | TON |
$45.00 |
$59.10 |
$45.00 |
| 56 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 42 | TON |
$38.00 |
$68.90 |
$34.00 |
| 57 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$8,680.00 |
$5,000.00 |
| 58 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$116,200.00 |
$125,550.00 |
| 59 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$22,062.46 |
$5,000.00 |
| 60 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$346,102.20 |
$200,000.00 |