| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,604 | CY |
$8.50 |
$22.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,100 | CY |
$15.00 |
$22.00 |
| 4 | 209 0120 |
MACHINE GRADING | 6,795 | LF |
$6.00 |
$5.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,900 | LF |
$2.10 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$9.00 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,810 | SY |
$2.00 |
$2.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.42 | AC |
$500.00 |
$1,500.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,021 | CY |
$48.00 |
$65.00 |
| 10 | 307(A) 4200 |
FLY ASH | 1,028 | TON |
$62.50 |
$73.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 20,385 | SY |
$3.00 |
$4.00 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 3,776 | SY |
$2.00 |
$4.00 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,862 | TON |
$28.00 |
$34.00 |
| 14 | 407(B) 0250 |
TACK COAT | 2,965 | GAL |
$3.10 |
$2.50 |
| 15 | 408 5774 |
PRIME COAT | 16,727 | GAL |
$3.80 |
$7.00 |
| 16 | 409(A) 4242 |
FABRIC REINFORCEMENT | 21,785 | SY |
$1.20 |
$1.20 |
| 17 | 409(B) 4268 |
BITUMINOUS BINDER | 4,357 | GAL |
$3.30 |
$4.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,256.5 | TON |
$95.00 |
$75.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,589.5 | TON |
$92.00 |
$87.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 16,610 | SY |
$2.65 |
$4.00 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 19.8 | CY |
$550.00 |
$2,500.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$500.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 3,330 | LB |
$1.00 |
$6.30 |
| 24 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 36 | LF |
$60.00 |
$50.00 |
| 25 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 4 | LF |
$150.00 |
$500.00 |
| 26 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 3 | LF |
$150.00 |
$500.00 |
| 27 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 28 | LF |
$40.00 |
$50.00 |
| 28 | 613(I) 1094 |
4" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$25.00 |
$50.00 |
| 29 | 613(L) 4640 |
49" X 33" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$1,500.00 |
$1,000.00 |
| 30 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,200.00 |
$750.00 |
| 31 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,000.00 |
$1,500.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,445 | SY |
$6.50 |
$9.50 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 2,642 | LF |
$4.00 |
$3.00 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,368.75 | LF |
$16.50 |
$18.50 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 5 | EA |
$2,000.00 |
$2,500.00 |
| 36 | 625(B) 1252 |
REMOVE AND RECONSTRUCT FENCE | 600 | LF |
$5.00 |
$10.00 |
| 37 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 8 | EA |
$100.00 |
$100.00 |
| 38 | 629(C) 4960 |
MAILBOX | 8 | EA |
$50.00 |
$50.00 |
| 39 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 8 | EA |
$30.00 |
$50.00 |
| 40 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 3 | EA |
$130.00 |
$300.00 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$165.00 |
$200.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 27 | TON |
$42.00 |
$56.00 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 9 | TON |
$40.00 |
$50.00 |
| 44 | 501(G) 6309 |
CLSM BACKFILL | 10 | CY |
$140.00 |
$200.00 |
| 45 | 509(A) 1326 |
CLASS AA CONCRETE | 90.5 | CY |
$550.00 |
$1,300.00 |
| 46 | 511(A) 1332 |
REINFORCING STEEL | 13,040 | LB |
$1.00 |
$6.30 |
| 47 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 167 | TON |
$42.00 |
$60.00 |
| 48 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 63 | TON |
$40.00 |
$50.00 |
| 49 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 30 | SD |
$150.00 |
$275.00 |
| 50 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 14 | EA |
$40.00 |
$20.00 |
| 51 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 53,985 | LF |
$0.5500 |
$0.5000 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$35,000.00 |
$10,000.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$15,000.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$5,000.00 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$38,000.00 |