| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$14,040.00 |
$24,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,222 | CY |
$7.00 |
$6.75 |
$8.57 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,901 | CY |
$8.00 |
$8.91 |
$12.50 |
$16.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$14,040.00 |
$20,000.00 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,400 | LF |
$2.00 |
$1.38 |
$1.65 |
$0.5000 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$8.00 |
$7.51 |
$8.50 |
$8.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 1,337 | LF |
$2.00 |
$1.81 |
$2.25 |
$2.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 25,440 | SY |
$2.00 |
$1.44 |
$1.66 |
$1.50 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.26 | AC |
$500.00 |
$216.00 |
$200.00 |
$250.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,201 | CY |
$50.00 |
$55.08 |
$63.75 |
$55.00 |
| 11 | 307(A) 4200 |
FLY ASH | 366 | TON |
$100.00 |
$92.88 |
$100.00 |
$100.00 |
| 12 | 307(D) 4230 |
LIME | 61 | TON |
$180.00 |
$189.00 |
$210.00 |
$180.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 6,735 | SY |
$4.00 |
$3.24 |
$3.60 |
$4.00 |
| 14 | 307(G) 4260 |
LIME PRETREATMENT | 3,368 | SY |
$2.00 |
$2.43 |
$2.70 |
$6.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 6,735 | SY |
$1.50 |
$1.73 |
$1.95 |
$2.00 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,013 | TON |
$28.00 |
$20.71 |
$30.00 |
$40.00 |
| 17 | 407(B) 0250 |
TACK COAT | 537 | GAL |
$5.00 |
$6.48 |
$7.20 |
$7.00 |
| 18 | 408 5774 |
PRIME COAT | 4,088 | GAL |
$7.00 |
$8.64 |
$9.60 |
$9.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,409 | TON |
$100.00 |
$93.96 |
$104.40 |
$105.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 657 | TON |
$130.00 |
$105.84 |
$117.60 |
$115.00 |
| 21 | 509(B) 0321 |
CLASS A CONCRETE | 15 | CY |
$450.00 |
$463.21 |
$735.00 |
$420.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 176 | CY |
$350.00 |
$243.00 |
$390.00 |
$320.00 |
| 23 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 75 | TON |
$35.00 |
$40.26 |
$47.39 |
$50.00 |
| 24 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 25 | TON |
$35.00 |
$32.83 |
$39.00 |
$40.00 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 126 | LF |
$25.00 |
$25.29 |
$27.00 |
$65.00 |
| 26 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,200.00 |
$999.00 |
$1,150.00 |
$1,000.00 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$14,040.00 |
$6,500.00 |
$90,000.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,993 | SY |
$3.00 |
$3.24 |
$7.00 |
$7.00 |
| 29 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,620 | LF |
$2.00 |
$3.24 |
$4.50 |
$4.00 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 72 | LF |
$6.00 |
$16.20 |
$15.00 |
$6.00 |
| 31 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$800.00 |
$927.40 |
$1,200.00 |
$500.00 |
| 32 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 487.5 | LF |
$20.00 |
$17.17 |
$20.00 |
$20.00 |
| 33 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,600.00 |
$2,201.04 |
$2,700.00 |
$2,700.00 |
| 34 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,262.60 |
$2,250.00 |
$2,300.00 |
| 35 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,791 | LF |
$3.00 |
$4.86 |
$11.00 |
$8.00 |
| 36 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,556 | LF |
$5.00 |
$5.29 |
$12.00 |
$9.00 |
| 37 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$15.00 |
$23.40 |
$14.00 |
$20.00 |
| 38 | 501(G) 6309 |
CLSM BACKFILL | 304 | CY |
$150.00 |
$167.43 |
$175.00 |
$180.00 |
| 39 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 519 | LF |
$285.00 |
$295.17 |
$345.00 |
$340.00 |
| 40 | 504(A) 1304 |
APPROACH SLAB | 271.8 | SY |
$220.00 |
$188.61 |
$215.00 |
$150.00 |
| 41 | 504(B) 1305 |
SAW-CUT GROOVING | 837.8 | SY |
$5.00 |
$4.68 |
$4.80 |
$6.00 |
| 42 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 377 | LF |
$90.00 |
$108.26 |
$103.50 |
$85.00 |
| 43 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$3.00 |
$3.39 |
$3.00 |
$3.00 |
| 44 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,200.00 |
$1,815.24 |
$1,400.00 |
$1,500.00 |
| 45 | 509(A) 1326 |
CLASS AA CONCRETE | 214.5 | CY |
$550.00 |
$582.14 |
$675.00 |
$580.00 |
| 46 | 509(B) 1328 |
CLASS A CONCRETE | 69.2 | CY |
$600.00 |
$552.89 |
$699.50 |
$680.00 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 51,800 | LB |
$1.10 |
$1.28 |
$1.09 |
$1.50 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,164 | LF |
$40.00 |
$40.48 |
$32.20 |
$35.00 |
| 49 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,164 | LF |
$20.00 |
$11.70 |
$13.80 |
$30.00 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 661 | SY |
$4.00 |
$4.27 |
$4.40 |
$7.00 |
| 52 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,733 | TON |
$40.00 |
$43.62 |
$38.27 |
$50.00 |
| 53 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 826 | TON |
$30.00 |
$35.57 |
$31.40 |
$40.00 |
| 54 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$29.25 |
$35.00 |
$25.00 |
| 55 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$30.00 |
$29.25 |
$50.00 |
$25.00 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$117,000.00 |
$19,000.00 |
$125,000.00 |
| 57 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 39 | SF |
$18.00 |
$30.24 |
$24.00 |
$24.00 |
| 58 | 851(C) 8324 |
2" SQUARE TUBE POST | 81 | LF |
$8.00 |
$8.64 |
$12.00 |
$14.00 |
| 59 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$15.00 |
$7.34 |
$18.00 |
$9.00 |
| 60 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,800 | LF |
$1.00 |
$0.9200 |
$0.6500 |
$0.6000 |
| 61 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 21,600 | SD |
$0.2500 |
$0.0200 |
$0.0200 |
$0.0400 |
| 62 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,350 | SD |
$0.7500 |
$0.0500 |
$0.6000 |
$0.7000 |
| 63 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 900 | SD |
$1.25 |
$4.32 |
$2.80 |
$3.00 |
| 64 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.3000 |
$3.24 |
$1.20 |
$2.00 |
| 65 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$1.00 |
$0.3200 |
$0.0500 |
$0.1000 |
| 66 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.1500 |
$0.5400 |
$3.25 |
$3.50 |
| 67 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 540 | SD |
$12.00 |
$5.40 |
$12.00 |
$25.00 |
| 68 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$13,770.00 |
$16,500.00 |
$15,000.00 |
| 69 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,780.00 |
$8,000.00 |
$3,500.00 |
| 70 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$5,400.00 |
$10,500.00 |
$18,000.00 |
| 71 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$105,000.00 |
$111,675.25 |
$85,000.00 |
$130,000.00 |