| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$24,640.00 |
$25,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,530 | CY |
$6.50 |
$5.04 |
$8.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,760 | CY |
$9.00 |
$5.88 |
$12.00 |
$16.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,600 | LF |
$2.00 |
$1.49 |
$4.00 |
$1.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 220 | LF |
$10.00 |
$8.33 |
$8.00 |
$9.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 13,710 | SY |
$2.00 |
$1.50 |
$3.00 |
$1.60 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.4 | AC |
$600.00 |
$665.28 |
$350.00 |
$800.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,375 | TON |
$25.00 |
$30.96 |
$35.00 |
$31.00 |
| 9 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 68 | CY |
$15.00 |
$16.80 |
$25.00 |
$20.00 |
| 10 | 509(A) 0319 |
CLASS AA CONCRETE | 90 | CY |
$400.00 |
$603.09 |
$650.00 |
$560.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$461.48 |
$300.00 |
$400.00 |
| 12 | 511(A) 0332 |
REINFORCING STEEL | 14,840 | LB |
$1.00 |
$1.14 |
$1.00 |
$1.00 |
| 13 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 108 | LF |
$150.00 |
$132.22 |
$155.00 |
$120.00 |
| 14 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$4,193.66 |
$3,500.00 |
$1,600.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$2,800.00 |
$5,000.00 |
$20,000.00 |
| 16 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,900 | CY |
$6.50 |
$8.96 |
$10.00 |
$10.00 |
| 17 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 240 | CY |
$15.00 |
$28.00 |
$25.00 |
$20.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 270.2 | CY |
$550.00 |
$575.09 |
$550.00 |
$560.00 |
| 19 | 511(A) 1332 |
REINFORCING STEEL | 47,020 | LB |
$1.00 |
$1.14 |
$1.00 |
$1.00 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$16.00 |
$16.80 |
$15.00 |
$20.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$60.00 |
$76.91 |
$50.00 |
$65.00 |
| 22 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 328 | LF |
$185.00 |
$189.85 |
$198.00 |
$190.00 |
| 23 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$200.00 |
$244.01 |
$240.00 |
$280.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.06 | LF |
$250.00 |
$308.81 |
$285.00 |
$200.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 507.5 | LF |
$85.00 |
$96.78 |
$75.00 |
$75.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 1,330 | LB |
$4.00 |
$3.49 |
$1.90 |
$3.00 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$850.00 |
$1,054.12 |
$550.00 |
$800.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$850.00 |
$1,085.13 |
$550.00 |
$800.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 173.9 | CY |
$550.00 |
$588.99 |
$600.00 |
$560.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 163.4 | CY |
$520.00 |
$610.73 |
$650.00 |
$600.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 72,310 | LB |
$1.00 |
$1.14 |
$1.00 |
$1.00 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 172 | LF |
$34.00 |
$41.09 |
$40.00 |
$28.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 406 | LF |
$40.00 |
$47.81 |
$50.00 |
$38.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 172 | LF |
$12.00 |
$11.20 |
$15.00 |
$35.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 406 | LF |
$12.00 |
$11.20 |
$15.00 |
$35.00 |
| 36 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 186 | LF |
$850.00 |
$879.25 |
$950.00 |
$1,200.00 |
| 37 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 670 | TON |
$40.00 |
$39.81 |
$40.00 |
$45.00 |
| 38 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 200 | TON |
$30.00 |
$32.06 |
$35.00 |
$30.00 |
| 39 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$33.08 |
$25.00 |
$20.00 |
| 40 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$30.07 |
$15.00 |
$20.00 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$56,000.00 |
$20,000.00 |
$50,000.00 |
| 42 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$20.00 |
$18.48 |
$21.00 |
$16.00 |
| 43 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 4 | EA |
$800.00 |
$694.40 |
$500.00 |
$850.00 |
| 44 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,848.00 |
$2,300.00 |
$1,900.00 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$2,800.00 |
$4,000.00 |
$3,500.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$10,920.00 |
$5,000.00 |
$15,000.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$3,360.00 |
$3,500.00 |
$3,500.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$88,000.00 |
$67,131.30 |
$58,000.00 |
$90,000.00 |