| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$9,000.00 |
$20,000.00 |
$25,000.00 |
$15,000.00 |
$35,000.00 |
$45,000.00 |
$17,731.82 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,513 | CY |
$8.00 |
$8.00 |
$6.65 |
$6.65 |
$11.09 |
$10.00 |
$15.21 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 723 | CY |
$20.00 |
$16.00 |
$17.65 |
$17.65 |
$50.67 |
$60.00 |
$49.44 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 8,533 | CY |
$9.00 |
$9.00 |
$9.70 |
$9.70 |
$9.11 |
$15.00 |
$16.44 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$18,000.00 |
$5,000.00 |
$4,947.60 |
$17,510.26 |
$30,000.00 |
$13,467.15 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,319 | LF |
$3.20 |
$1.24 |
$1.79 |
$1.79 |
$2.01 |
$5.78 |
$1.88 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$8.00 |
$6.14 |
$12.95 |
$12.95 |
$18.23 |
$14.97 |
$13.60 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 16,433 | SY |
$4.00 |
$1.14 |
$1.34 |
$1.34 |
$1.43 |
$1.55 |
$1.93 |
| 9 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,396.2 | CY |
$46.00 |
$53.00 |
$33.00 |
$35.00 |
$39.78 |
$55.00 |
$48.05 |
| 10 | 402(D) 0223 |
TRAFFIC BOUND SURFACE COURSE TYPE D | 298.7 | TON |
$32.00 |
$27.00 |
$16.00 |
$36.00 |
$30.05 |
$32.37 |
$41.06 |
| 11 | 407(B) 0250 |
TACK COAT | 333 | GAL |
$3.00 |
$3.00 |
$4.80 |
$3.00 |
$3.53 |
$5.55 |
$5.04 |
| 12 | 408 5774 |
PRIME COAT | 675 | GAL |
$5.50 |
$6.50 |
$6.30 |
$8.65 |
$2.00 |
$5.67 |
$6.62 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 743 | TON |
$90.00 |
$77.00 |
$86.40 |
$77.75 |
$81.00 |
$92.55 |
$90.72 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 610.6 | TON |
$97.00 |
$95.00 |
$98.00 |
$96.25 |
$88.00 |
$103.48 |
$102.90 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$330.00 |
$350.00 |
$300.00 |
$425.00 |
$316.53 |
$405.66 |
$792.56 |
| 16 | 602(C) 4155 |
FILTER FABRIC | 6,050 | SY |
$2.00 |
$1.28 |
$1.10 |
$2.75 |
$9.26 |
$3.47 |
$4.77 |
| 17 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 36 | LF |
$85.00 |
$75.00 |
$38.00 |
$48.00 |
$64.23 |
$57.81 |
$103.44 |
| 18 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 58 | LF |
$45.00 |
$40.00 |
$26.35 |
$28.00 |
$38.89 |
$46.25 |
$61.23 |
| 19 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$750.00 |
$630.00 |
$910.00 |
$1,164.35 |
$809.31 |
$1,505.05 |
| 20 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$350.00 |
$350.00 |
$196.00 |
$300.00 |
$472.77 |
$578.08 |
$967.68 |
| 21 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 10 | CY |
$40.00 |
$60.00 |
$53.00 |
$62.00 |
$180.62 |
$57.81 |
$40.81 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,331 | SY |
$5.00 |
$5.00 |
$5.50 |
$3.00 |
$4.29 |
$2.50 |
$6.56 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$17.20 |
$25.00 |
$25.00 |
$22.63 |
$28.90 |
$26.25 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,700.00 |
$1,434.00 |
$1,850.00 |
$1,850.00 |
$2,106.17 |
$2,138.88 |
$1,942.50 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$2,180.00 |
$2,100.00 |
$2,100.00 |
$2,766.31 |
$2,427.91 |
$2,205.00 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$21.00 |
$38.00 |
$20.00 |
$20.00 |
$25.15 |
$23.12 |
$15.75 |
| 27 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 24 | LF |
$20.00 |
$10.00 |
$10.00 |
$10.00 |
$12.57 |
$11.56 |
$12.60 |
| 28 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,300 | LF |
