| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,568.25 |
$6,800.00 |
$20,500.00 |
$1,600.00 |
$11,000.00 |
$8,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 835 | CY |
$7.25 |
$10.00 |
$6.15 |
$19.00 |
$11.75 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,040 | CY |
$10.00 |
$15.00 |
$9.50 |
$20.00 |
$24.00 |
$35.00 |
| 4 | 221(A) 2800 |
TEMPORARY SLOPE DRAINS | 100 | LF |
$25.00 |
$22.11 |
$22.00 |
$27.00 |
$28.00 |
$25.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,190 | LF |
$1.90 |
$2.21 |
$2.00 |
$2.00 |
$2.20 |
$1.80 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$8.00 |
$11.06 |
$10.00 |
$8.00 |
$8.80 |
$9.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,936 | SY |
$2.50 |
$3.32 |
$3.35 |
$2.50 |
$2.75 |
$3.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.4 | AC |
$586.75 |
$2,211.40 |
$2,000.00 |
$1,000.00 |
$600.00 |
$1,300.00 |
| 9 | 241 2832 |
MOWING | 0.8 | AC |
$70.00 |
$221.14 |
$200.00 |
$100.00 |
$110.00 |
$1,300.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 596.8 | CY |
$54.25 |
$65.00 |
$55.00 |
$86.00 |
$71.00 |
$80.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 635.7 | TON |
$91.75 |
$67.39 |
$99.00 |
$89.50 |
$110.00 |
$110.00 |
| 12 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 317.8 | TON |
$102.00 |
$91.66 |
$109.00 |
$99.00 |
$120.00 |
$120.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 1.1 | CY |
$350.00 |
$800.00 |
$300.00 |
$1,200.00 |
$1,000.00 |
$1,200.00 |
| 14 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 955 | LF |
$17.75 |
$25.00 |
$19.00 |
$26.00 |
$30.00 |
$28.00 |
| 15 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 530.6 | SY |
$33.25 |
$40.00 |
$36.00 |
$43.00 |
$50.00 |
$45.00 |
| 16 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 16 | SF |
$49.75 |
$25.00 |
$50.00 |
$47.00 |
$50.00 |
$25.00 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,251.00 |
$4,000.00 |
$20,000.00 |
$7,100.00 |
$11,250.00 |
$30,000.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,040 | SY |
$4.00 |
$2.75 |
$5.25 |
$4.25 |
$5.00 |
$6.00 |
| 19 | 622(A) 4746 |
PIPE RAILING | 5 | LF |
$130.00 |
$100.00 |
$87.00 |
$93.00 |
$200.00 |
$75.00 |
| 20 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 11.19 | SF |
$19.25 |
$16.59 |
$16.00 |
$15.00 |
$16.50 |
$18.00 |
| 21 | 851(C) 8324 |
2" SQUARE TUBE POST | 32 | LF |
$11.25 |
$8.85 |
$9.00 |
$15.00 |
$8.80 |
$17.00 |
| 22 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,600 | LF |
$1.00 |
$0.4400 |
$0.4500 |
$1.00 |
$0.4400 |
$1.10 |
| 23 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 500 | LF |
$1.25 |
$1.11 |
$1.10 |
$2.00 |
$1.10 |
$2.20 |
| 24 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 120 | LF |
$6.75 |
$6.63 |
$6.60 |
$6.00 |
$6.60 |
$7.00 |
| 25 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 6 | EA |
$101.00 |
$82.93 |
$83.00 |
$85.00 |
$82.50 |
$100.00 |
| 26 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,850 | LF |
$0.2500 |
$0.1700 |
