| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$18,185.00 |
$11,220.00 |
$20,491.21 |
$12,000.00 |
$5,000.00 |
$22,000.00 |
$45,000.00 |
| 2 | 202(F) 0110 |
EMBANKMENTS | 2,909.4 | CY |
$15.00 |
$21.80 |
$16.34 |
$14.00 |
$14.00 |
$17.60 |
$20.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$21,900.00 |
$14,085.24 |
$12,000.00 |
$4,000.00 |
$9,350.00 |
$2,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 719.9 | LF |
$2.00 |
$2.35 |
$1.46 |
$4.00 |
$5.28 |
$1.43 |
$1.35 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 251 | LF |
$7.20 |
$13.50 |
$7.96 |
$9.00 |
$11.89 |
$7.77 |
$7.45 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,403.2 | SY |
$2.65 |
$2.75 |
$2.48 |
$2.50 |
$2.97 |
$2.42 |
$2.35 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.5 | AC |
$700.00 |
$1,650.00 |
$394.39 |
$2,000.00 |
$2,641.66 |
$385.00 |
$360.00 |
| 8 | 241 2832 |
MOWING | 0.5 | AC |
$120.00 |
$198.00 |
$169.02 |
$250.00 |
$330.20 |
$165.00 |
$155.00 |
| 9 | 307(D) 4230 |
LIME | 61 | TON |
$170.00 |
$199.00 |
$185.92 |
$175.00 |
$155.00 |
$172.70 |
$191.00 |
| 10 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 3,385.9 | SY |
$3.60 |
$6.55 |
$4.28 |
$6.50 |
$3.25 |
$6.60 |
$7.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 621.7 | TON |
$33.56 |
$49.60 |
$42.82 |
$40.45 |
$42.00 |
$47.30 |
$40.00 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 753 | TON |
$89.00 |
$85.50 |
$91.89 |
$97.00 |
$88.50 |
$88.33 |
$84.00 |
| 13 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 251 | TON |
$101.00 |
$99.50 |
$106.98 |
$110.00 |
$103.02 |
$99.55 |
$98.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$334.00 |
$563.41 |
$265.00 |
$600.00 |
$443.28 |
$300.00 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 235.2 | LF |
$35.00 |
$32.80 |
$39.44 |
$34.00 |
$39.00 |
$29.37 |
$35.00 |
| 16 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,039.00 |
$1,395.00 |
$1,170.77 |
$1,000.00 |
$1,100.00 |
$1,389.25 |
$985.00 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,431.00 |
$8,140.00 |
$16,261.13 |
$17,000.00 |
$15,000.00 |
$22,000.00 |
$7,000.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,241 | SY |
$4.00 |
$4.45 |
$4.51 |
$6.00 |
$5.94 |
$4.54 |
$8.50 |
| 19 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 164.4 | LF |
$3.70 |
$3.85 |
$3.95 |
$5.00 |
$4.70 |
$4.40 |
$6.00 |
| 20 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 104.2 | LF |
$13.59 |
$11.00 |
$15.31 |
$17.00 |
$5.00 |
$13.20 |
$16.00 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 50 | LF |
$13.60 |
$11.00 |
$15.33 |
$3.00 |
$6.00 |
$8.80 |
$7.00 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 412.5 | LF |
$5.80 |
$17.50 |
$17.86 |
$18.00 |
$21.24 |
$17.44 |
$23.00 |
| 23 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$17.00 |
$93.50 |
$95.78 |
$100.00 |
$113.93 |
$93.50 |
$132.00 |
| 24 | 629(C) 4960 |
MAILBOX | 2 | EA |
$79.00 |
$27.50 |
$28.17 |
$28.00 |
$33.51 |
$27.50 |
$80.00 |
| 25 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$32.00 |
$55.00 |
$169.02 |
$70.00 |
$52.84 |
$33.00 |
$80.00 |
| 26 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 218 | CY |
$14.00 |
$15.50 |
$5.00 |
$16.00 |
$15.00 |
$16.50 |
$45.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 408.8 | CY |
$450.00 |
$415.00 |
$396.68 |
$535.00 |
$550.00 |
$501.86 |
$655.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 37,617 | LB |
$1.00 |
$1.10 |
$0.9000 |
$1.00 |
$1.10 |
$1.12 |
$1.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$28,000.00 |
$50,706.86 |
$32,000.00 |
$19,755.00 |
$71,500.00 |
$46,207.00 |
| 30 | 623(G) 8580 |
GUARDRAIL END TREATMENT (SRT) | 4 | EA |
$1,800.00 |
$2,420.00 |
$2,524.07 |
$2,675.00 |
$3,002.18 |
$2,464.00 |
$1,985.00 |
| 31 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,800 | LF |
$0.2000 |
$0.2900 |
$0.3000 |
$0.3500 |
$0.3600 |
$0.3000 |
$0.6300 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,600.00 |
$1,656.42 |
$2,900.00 |
$1,970.19 |
$1,617.00 |
$2,600.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$8,000.00 |
$8,732.85 |
$14,000.00 |
$10,236.39 |
$8,525.00 |
$8,000.00 |
| 34 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$5,070.68 |
$7,000.00 |
$2,124.16 |
$2,750.00 |
$1,850.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$34,750.00 |
$37,563.53 |
$16,000.00 |
$57,000.00 |
$57,077.08 |
$63,500.00 |
| 36 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 250 | LF |
$9.00 |
$12.00 |
$28.17 |
$15.00 |
$15.85 |
$13.20 |
$12.50 |