BRIDGE AND APPROACHES COUNTY ROAD (D0470): OVER CLOUD CREEK, 9.0 MILES SOUTHEAST OF JAY . PROJECT LENGTH = 0.298 MILE

Let date
Thursday, April 16, 2015
Contract
150133
J/P numbers
29409(04)
District
Division 8
County
Delaware
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (D0470): OVER CLOUD CREEK, 9.0 MILES SOUTHEAST OF JAY . PROJECT LENGTH = 0.298 MILE
Project number
STP-221C(024)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,192,568
1 RRY SERVICES LLC Low bidder $1,124,390 -5.7%
2 B & B BRIDGE COMPANY, LLC $1,162,815 -2.5% +3.4%
3 A. M. COHRON & SON, INC. $1,164,121 -2.4% +3.5%
5 GLOVER & ASSOCIATES, INC. $1,269,913 +6.5% +12.9%
6 M.J. HUGHES CONSTRUCTION, INC. $1,503,392 +26.1% +33.7%
7 Mobley Contractors, Inc. $1,629,379 +36.6% +44.9%

Bid tab: unit prices 54 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 RRY SERVICES LLC#2 B & B BRIDGE CO…#3 A. M. COHRON & …#5 GLOVER & ASSOCI…#6 M.J. HUGHES CON…#7 Mobley Contract…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $9,000.00 $20,000.00 $25,000.00 $15,000.00 $35,000.00 $45,000.00 $17,731.82
2202(A) 0183 UNCLASSIFIED EXCAVATION7,513CY $8.00 $8.00 $6.65 $6.65 $11.09 $10.00 $15.21
3202(C) 0182 ROCK EXCAVATION723CY $20.00 $16.00 $17.65 $17.65 $50.67 $60.00 $49.44
4202(D) 0184 UNCLASSIFIED BORROW8,533CY $9.00 $9.00 $9.70 $9.70 $9.11 $15.00 $16.44
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $18,000.00 $5,000.00 $4,947.60 $17,510.26 $30,000.00 $13,467.15
6221(C) 2801 TEMPORARY SILT FENCE2,319LF $3.20 $1.24 $1.79 $1.79 $2.01 $5.78 $1.88
7221(F) 0100 TEMPORARY SILT DIKE84LF $8.00 $6.14 $12.95 $12.95 $18.23 $14.97 $13.60
8230(A) 2806 SOLID SLAB SODDING16,433SY $4.00 $1.14 $1.34 $1.34 $1.43 $1.55 $1.93
9303(B) 2110 AGGREGATE BASE TYPE B1,396.2CY $46.00 $53.00 $33.00 $35.00 $39.78 $55.00 $48.05
10402(D) 0223 TRAFFIC BOUND SURFACE COURSE TYPE D298.7TON $32.00 $27.00 $16.00 $36.00 $30.05 $32.37 $41.06
11407(B) 0250 TACK COAT333GAL $3.00 $3.00 $4.80 $3.00 $3.53 $5.55 $5.04
12408 5774 PRIME COAT675GAL $5.50 $6.50 $6.30 $8.65 $2.00 $5.67 $6.62
13411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)743TON $90.00 $77.00 $86.40 $77.75 $81.00 $92.55 $90.72
14411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)610.6TON $97.00 $95.00 $98.00 $96.25 $88.00 $103.48 $102.90
15509(D) 0325 CLASS C CONCRETE20CY $330.00 $350.00 $300.00 $425.00 $316.53 $405.66 $792.56
16602(C) 4155 FILTER FABRIC6,050SY $2.00 $1.28 $1.10 $2.75 $9.26 $3.47 $4.77
17613(A) 0491 18" R.C.PIPE CLASS III36LF $85.00 $75.00 $38.00 $48.00 $64.23 $57.81 $103.44
18613(B) 0690 24" CORR. GALV. STEEL PIPE58LF $45.00 $40.00 $26.35 $28.00 $38.89 $46.25 $61.23
19613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $1,000.00 $750.00 $630.00 $910.00 $1,164.35 $809.31 $1,505.05
20613(P) 0761 24" GALV. STEEL CULVERT END SECTION ROUND2EA $350.00 $350.00 $196.00 $300.00 $472.77 $578.08 $967.68
21613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B10CY $40.00 $60.00 $53.00 $62.00 $180.62 $57.81 $40.81
22619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,331SY $5.00 $5.00 $5.50 $3.00 $4.29 $2.50 $6.56
23623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE100LF $20.00 $17.20 $25.00 $25.00 $22.63 $28.90 $26.25
