| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$4,000.00 |
$13,465.41 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$60,000.00 |
$165,000.00 |
$275,000.00 |
$182,057.84 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$50,000.00 |
$30,556.13 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,612 | LF |
$4.00 |
$2.26 |
$2.00 |
$3.09 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 620 | LF |
$10.00 |
$14.58 |
$9.00 |
$8.79 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 30 | CY |
$25.00 |
$277.51 |
$35.00 |
$93.92 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 30,000 | SY |
$2.00 |
$1.59 |
$1.75 |
$1.65 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.65 | AC |
$9,500.00 |
$795.00 |
$875.00 |
$823.46 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,842 | CY |
$40.00 |
$36.00 |
$40.00 |
$39.70 |
| 10 | 307(B) 4210 |
CEMENT KILN DUST | 83 | TON |
$100.00 |
$45.64 |
$40.00 |
$37.84 |
| 11 | 307(J) 4290 |
MODIFIED SUBGRADE | 4,600 | SY |
$6.00 |
$3.03 |
$1.00 |
$5.15 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 30,400 | SY |
$1.50 |
$1.08 |
$0.2500 |
$1.92 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 33,374 | SY |
$2.00 |
$1.30 |
$1.00 |
$1.48 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 533 | TON |
$25.00 |
$27.50 |
$20.00 |
$27.53 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,321 | TON |
$75.00 |
$69.50 |
$60.00 |
$62.86 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,751 | TON |
$80.00 |
$89.75 |
$70.00 |
$78.36 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 9 | CY |
$600.00 |
$498.00 |
$800.00 |
$516.61 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 54 | CY |
$500.00 |
$250.00 |
$650.00 |
$621.48 |
| 19 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 12 | CY |
$500.00 |
$539.58 |
$1,000.00 |
$339.57 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$275.00 |
$512.00 |
$435.00 |
$530.33 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 12,035 | LB |
$1.40 |
$0.6300 |
$2.00 |
$0.6500 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 50 | TON |
$50.00 |
$35.00 |
$33.00 |
$60.28 |
| 23 | 609(B) 0383 |
COMBINED CURB & GUTTER (6" BARRIER) | 485 | LF |
$15.00 |
$22.21 |
$20.00 |
$13.46 |
| 24 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 5 | SY |
$50.00 |
$80.00 |
$75.00 |
$51.53 |
| 25 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 260 | SY |
$70.00 |
$56.00 |
$85.00 |
$61.76 |
| 26 | 610(G) 0617 |
ASPHALT DRIVEWAY | 76 | TON |
$65.00 |
$90.00 |
$90.00 |
$110.53 |
| 27 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 2 | EA |
$4,000.00 |
$2,929.17 |
$5,000.00 |
$2,150.47 |
| 28 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 2 | EA |
$4,000.00 |
$2,152.56 |
$4,000.00 |
$1,998.00 |
| 29 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 57 | LF |
$60.00 |
$59.34 |
$70.00 |
$41.01 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 950 | LF |
$50.00 |
$34.24 |
$40.00 |
$34.18 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 161 | LF |
$55.00 |
$47.66 |
$45.00 |
$44.69 |
| 32 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$800.00 |
$417.57 |
$400.00 |
$622.54 |
| 33 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 22 | EA |
$2,000.00 |
$1,350.00 |
$1,000.00 |
$2,174.92 |
| 34 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 8 | EA |
$3,000.00 |
$1,650.00 |
$2,500.00 |
$2,669.16 |
| 35 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 230 | CY |
$20.00 |
$24.00 |
$45.00 |
$51.53 |
| 36 | 613(V) 1180 |
TRENCH EXCAVATION | 1,500 | CY |
$5.50 |
$25.00 |
$10.00 |
$11.57 |
| 37 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$3,000.00 |
$1,309.23 |
$800.00 |
$2,247.93 |
| 38 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 520 | LF |
$4.50 |
$10.36 |
$2.00 |
$4.22 |
| 39 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 356 | SY |
$10.00 |
$6.79 |
$8.00 |
$11.59 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,550 | SY |
$3.50 |
$3.00 |
$2.00 |
$3.35 |
| 41 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 16 | EA |
$1,000.00 |
$516.87 |
$500.00 |
$1,004.12 |
| 42 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 394 | LF |
$10.00 |
$3.00 |
$3.00 |
$3.11 |
| 43 | 619(C) 0924 |
SAWING PAVEMENT | 550 | LF |
$2.00 |
$2.50 |
$5.00 |
$4.34 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 650 | LF |
$30.00 |
$15.50 |
$17.00 |
$15.24 |
| 45 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$650.00 |
$1,650.00 |
$1,800.00 |
$802.75 |
| 46 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,800.00 |
$2,100.00 |
$2,300.00 |
$2,278.76 |
| 47 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 21,595 | LF |
$0.7500 |
$0.4300 |
$0.5000 |
$0.5000 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$10,000.00 |
$11,186.65 |
| 49 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 169 | CY |
$13.50 |
$24.00 |
$15.00 |
$25.90 |
| 50 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 149 | CY |
$11.30 |
$35.00 |
$15.00 |
$51.79 |
| 51 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 80 | LF |
$90.00 |
$128.40 |
$100.00 |
$155.37 |
| 52 | 508 6335 |
REMOVAL OF CULVERT END | 1 | EA |
$250.00 |
$8,500.00 |
$5,000.00 |
$8,804.31 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 197 | CY |
$425.00 |
$409.77 |
$600.00 |
$424.44 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 50 | CY |
$475.00 |
$275.00 |
$600.00 |
$414.32 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 31,720 | LB |
$1.00 |
$0.6300 |
$1.10 |
$0.6500 |
| 56 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 145 | TON |
$50.00 |
$30.23 |
$35.00 |
$55.12 |
| 57 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$17.20 |
$15.50 |
$17.00 |
$15.24 |
| 58 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$2,500.00 |
$450.00 |
$500.00 |
$802.75 |
| 59 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,300.00 |
$2,100.00 |
$2,300.00 |
$2,278.76 |
| 60 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,600.00 |
$1,650.00 |
$1,800.00 |
$1,450.12 |
| 61 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$30,450.00 |
$25,000.00 |
$31,540.13 |
| 62 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,806.38 |
$3,000.00 |
$5,179.00 |
| 63 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$55,000.00 |
$125,000.00 |
$185,583.74 |
| 64 | 629(C) 4960 |
MAILBOX | 3 | EA |
$200.00 |
$252.07 |
$200.00 |
$258.95 |