| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$30,000.00 |
$81,400.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,166 | CY |
$10.00 |
$8.00 |
$7.70 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,369 | CY |
$12.00 |
$10.00 |
$9.90 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$25,000.00 |
$73,480.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,626 | LF |
$2.00 |
$1.30 |
$1.31 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 280 | LF |
$9.00 |
$7.00 |
$6.97 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 8.4 | CY |
$120.00 |
$200.00 |
$90.16 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 33,027 | SY |
$1.50 |
$1.10 |
$1.17 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 6.9 | AC |
$600.00 |
$315.00 |
$316.80 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.9 | AC |
$500.00 |
$366.00 |
$366.30 |
| 11 | 241 2832 |
MOWING | 13.8 | AC |
$100.00 |
$85.00 |
$85.80 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 11.9 | TON |
$45.00 |
$55.00 |
$41.29 |
| 13 | 407(B) 0250 |
TACK COAT | 1,627 | GAL |
$4.00 |
$4.65 |
$5.32 |
| 14 | 408 5774 |
PRIME COAT | 2,467 | GAL |
$6.00 |
$5.50 |
$10.66 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,226 | TON |
$90.00 |
$90.00 |
$81.17 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 912 | TON |
$95.00 |
$95.00 |
$93.62 |
| 17 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 84 | LF |
$160.00 |
$165.00 |
$145.79 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 36 | LF |
$40.00 |
$30.00 |
$34.07 |
| 19 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 550 | LF |
$15.00 |
$20.00 |
$14.63 |
| 20 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 180 | LF |
$15.00 |
$20.00 |
$14.63 |
| 21 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$1,200.00 |
$1,465.19 |
| 22 | 613(M) 7205 |
TYPE EE6 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,200.00 |
$3,056.03 |
| 23 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$600.00 |
$1,000.00 |
$641.44 |
| 24 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$11,000.00 |
| 25 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,792 | SY |
$5.00 |
$2.75 |
$5.39 |
| 26 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,098 | LF |
$4.00 |
$4.00 |
$3.85 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 104 | LF |
$6.00 |
$5.00 |
$5.50 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$20.00 |
$19.25 |
$17.33 |
| 29 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,650.00 |
$2,420.00 |
| 30 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,400.00 |
$2,200.00 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 225 | CY |
$20.00 |
$15.00 |
$23.00 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 306 | CY |
$175.00 |
$150.00 |
$147.96 |
| 33 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,594.7 | LF |
$220.00 |
$200.00 |
$240.44 |
| 34 | 504(A) 1304 |
APPROACH SLAB | 378 | SY |
$180.00 |
$200.00 |
$194.16 |
| 35 | 504(B) 1305 |
SAW-CUT GROOVING | 2,152.5 | SY |
$5.00 |
$3.30 |
$3.57 |
| 36 | 504(C) 6250 |
SEALED EXPANSION JOINT | 48.7 | LF |
$300.00 |
$260.00 |
$310.96 |
| 37 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 968.6 | LF |
$90.00 |
$75.00 |
$77.33 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 1,990 | LB |
$2.50 |
$3.00 |
$2.77 |
| 39 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$2,000.00 |
$1,838.58 |
| 40 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$2,100.00 |
$1,849.85 |
| 41 | 509(A) 1326 |
CLASS AA CONCRETE | 466.4 | CY |
$550.00 |
$600.00 |
$567.84 |
| 42 | 509(B) 1328 |
CLASS A CONCRETE | 278.8 | CY |
$550.00 |
$600.00 |
$567.84 |
| 43 | 509(D) 1331 |
CLASS C CONCRETE | 15.1 | CY |
$400.00 |
$350.00 |
$504.28 |
| 44 | 511(A) 1332 |
REINFORCING STEEL | 310 | LB |
$0.9000 |
$2.00 |
$1.76 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 158,597 | LB |
$1.10 |
$1.00 |
$1.12 |
| 46 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 298 | LF |
$40.00 |
$40.00 |
$38.12 |
| 47 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,558 | LF |
$45.00 |
$38.50 |
$47.52 |
| 48 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 298 | LF |
$20.00 |
$20.00 |
$11.50 |
| 49 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,558 | LF |
$20.00 |
$16.50 |
$9.20 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,922.4 | SY |
$5.00 |
$3.25 |
$3.74 |
| 52 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 506 | LF |
$900.00 |
$900.00 |
$875.10 |
| 53 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$3,500.00 |
$4,140.00 |
| 54 | 523(A) 6550 |
SEALER CRACK PREPARATION | 95.4 | LF |
$5.00 |
$4.50 |
$4.60 |
| 55 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$150.00 |
$220.00 |
$115.00 |
| 56 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,055 | TON |
$50.00 |
$38.00 |
$41.56 |
| 57 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 498 | TON |
$40.00 |
$31.00 |
$32.00 |
| 58 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$30.00 |
$25.00 |
$24.84 |
| 59 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 129 | LF |
$30.00 |
$25.00 |
$24.84 |
| 60 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$90,000.00 |
$75,000.00 |
$256,450.00 |
| 61 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 2,544 | LF |
$0.6000 |
$1.14 |
$0.6300 |
| 62 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$200.00 |
$125.00 |
$126.50 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 24 | SF |
$21.00 |
$33.00 |
$34.10 |
| 64 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 56 | LF |
$10.00 |
$10.00 |
$9.90 |
| 65 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$10.00 |
$7.00 |
$7.37 |
| 66 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,978 | LF |
$1.00 |
$1.30 |
$1.38 |
| 67 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,320 | SD |
$0.6000 |
$0.0700 |
$0.0600 |
| 68 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.00 |
$3.10 |
$3.30 |
| 69 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$2.00 |
$3.10 |
$3.30 |
| 70 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$0.5000 |
$0.5000 |
$0.5000 |
| 71 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,400 | SD |
$0.5000 |
$0.4500 |
$0.4400 |
| 72 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$20.00 |
$10.00 |
$7.70 |
| 73 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$21,200.00 |
$21,120.00 |
| 74 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$6,050.00 |
| 75 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$170,000.00 |
$190,404.63 |