| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$14,000.00 |
$12,000.00 |
$5,300.00 |
$35,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$33,000.00 |
$40,000.00 |
$50,000.00 |
$47,700.00 |
$60,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,788 | LF |
$2.50 |
$1.26 |
$1.52 |
$1.40 |
$1.80 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$8.00 |
$6.25 |
$7.80 |
$7.19 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 11,400 | SY |
$1.50 |
$1.36 |
$1.48 |
$1.36 |
$2.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.72 | AC |
$450.00 |
$600.00 |
$200.00 |
$525.76 |
$800.00 |
| 7 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,054 | TON |
$82.00 |
$95.00 |
$110.00 |
$100.70 |
$110.00 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 517 | TON |
$105.00 |
$100.00 |
$115.00 |
$106.00 |
$120.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$280.00 |
$374.28 |
$400.00 |
| 10 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 32 | LF |
$80.00 |
$60.00 |
$145.00 |
$167.86 |
$100.00 |
| 11 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 44 | LF |
$25.00 |
$33.00 |
$27.00 |
$27.65 |
$55.00 |
| 12 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 30 | LF |
$30.00 |
$38.00 |
$36.00 |
$31.51 |
$75.00 |
| 13 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$800.00 |
$500.00 |
$1,600.00 |
$1,915.63 |
$2,000.00 |
| 14 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$300.00 |
$500.00 |
$300.00 |
$387.66 |
$1,200.00 |
| 15 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$400.00 |
$275.00 |
$423.94 |
$1,000.00 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$20.00 |
$25.00 |
$9.50 |
$16.50 |
$20.00 |
| 17 | 501(F) 6352 |
GRANULAR BACKFILL | 102 | CY |
$60.00 |
$65.00 |
$65.00 |
$70.90 |
$75.00 |
| 18 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$250.00 |
$250.00 |
$260.00 |
$269.90 |
$250.00 |
| 19 | 504(B) 1305 |
SAW-CUT GROOVING | 266.7 | SY |
$5.00 |
$11.00 |
$12.60 |
$11.55 |
$15.00 |
| 20 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$80.00 |
$75.00 |
$76.50 |
$73.52 |
$95.00 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 690 | LB |
$3.00 |
$3.00 |
$3.00 |
$3.65 |
$3.00 |
| 22 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$1,100.00 |
$950.00 |
$1,307.83 |
$1,000.00 |
| 23 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$1,100.00 |
$950.00 |
$1,307.83 |
$1,000.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 86.1 | CY |
$625.00 |
$600.00 |
$625.00 |
$605.78 |
$600.00 |
| 25 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$650.00 |
$625.00 |
$645.00 |
$608.68 |
$600.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 33,490 | LB |
$1.00 |
$1.00 |
$0.9400 |
$1.04 |
$1.20 |
| 27 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 222 | LF |
$30.00 |
$39.00 |
$28.70 |
$42.56 |
$28.00 |
| 28 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 748 | LF |
$40.00 |
$48.00 |
$34.30 |
$59.79 |
$32.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 222 | LF |
$10.00 |
$11.00 |
$12.30 |
$7.70 |
$35.00 |
| 30 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 748 | LF |
$15.00 |
$11.00 |
$14.70 |
$5.50 |
$35.00 |
| 31 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,073 | TON |
$40.00 |
$43.00 |
$39.12 |
$37.81 |
$50.00 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 536 | TON |
$30.00 |
$36.00 |
$31.43 |
$28.25 |
$40.00 |
| 34 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$25.00 |
$30.00 |
$25.94 |
$20.00 |
| 35 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 176 | LF |
$20.00 |
$25.00 |
$28.00 |
$18.24 |
$20.00 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$4,375.00 |
$8,800.00 |
$20,000.00 |
| 37 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$15.00 |
$18.00 |
$21.50 |
$19.80 |
$25.00 |
| 38 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,697.50 |
$1,900.00 |
$1,867.25 |
$2,600.00 |
| 39 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,002.50 |
$1,500.00 |
$1,102.75 |
$1,800.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,600.00 |
$3,300.00 |
$2,046.00 |
$4,000.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,000.00 |
$6,500.00 |
$7,000.00 |
$8,400.00 |
$15,000.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,800.00 |
$3,780.00 |
$3,500.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$59,000.00 |
$64,000.00 |
$37,850.00 |
$63,199.97 |
$65,000.00 |
| 44 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,055 | LF |
$5.00 |
$3.50 |
$9.09 |
$8.30 |
$10.00 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 749 | LF |
$5.00 |
$4.00 |
$9.55 |
$8.72 |
$12.00 |