$0.1700 |
$0.2000 |
$0.1700 |
$0.2500 |
| 27 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,000 | EA |
$0.7500 |
$0.5500 |
$0.5600 |
$1.00 |
$0.5500 |
$1.10 |
| 28 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,500 | LF |
$0.7500 |
$0.2800 |
$0.2800 |
$0.5000 |
$0.2800 |
$0.6000 |
| 29 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 2,430 | SD |
$0.7500 |
$1.11 |
$1.11 |
$0.1000 |
$1.10 |
$0.1500 |
| 30 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 625 | LF |
$20.00 |
$5.00 |
$37.25 |
$35.00 |
$23.00 |
$24.00 |
| 31 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 480 | LF |
$5.00 |
$4.00 |
$8.00 |
$5.00 |
$5.00 |
$2.00 |
| 32 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 270 | SD |
$6.00 |
$4.42 |
$4.45 |
$10.00 |
$4.40 |
$12.00 |
| 33 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,090 | SD |
$0.2500 |
$0.1100 |
$0.1100 |
$0.2000 |
$0.1100 |
$0.2400 |
| 34 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,670 | SD |
$0.5000 |
$0.2800 |
$0.2800 |
$1.25 |
$0.2800 |
$1.60 |
| 35 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,700 | SD |
$1.25 |
$1.66 |
$1.67 |
$2.00 |
$1.65 |
$2.60 |
| 36 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,670 | SD |
$0.2500 |
$0.5500 |
$0.5600 |
$0.2200 |
$0.5500 |
$0.3000 |
| 37 | 880(C) 8848 |
WING BARRICADES | 2,160 | SD |
$0.5000 |
$0.1100 |
$0.1100 |
$1.00 |
$0.1100 |
$1.40 |
| 38 | 880(D) 8854 |
VERTICAL PANELS | 4,860 | SD |
$0.2500 |
$0.2200 |
$0.2200 |
$0.1000 |
$0.2200 |
$0.1500 |
| 39 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,040 | SD |
$0.2500 |
$0.2800 |
$0.2800 |
$0.2000 |
$0.2800 |
$0.2500 |
| 40 | 880(F) 8878 |
DRUMS | 29,970 | SD |
$0.2500 |
$0.1100 |
$0.1100 |
$0.1500 |
$0.1100 |
$0.2000 |
| 41 | 880(G) 8890 |
CHANNELIZER CONES | 12,150 | SD |
$0.2500 |
$0.3300 |
$0.3300 |
$0.1500 |
$0.3300 |
$0.2000 |
| 42 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 270 | SD |
$250.00 |
$641.30 |
$300.00 |
$225.00 |
$616.00 |
$250.00 |
| 43 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 200 | HOUR |
$54.50 |
$60.86 |
$100.00 |
$65.00 |
$90.00 |
$48.00 |
| 44 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,080 | SD |
$11.75 |
$8.85 |
$8.90 |
$35.00 |
$8.80 |
$40.00 |
| 45 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$13.90 |
$15.00 |
$20.00 |
$16.00 |
$13.50 |
$40.00 |
| 46 | 501(F) 6352 |
GRANULAR BACKFILL | 166 | CY |
$45.10 |
$50.00 |
$65.00 |
$53.00 |
$75.00 |
$45.00 |
| 47 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 894 | LF |
$186.00 |
$175.00 |
$172.00 |
$230.00 |
$165.00 |
$255.00 |
| 48 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 627 | LF |
$179.25 |
$200.00 |
$189.00 |
$230.00 |
$197.00 |
$285.00 |
| 49 | 504(A) 1304 |
APPROACH SLAB | 346 | SY |
$173.00 |
$165.00 |
$225.00 |
$200.00 |
$258.00 |
$180.00 |
| 50 | 504(B) 1305 |
SAW-CUT GROOVING | 1,513.5 | SY |
$4.75 |
$5.00 |
$6.00 |
$4.50 |
$4.95 |
$2.50 |
| 51 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 345.7 | LF |
$62.25 |