24623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,700.00 $1,434.00 $1,850.00 $1,850.00 $2,106.17 $2,138.88 $1,942.50
25623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,250.00 $2,180.00 $2,100.00 $2,100.00 $2,766.31 $2,427.91 $2,205.00
26850(A) 8110 SHEET ALUMINUM SIGNS12.5SF $21.00 $38.00 $20.00 $20.00 $25.15 $23.12 $15.75
27851(C) 8327 2 1/4" SQUARE TUBE POST24LF $20.00 $10.00 $10.00 $10.00 $12.57 $11.56 $12.60
28854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)6,300LF $0.3400 $0.2900 $0.3100 $0.3500 $0.1500 $0.3600 $0.1300
29880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $9,000.00 $3,665.00 $2,600.00 $2,400.00 $3,017.80 $3,005.98 $88,903.15
30501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON200CY $18.00 $25.00 $15.00 $12.00 $24.18 $18.24 $23.16
31501(F) 6352 GRANULAR BACKFILL88CY $41.00 $70.00 $55.00 $62.00 $68.32 $58.95 $63.79
32503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)448LF $220.00 $230.00 $220.00 $260.00 $248.30 $250.00 $245.61
33504(C) 6250 SEALED EXPANSION JOINT33.06LF $300.00 $380.00 $265.00 $204.00 $321.30 $314.83 $420.54
34504(D) 6239 CONCRETE RAIL (TR3)373LF $80.00 $75.00 $75.00 $45.00 $101.10 $125.00 $153.75
35506(A) 1322 STRUCTURAL STEEL900LB $4.00 $3.00 $5.00 $2.50 $15.48 $8.08 $3.73
36507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $900.00 $800.00 $2,000.00 $642.00 $1,329.82 $1,032.13 $1,433.02
37507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY6EA $900.00 $800.00 $2,000.00 $642.00 $1,451.12 $642.79 $1,433.02
38509(A) 1326 CLASS AA CONCRETE119.4CY $650.00 $625.00 $700.00 $475.00 $783.36 $1,104.30 $994.96
39509(B) 1328 CLASS A CONCRETE92CY $650.00 $650.00 $700.00 $465.00 $671.25 $650.00 $743.57
40511(A) 1332 REINFORCING STEEL46,660LB $1.00 $1.00 $0.9500 $1.00 $1.01 $0.9500 $0.9300
41511(B) 6010 EPOXY COATED REINFORCING STEEL2,941LB $1.50 $1.50 $0.9500 $1.51 $1.68 $1.28 $1.32
42514(A) 6012 PILES, FURNISHED (HP 14X73)478LF $55.00 $60.00 $50.00 $48.00 $42.46 $45.00 $60.91
43514(B) 6296 PILES, DRIVEN (HP 14X73)478LF $15.00 $11.00 $50.00 $6.00 $63.60 $35.00 $48.66
44514(K) 6260 (PL)PILOT HOLES135LF $130.00 $200.00 $225.00 $310.00 $151.63 $280.28 $305.64
45514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
46516(A) 6093 DRILLED SHAFTS 42" DIAMETER70LF $440.00 $900.00 $1,000.00 $1,226.00 $480.90 $1,100.00 $1,125.45
47601(B) 1353 TYPE I-A PLAIN RIPRAP1,523.6TON $32.00 $40.00 $30.30 $38.00 $31.56 $46.25 $39.03
48601(I) 6312 FILTER FABRIC (RIPRAP)1,700SY $3.00 $1.30 $2.03 $24.00 $11.10 $3.47 $5.93
49613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $15.00 $30.00 $35.00 $42.25 $8.61 $31.26 $19.49
50613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $16.00 $25.00 $35.00 $40.51 $5.52 $17.60 $14.62
51619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $15,000.00 $50,000.00 $20,000.00 $45,672.04 $60,000.00 $35,191.99
52642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $10,000.00 $8,100.00 $23,226.09 $18,232.52 $15,000.00 $27,380.25
53220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,700.00 $3,000.00 $8,000.00 $1,000.00 $2,059.03 $17,537.45
54641 1399 MOBILIZATION1LSUM $80,000.00 $80,000.00 $89,000.00 $105,512.00 $50,000.00 $100,000.00 $94,921.91