$0.3400 |
$0.2900 |
$0.3100 |
$0.3500 |
$0.1500 |
$0.3600 |
$0.1300 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$9,000.00 |
$3,665.00 |
$2,600.00 |
$2,400.00 |
$3,017.80 |
$3,005.98 |
$88,903.15 |
| 30 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$18.00 |
$25.00 |
$15.00 |
$12.00 |
$24.18 |
$18.24 |
$23.16 |
| 31 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$41.00 |
$70.00 |
$55.00 |
$62.00 |
$68.32 |
$58.95 |
$63.79 |
| 32 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 448 | LF |
$220.00 |
$230.00 |
$220.00 |
$260.00 |
$248.30 |
$250.00 |
$245.61 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.06 | LF |
$300.00 |
$380.00 |
$265.00 |
$204.00 |
$321.30 |
$314.83 |
$420.54 |
| 34 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 373 | LF |
$80.00 |
$75.00 |
$75.00 |
$45.00 |
$101.10 |
$125.00 |
$153.75 |
| 35 | 506(A) 1322 |
STRUCTURAL STEEL | 900 | LB |
$4.00 |
$3.00 |
$5.00 |
$2.50 |
$15.48 |
$8.08 |
$3.73 |
| 36 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$800.00 |
$2,000.00 |
$642.00 |
$1,329.82 |
$1,032.13 |
$1,433.02 |
| 37 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$900.00 |
$800.00 |
$2,000.00 |
$642.00 |
$1,451.12 |
$642.79 |
$1,433.02 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 119.4 | CY |
$650.00 |
$625.00 |
$700.00 |
$475.00 |
$783.36 |
$1,104.30 |
$994.96 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 92 | CY |
$650.00 |
$650.00 |
$700.00 |
$465.00 |
$671.25 |
$650.00 |
$743.57 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 46,660 | LB |
$1.00 |
$1.00 |
$0.9500 |
$1.00 |
$1.01 |
$0.9500 |
$0.9300 |
| 41 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,941 | LB |
$1.50 |
$1.50 |
$0.9500 |
$1.51 |
$1.68 |
$1.28 |
$1.32 |
| 42 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 478 | LF |
$55.00 |
$60.00 |
$50.00 |
$48.00 |
$42.46 |
$45.00 |
$60.91 |
| 43 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 478 | LF |
$15.00 |
$11.00 |
$50.00 |
$6.00 |
$63.60 |
$35.00 |
$48.66 |
| 44 | 514(K) 6260 |
(PL)PILOT HOLES | 135 | LF |
$130.00 |
$200.00 |
$225.00 |
$310.00 |
$151.63 |
$280.28 |
$305.64 |
| 45 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 46 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 70 | LF |
$440.00 |
$900.00 |
$1,000.00 |
$1,226.00 |
$480.90 |
$1,100.00 |
$1,125.45 |
| 47 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,523.6 | TON |
$32.00 |
$40.00 |
$30.30 |
$38.00 |
$31.56 |
$46.25 |
$39.03 |
| 48 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,700 | SY |
$3.00 |
$1.30 |
$2.03 |
$24.00 |
$11.10 |
$3.47 |
$5.93 |
| 49 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$15.00 |
$30.00 |
$35.00 |
$42.25 |
$8.61 |
$31.26 |
$19.49 |
| 50 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$16.00 |
$25.00 |
$35.00 |
$40.51 |
$5.52 |
$17.60 |
$14.62 |
| 51 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$50,000.00 |
$20,000.00 |
$45,672.04 |
$60,000.00 |
$35,191.99 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$8,100.00 |
$23,226.09 |
$18,232.52 |
$15,000.00 |
$27,380.25 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,700.00 |
$3,000.00 |
$8,000.00 |
$1,000.00 |
$2,059.03 |
$17,537.45 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$80,000.00 |
$89,000.00 |
$105,512.00 |
$50,000.00 |
$100,000.00 |
$94,921.91 |