| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$4,000.00 |
$16,700.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,070 | CY |
$5.50 |
$6.50 |
$6.95 |
$7.00 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$9.00 |
$5.00 |
$8.15 |
$8.15 |
$8.60 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$9,000.00 |
$15,000.00 |
$12,400.00 |
$12,500.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 647 | LF |
$1.50 |
$2.00 |
$1.94 |
$2.00 |
$5.25 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$8.00 |
$8.12 |
$11.34 |
$11.35 |
$6.30 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 21,273 | SY |
$2.50 |
$2.85 |
$1.48 |
$1.45 |
$2.89 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.4 | AC |
$400.00 |
$520.00 |
$688.00 |
$700.00 |
$525.00 |
| 9 | 241 2832 |
MOWING | 4.4 | AC |
$75.00 |
$10.00 |
$132.00 |
$135.00 |
$157.50 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,072 | CY |
$40.00 |
$39.00 |
$48.00 |
$49.00 |
$60.75 |
| 11 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 19,253 | SY |
$2.50 |
$1.80 |
$1.75 |
$1.55 |
$2.30 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,446 | TON |
$30.00 |
$18.50 |
$22.70 |
$23.50 |
$28.70 |
| 13 | 407(B) 0250 |
TACK COAT | 1,799 | GAL |
$3.00 |
$2.30 |
$3.60 |
$3.30 |
$5.75 |
| 14 | 408 5774 |
PRIME COAT | 5,018 | GAL |
$3.50 |
$1.00 |
$6.50 |
$5.00 |
$6.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,763 | TON |
$70.00 |
$78.00 |
$72.25 |
$85.00 |
$95.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 627 | TON |
$85.00 |
$88.00 |
$116.28 |
$99.00 |
$105.00 |
| 17 | 411(C) 5965 |
(SP) SUPERPAVE, TYPE S4(PG 76-28 E) | 850 | TON |
$90.00 |
$150.00 |
$114.87 |
$115.00 |
$150.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 213.44 | CY |
$250.00 |
$250.00 |
$260.00 |
$370.00 |
$500.00 |
| 19 | 609(B) 1500 |
1'-8" COMB. CURB & GUTTER (4" MNTBLE) | 128 | LF |
$16.00 |
$20.00 |
$28.00 |
$25.00 |
$36.00 |
| 20 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 187 | LF |
$20.00 |
$20.00 |
$30.00 |
$31.00 |
$38.00 |
| 21 | 610(H) 4478 |
ASPHALT DIVIDING STRIP (6") | 83 | SY |
$60.00 |
$80.00 |
$79.50 |
$58.00 |
$55.00 |
| 22 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 166 | LF |
$55.00 |
$57.00 |
$54.00 |
$60.00 |
$65.00 |
| 23 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,000 | LF |
$15.00 |
$12.00 |
$20.00 |
$14.00 |
$45.00 |
| 24 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 250 | LF |
$11.00 |
$19.00 |
$18.50 |
$13.00 |
$35.00 |
| 25 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$500.00 |
$650.00 |
$2,100.00 |
$800.00 |
$1,100.00 |
| 26 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$350.00 |
$1,100.00 |
$1,200.00 |
$450.00 |
$600.00 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$25,000.00 |
$12,000.00 |
$10,000.00 |
$5,000.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,670 | SY |
$3.00 |
$3.71 |
$3.30 |
$3.40 |
$4.70 |
| 29 | 619(C) 0924 |
SAWING PAVEMENT | 2,827 | LF |
$2.00 |
$1.34 |
$2.00 |
$3.00 |
$2.30 |
| 30 | 804(A) 2915 |
STRUCTURAL CONCRETE | 4.24 | CY |
$469.25 |
$156.00 |
$400.00 |
$410.00 |
$420.00 |
| 31 | 804(B) 2916 |
REINFORCING STEEL | 600 | LB |
$1.02 |
$0.5700 |
$1.00 |
$1.05 |
$1.05 |
| 32 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 45.51 | SF |
$16.86 |
$13.00 |
$12.00 |
$12.25 |
$12.60 |
| 33 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 254.5 | SF |
$22.63 |
$18.66 |
$23.00 |
$23.25 |
$24.15 |
| 34 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 45 | LF |
$27.57 |
$37.00 |
$21.00 |
$21.25 |
$22.05 |
| 35 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 44.3 | LF |
$33.73 |
$47.00 |
$23.00 |
$23.25 |
$24.15 |
| 36 | 851(A) 3208 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 47.3 | LF |
$35.18 |
$47.00 |
$25.00 |
$26.00 |
$26.25 |
| 37 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 101 | LF |
$7.82 |
$16.00 |
$5.00 |
$5.00 |
$5.25 |
| 38 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,199 | LF |
$0.6000 |
$1.00 |
$0.8100 |
$0.7200 |
$0.7400 |
| 39 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 115 | LF |
$0.6700 |
$1.75 |
$1.00 |
$4.10 |
$1.05 |
| 40 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,498 | LF |
$1.25 |
$2.10 |
$1.25 |
$1.30 |
$1.31 |
| 41 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 675 | LF |
$2.60 |
$3.15 |
$1.75 |
$1.80 |
$1.84 |
| 42 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 50 | LF |
$150.00 |
$6.50 |
$10.00 |
$10.25 |
$10.50 |
| 43 | 855(B) 3300 |
TRAFFIC STRIPE (PLASTIC)(SYMBOLS, WORDS, ETC.) | 5 | EA |
$78.94 |
$110.00 |
$150.00 |
$155.00 |
$157.50 |
| 44 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 3 | EA |
$100.00 |
$110.00 |
$85.00 |
$88.00 |
$89.25 |
| 45 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 7,645 | LF |
$0.2500 |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 46 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 379 | EA |
$0.9500 |
$1.05 |
$1.00 |
$1.05 |
$1.05 |
| 47 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,775 | LF |
$0.2500 |
$0.2800 |
$0.2500 |
$0.2500 |
$0.2600 |
| 48 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$7.00 |
$16.00 |
$5.00 |
$5.00 |
$5.25 |
| 49 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 985 | SD |
$0.4000 |
$0.9000 |
$0.5000 |
$0.5200 |
$0.5300 |
| 50 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 648 | SD |
$0.7500 |
$2.15 |
$1.00 |
$1.05 |
$1.05 |
| 51 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 676 | SD |
$1.00 |
$2.15 |
$1.00 |
$1.05 |
$1.05 |
| 52 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 253 | SD |
$0.5000 |
$2.15 |
$0.5000 |
$0.5200 |
$0.5300 |
| 53 | 880(C) 8848 |
WING BARRICADES | 274 | SD |
$0.9500 |
$3.15 |
$1.00 |
$1.05 |
$1.05 |
| 54 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,182 | SD |
$0.1200 |
$0.0100 |
$0.2500 |
$0.2600 |
$0.2600 |
| 55 | 880(F) 8878 |
DRUMS | 3,612 | SD |
$0.1500 |
$0.5700 |
$0.1500 |
$0.1500 |
$0.1600 |
| 56 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 42 | SD |
$12.00 |
$37.00 |
$10.00 |
$16.00 |
$10.50 |
| 57 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,231.00 |
$22,000.00 |
$13,000.00 |
$9,000.00 |
$29,500.00 |
| 58 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$1,800.00 |
$5,500.00 |
$4,000.00 |
$2,625.00 |
| 59 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$500.00 |
$3,000.00 |
$4,000.00 |
$23,000.00 |
| 60 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$76,665.00 |
$45,000.00 |
$77,000.00 |
$58,200.00 |
$75,000.00 |