| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$15,000.00 |
$15,589.00 |
$35,000.00 |
$73,452.45 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$48,000.00 |
$35,000.00 |
$55,697.10 |
$75,000.00 |
$47,890.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$18,000.00 |
$6,500.00 |
$15,000.00 |
$35,000.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 330 | LF |
$10.00 |
$1.33 |
$1.33 |
$8.00 |
$3.00 |
$1.40 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 7,900 | SY |
$2.00 |
$1.32 |
$1.32 |
$2.50 |
$2.00 |
$1.40 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.64 | AC |
$600.00 |
$412.00 |
$412.00 |
$350.00 |
$800.00 |
$1,060.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 559 | CY |
$60.00 |
$64.00 |
$50.00 |
$55.00 |
$70.00 |
$77.10 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,040 | TON |
$40.00 |
$33.00 |
$30.00 |
$30.00 |
$40.00 |
$28.30 |
| 9 | 407(B) 0250 |
TACK COAT | 201 | GAL |
$4.00 |
$3.00 |
$3.00 |
$6.00 |
$6.00 |
$3.50 |
| 10 | 408 5774 |
PRIME COAT | 2,019 | GAL |
$6.50 |
$2.75 |
$2.75 |
$4.00 |
$5.00 |
$2.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 609 | TON |
$100.00 |
$88.25 |
$88.25 |
$125.00 |
$140.00 |
$83.25 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 298 | TON |
$120.00 |
$113.95 |
$113.95 |
$135.00 |
$155.00 |
$96.90 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$250.00 |
$350.00 |
$300.00 |
$400.00 |
$749.00 |
| 14 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 140 | TON |
$40.00 |
$45.00 |
$34.00 |
$50.00 |
$60.00 |
$46.50 |
| 15 | 602(C) 4155 |
FILTER FABRIC | 268 | SY |
$2.50 |
$3.00 |
$1.80 |
$3.00 |
$2.00 |
$2.00 |
| 16 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 160 | LF |
$35.35 |
$33.00 |
$22.00 |
$25.00 |
$60.00 |
$32.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 152 | LF |
$35.00 |
$40.00 |
$32.00 |
$25.00 |
$70.00 |
$32.00 |
| 18 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 64 | LF |
$50.00 |
$44.00 |
$20.00 |
$25.00 |
$80.00 |
$42.00 |
| 19 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$350.00 |
$300.00 |
$150.00 |
$250.00 |
$1,500.00 |
$350.00 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$800.00 |
$300.00 |
$150.00 |
$250.00 |
$1,200.00 |
$275.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$3,000.00 |
$2,500.00 |
$5,000.00 |
$20,000.00 |
$13,230.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,568 | SY |
$8.00 |
$5.00 |
$1.50 |
$5.50 |
$7.00 |
$6.10 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 125 | LF |
$20.00 |
$16.50 |
$16.50 |
$26.00 |
$22.00 |
$17.50 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$2,150.00 |
$2,150.00 |
$2,000.00 |
$2,500.00 |
$2,280.00 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,400.00 |
$2,450.00 |
$2,450.00 |
$2,500.00 |
$3,000.00 |
$2,598.00 |
| 26 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,120 | LF |
$4.80 |
$4.50 |
$6.00 |
$6.50 |
$12.00 |
$4.00 |
| 27 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$100.00 |
$75.00 |
$75.00 |
$100.00 |
$100.00 |
$80.00 |
| 28 | 629(C) 4960 |
MAILBOX | 4 | EA |
$40.00 |
$25.00 |
$25.00 |
$50.00 |
$50.00 |
$26.50 |
| 29 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$30.00 |
$35.00 |
$25.00 |
$50.00 |
$25.00 |
$26.50 |
| 30 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$15.00 |
$10.00 |
$10.00 |
$20.00 |
$15.00 |
$10.60 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$20.00 |
$30.00 |
$15.00 |
$20.00 |
$35.90 |
| 32 | 501(F) 6352 |
GRANULAR BACKFILL | 56 | CY |
$80.00 |
$75.00 |
$140.00 |
$50.00 |
$70.00 |
$104.00 |
| 33 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$230.00 |
$250.00 |
$365.00 |
$220.00 |
$200.00 |
$225.00 |
| 34 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$200.00 |
$180.00 |
$280.00 |
$175.00 |
$150.00 |
$192.00 |
| 35 | 504(B) 1305 |
SAW-CUT GROOVING | 273.4 | SY |
$5.00 |
$11.00 |
$10.25 |
$12.00 |
$14.00 |
$12.00 |
| 36 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 206.6 | LF |
$90.00 |
$75.00 |
$90.00 |
$110.00 |
$95.00 |
$129.00 |
| 37 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$4.00 |
$3.50 |
$1.50 |
$2.50 |
$3.00 |
$1.60 |
| 38 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$850.00 |
$650.00 |
$300.00 |
$250.00 |
$1,000.00 |
$725.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 78.4 | CY |
$700.00 |
$700.00 |
$850.00 |
$700.00 |
$550.00 |
$888.00 |
| 40 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$600.00 |
$750.00 |
$800.00 |
$750.00 |
$600.00 |
$913.00 |
| 41 | 511(A) 1332 |
REINFORCING STEEL | 19,810 | LB |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1.50 |
$1.00 |
| 42 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 564 | LF |
$38.00 |
$40.00 |
$28.00 |
$45.00 |
$28.00 |
$24.30 |
| 43 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 564 | LF |
$18.00 |
$11.00 |
$12.00 |
$15.00 |
$35.00 |
$80.80 |
| 44 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 540 | TON |
$55.00 |
$45.00 |
$34.00 |
$45.00 |
$60.00 |
$59.00 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 140 | TON |
$40.00 |
$39.00 |
$27.00 |
$38.00 |
$40.00 |
$79.00 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$30.00 |
$25.00 |
$25.00 |
$46.00 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$30.00 |
$30.00 |
$30.00 |
$20.00 |
$25.00 |
$55.00 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$22,000.00 |
$12,000.00 |
$20,000.00 |
$10,000.00 |
$25,000.00 |
$45,000.00 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,600 | LF |
$0.8000 |
$1.50 |
$1.50 |
$1.75 |
$2.00 |
$1.60 |
| 51 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$4,500.00 |
$3,000.00 |
$5,000.00 |
$4,500.00 |
$3,180.00 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$7,500.00 |
$5,000.00 |
$10,000.00 |
$26,720.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,550.00 |
$1,500.00 |
$1,500.00 |
$3,500.00 |
$8,000.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$56,000.00 |
$59,000.00 |
$50,000.00 |
$35,000.00 |
$65,000.00 |
$43,750.00 |