| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$16,000.00 |
$11,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,497 | CY |
$9.35 |
$9.25 |
$11.55 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 940 | CY |
$14.85 |
$12.00 |
$9.00 |
$25.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,045 | LF |
$3.75 |
$2.50 |
$1.65 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 225 | LF |
$8.50 |
$10.00 |
$8.45 |
$10.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 10,625 | SY |
$2.85 |
$2.25 |
$1.86 |
$2.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.54 | AC |
$600.00 |
$1,000.00 |
$650.00 |
$600.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,535 | TON |
$40.00 |
$31.20 |
$26.95 |
$44.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 34.6 | CY |
$325.00 |
$300.00 |
$335.00 |
$780.00 |
| 10 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 34 | LF |
$35.00 |
$40.00 |
$31.00 |
$50.00 |
| 11 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$400.00 |
$550.00 |
$335.00 |
$500.00 |
| 12 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$4,000.00 |
$4,000.00 |
$4,000.00 |
| 13 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,750.00 |
$1,850.00 |
$1,700.00 |
$2,650.00 |
| 14 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,750.00 |
$1,750.00 |
$1,600.00 |
$2,400.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$20.00 |
$12.00 |
$8.75 |
$29.00 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 138 | CY |
$65.00 |
$55.00 |
$72.50 |
$61.00 |
| 17 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$295.00 |
$302.00 |
$365.00 |
$540.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$80.00 |
$75.00 |
$73.00 |
$150.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 1,100 | LB |
$3.50 |
$2.15 |
$2.75 |
$5.00 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$950.00 |
$1,388.00 |
$2,500.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$950.00 |
$1,388.00 |
$2,500.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 120.4 | CY |
$625.00 |
$480.00 |
$610.00 |
$950.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 89.6 | CY |
$625.00 |
$480.00 |
$637.50 |
$950.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 44,840 | LB |
$1.00 |
$1.00 |
$0.9400 |
$1.40 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 130 | LF |
$35.00 |
$33.00 |
$37.80 |
$39.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 372 | LF |
$37.00 |
$36.50 |
$39.90 |
$56.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 100 | LF |
$14.00 |
$30.00 |
$16.20 |
$50.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 319 | LF |
$15.00 |
$27.00 |
$17.10 |
$40.00 |
| 29 | 514(K) 6260 |
(PL)PILOT HOLES | 74 | LF |
$275.00 |
$393.30 |
$400.00 |
$670.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,546 | TON |
$40.00 |
$36.00 |
$36.39 |
$58.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 474 | TON |
$36.00 |
$35.00 |
$29.72 |
$48.00 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$25.00 |
$40.00 |
$40.00 |
$27.00 |
| 33 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$10.00 |
$40.00 |
$27.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$12,500.00 |
$80,000.00 |
| 35 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 17 | SF |
$20.00 |
$40.00 |
$25.00 |
$35.00 |
| 36 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 27 | LF |
$10.00 |
$20.00 |
$15.00 |
$18.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$3,000.00 |
$5,000.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$9,750.00 |
$50,000.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$3,500.00 |
$3,900.00 |
$6,000.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,000.00 |
$35,000.00 |
$46,000.00 |
$120,000.00 |