$85.00 |
$90.00 |
$95.00 |
$96.00 |
$100.00 |
| 52 | 504(E) 1381 |
CONCRETE PARAPET | 80 | LF |
$143.50 |
$75.00 |
$80.00 |
$69.00 |
$92.50 |
$120.00 |
| 53 | 504(F) 6006 |
HANDRAILING | 425.7 | LF |
$54.00 |
$165.00 |
$165.00 |
$175.00 |
$155.00 |
$140.00 |
| 54 | 506(A) 1322 |
STRUCTURAL STEEL | 2,090 | LB |
$3.30 |
$4.65 |
$2.25 |
$3.40 |
$3.00 |
$2.50 |
| 55 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$760.00 |
$1,265.00 |
$400.00 |
$1,000.00 |
$500.00 |
$270.00 |
| 56 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 36 | EA |
$2,824.45 |
$1,765.00 |
$3,000.00 |
$2,500.00 |
$2,400.00 |
$3,000.00 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 420 | CY |
$462.50 |
$640.00 |
$570.00 |
$625.00 |
$582.50 |
$900.00 |
| 58 | 509(B) 1328 |
CLASS A CONCRETE | 202.6 | CY |
$469.60 |
$645.00 |
$560.00 |
$700.00 |
$605.00 |
$600.00 |
| 59 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 128,760 | LB |
$1.10 |
$1.15 |
$1.05 |
$1.20 |
$1.08 |
$1.20 |
| 60 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 946 | LF |
$27.75 |
$28.00 |
$34.00 |
$33.00 |
$32.20 |
$27.00 |
| 61 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 946 | LF |
$10.75 |
$25.00 |
$11.00 |
$19.00 |
$13.80 |
$70.00 |
| 62 | 514(H) 6355 |
SHEET PILING, FURNISHED | 1,593 | SY |
$350.00 |
$40.00 |
$138.00 |
$35.00 |
$185.50 |
$40.00 |
| 63 | 514(I) 6360 |
SHEET PILING, DRIVEN | 1,593 | SY |
$65.00 |
$25.00 |
$40.00 |
$25.00 |
$79.50 |
$38.00 |
| 64 | 514(K) 6260 |
(PL)PILOT HOLES | 160 | LF |
$100.00 |
$60.00 |
$75.00 |
$73.00 |
$65.00 |
$85.00 |
| 65 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 149 | SY |
$4.80 |
$4.40 |
$7.00 |
$4.00 |
$4.40 |
$6.00 |
| 66 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 386.2 | LF |
$390.25 |
$480.00 |
$570.00 |
$550.00 |
$610.00 |
$500.00 |
| 67 | 523(A) 6550 |
SEALER CRACK PREPARATION | 311.3 | LF |
$3.90 |
$4.45 |
$4.50 |
$5.70 |
$4.40 |
$10.00 |
| 68 | 523(B) 6560 |
SEALER RESIN | 3.3 | GAL |
$160.80 |
$115.00 |
$225.00 |
$140.00 |
$110.00 |
$80.00 |
| 69 | 601(E) 1359 |
TYPE II-A SPECIAL PLAIN RIPRAP | 920 | TON |
$45.00 |
$55.00 |
$43.00 |
$49.00 |
$44.34 |
$50.00 |
| 70 | 601(F) 1361 |
TYPE II-A FILTER BLANKET | 195 | TON |
$35.00 |
$45.00 |
$36.00 |
$43.00 |
$36.00 |
$60.00 |
| 71 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 156 | LF |
$19.80 |
$17.00 |
$25.00 |
$18.00 |
$35.00 |
$25.00 |
| 72 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$19.25 |
$13.00 |
$25.00 |
$18.00 |
$40.00 |
$25.00 |
| 73 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$45,000.00 |
$95,000.00 |
$66,000.00 |
$53,000.00 |
$100,000.00 |
| 74 | 622(A) 4746 |
PIPE RAILING | 340.7 | LF |
$110.00 |
$75.00 |
$175.00 |
$96.00 |
$135.00 |
$95.00 |
| 75 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,942.00 |
$8,569.14 |
$17,500.00 |
$20,000.00 |
$10,500.00 |
$25,000.00 |
| 76 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$151,810.00 |
$75,000.00 |
$57,000.00 |
$220,000.00 |
$98,000.00 |
$155,554.73 |