Bid tab 120142

Let Mar 15, 2012 · Division 8 · Rogers Sign up free

‹ Mar 2012 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-45): OVER DOG CREEK 1.9 MILES EAST OF SH -66. PROJECT LENGTH = 0.235 MILES

Let date
Thursday, March 15, 2012
Contract
120142
J/P numbers
25744(04)
District
Division 8
County
Rogers
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-45): OVER DOG CREEK 1.9 MILES EAST OF SH -66. PROJECT LENGTH = 0.235 MILES
Project number
BRF-166C(219)CI

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,401,042
1 BELK BRIDGE, INC. Low bidder $1,261,117 -10.0%
3 BECCO CONTRACTORS, INC. $1,570,596 +12.1% +24.5%
4 K & R BUILDERS, INC. $1,675,529 +19.6% +32.9%

Bid tab: unit prices 58 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BELK BRIDGE, IN…#3 BECCO CONTRACTO…#4 K & R BUILDERS,…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $16,000.00 $25,000.00 $18,750.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,243CY $5.00 $5.50 $8.00 $7.12
3202(D) 0184 UNCLASSIFIED BORROW13,109CY $8.00 $5.25 $9.00 $10.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $12,000.00 $20,000.00 $9,750.00
5221(C) 2801 TEMPORARY SILT FENCE2,458LF $2.50 $1.10 $2.00 $1.90
6221(F) 0100 TEMPORARY SILT DIKE224LF $7.00 $9.00 $9.00 $9.00
7230(A) 2806 SOLID SLAB SODDING14,017SY $1.50 $1.55 $1.50 $1.55
8233(A) 2817 VEGETATIVE MULCHING2.9AC $350.00 $850.00 $200.00 $300.00
9303(B) 2110 AGGREGATE BASE TYPE B1,046CY $38.00 $39.02 $40.00 $47.40
10402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E262TON $20.00 $18.00 $20.00 $25.50
11407(B) 0250 TACK COAT240GAL $3.00 $2.70 $3.00 $3.50
12408 5774 PRIME COAT1,342GAL $4.00 $5.00 $3.00 $5.50
13411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,526TON $70.00 $62.50 $64.00 $74.00
14411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)529TON $82.00 $83.00 $80.00 $90.00
15509(D) 0325 CLASS C CONCRETE24CY $200.00 $275.00 $300.00 $322.50
16613(B) 0689 18" CORR. GALV. STEEL PIPE239LF $25.00 $35.00 $35.00 $23.50
17613(M) 7186 TYPE A4 CULVERT END TREATMENT6EA $750.00 $1,000.00 $900.00 $1,135.50
18613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C65CY $15.00 $35.00 $40.00 $57.00
19613(V) 1180 TRENCH EXCAVATION91CY $15.00 $10.00 $20.00 $8.00
20619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,500.00 $3,000.00 $5,000.00 $8,250.00
21619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,348SY $4.00 $5.00 $5.00 $11.00
22619(C) 0924 SAWING PAVEMENT42LF $4.00 $5.00 $5.00 $11.28
23202(A) 1301 UNCLASSIFIED EXCAVATION2,464CY $10.00 $5.50 $8.00 $7.25
24303(A) 2100 AGGREGATE BASE TYPE A557CY $35.00 $45.00 $40.00 $50.00
25326(B) 0100 GEOGRID REINFORCEMENT954SY $20.00 $3.50 $4.00 $10.00
26501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED312CY $12.00 $60.00 $25.00 $11.00
27509(B) 1328 CLASS A CONCRETE481CY $400.00 $300.00 $300.00 $441.25
28511(A) 1332 REINFORCING STEEL94,430LB $0.8500 $1.00 $0.9000 $0.9500
29601(B) 1353 TYPE I-A PLAIN RIPRAP1,430TON $25.00 $23.50 $35.00 $34.85
30601(C) 1355 TYPE I-A FILTER BLANKET295TON $20.00 $23.25 $25.00 $28.71
31601(I) 6312 FILTER FABRIC (RIPRAP)1,195SY $2.50 $1.00 $2.00 $3.50
32202(A) 1301 UNCLASSIFIED EXCAVATION8,016CY $5.00 $5.50 $8.00 $7.50
33501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON120CY $15.00 $12.00 $25.00 $8.00
34501(G) 6309 CLSM BACKFILL86CY $80.00 $90.00 $90.00 $154.00
35503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)439LF $200.00 $205.00 $210.00 $215.00
36504(A) 1304 APPROACH SLAB142SY $160.00 $100.00 $165.00 $200.00
37504(D) 6239 CONCRETE RAIL (TR3)285LF $60.00 $75.00 $60.00 $74.00
38506(A) 1322 STRUCTURAL STEEL250LB $2.50 $4.00 $2.00 $3.80
39507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $500.00 $750.00 $500.00 $1,000.00
40509(A) 0319 CLASS AA CONCRETE223CY $420.00 $400.00 $600.00 $537.50
41509(B) 1328 CLASS A CONCRETE54CY $450.00 $400.00 $600.00 $555.00
42511(A) 1332 REINFORCING STEEL32,823LB $0.8500 $1.00 $0.9000 $0.9500
43514(A) 6010 PILES, FURNISHED (HP 10X42)684LF $20.00 $20.00 $30.00 $31.85
44514(B) 6292 PILES, DRIVEN (HP 10X42)684LF $12.00 $10.00 $15.00 $13.65
45601(B) 1353 TYPE I-A PLAIN RIPRAP4,560TON $25.00 $23.50 $35.00 $32.31
46601(C) 1355 TYPE I-A FILTER BLANKET820TON $20.00 $23.25 $25.00 $27.72
47601(I) 6312 FILTER FABRIC (RIPRAP)4,015SY $2.50 $1.00 $2.00 $3.00
48613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND66LF $25.00 $40.00 $40.00 $31.50
49613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $20.00 $30.00 $25.00 $33.50
50619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $5,000.00 $6,000.00 $5,000.00 $7,750.00
51623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE300LF $20.00 $18.00 $25.00 $26.00
52623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,200.00 $2,250.00 $2,600.00 $2,475.00
53855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)5,000LF $0.7500 $0.6500 $0.7000 $0.7500
54880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $4,000.00 $3,400.00 $2,500.00 $3,125.00
55642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $12,000.00 $5,100.00 $20,000.00 $6,125.00
56220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $5,000.00 $6,575.00
57640(A) 1398 FIELD OFFICE1EA $10,000.00 $2,000.00 $5,000.00 $11,500.00
58641 1399 MOBILIZATION1LSUM $87,800.00 $35,000.00 $100,000.00 $86,500.00