| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$16,000.00 |
$25,000.00 |
$18,750.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,243 | CY |
$5.00 |
$5.50 |
$8.00 |
$7.12 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 13,109 | CY |
$8.00 |
$5.25 |
$9.00 |
$10.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$12,000.00 |
$20,000.00 |
$9,750.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,458 | LF |
$2.50 |
$1.10 |
$2.00 |
$1.90 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$7.00 |
$9.00 |
$9.00 |
$9.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 14,017 | SY |
$1.50 |
$1.55 |
$1.50 |
$1.55 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.9 | AC |
$350.00 |
$850.00 |
$200.00 |
$300.00 |
| 9 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,046 | CY |
$38.00 |
$39.02 |
$40.00 |
$47.40 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 262 | TON |
$20.00 |
$18.00 |
$20.00 |
$25.50 |
| 11 | 407(B) 0250 |
TACK COAT | 240 | GAL |
$3.00 |
$2.70 |
$3.00 |
$3.50 |
| 12 | 408 5774 |
PRIME COAT | 1,342 | GAL |
$4.00 |
$5.00 |
$3.00 |
$5.50 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,526 | TON |
$70.00 |
$62.50 |
$64.00 |
$74.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 529 | TON |
$82.00 |
$83.00 |
$80.00 |
$90.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 24 | CY |
$200.00 |
$275.00 |
$300.00 |
$322.50 |
| 16 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 239 | LF |
$25.00 |
$35.00 |
$35.00 |
$23.50 |
| 17 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$750.00 |
$1,000.00 |
$900.00 |
$1,135.50 |
| 18 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 65 | CY |
$15.00 |
$35.00 |
$40.00 |
$57.00 |
| 19 | 613(V) 1180 |
TRENCH EXCAVATION | 91 | CY |
$15.00 |
$10.00 |
$20.00 |
$8.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$3,000.00 |
$5,000.00 |
$8,250.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,348 | SY |
$4.00 |
$5.00 |
$5.00 |
$11.00 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 42 | LF |
$4.00 |
$5.00 |
$5.00 |
$11.28 |
| 23 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,464 | CY |
$10.00 |
$5.50 |
$8.00 |
$7.25 |
| 24 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 557 | CY |
$35.00 |
$45.00 |
$40.00 |
$50.00 |
| 25 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 954 | SY |
$20.00 |
$3.50 |
$4.00 |
$10.00 |
| 26 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 312 | CY |
$12.00 |
$60.00 |
$25.00 |
$11.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 481 | CY |
$400.00 |
$300.00 |
$300.00 |
$441.25 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 94,430 | LB |
$0.8500 |
$1.00 |
$0.9000 |
$0.9500 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,430 | TON |
$25.00 |
$23.50 |
$35.00 |
$34.85 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 295 | TON |
$20.00 |
$23.25 |
$25.00 |
$28.71 |
| 31 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,195 | SY |
$2.50 |
$1.00 |
$2.00 |
$3.50 |
| 32 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 8,016 | CY |
$5.00 |
$5.50 |
$8.00 |
$7.50 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$15.00 |
$12.00 |
$25.00 |
$8.00 |
| 34 | 501(G) 6309 |
CLSM BACKFILL | 86 | CY |
$80.00 |
$90.00 |
$90.00 |
$154.00 |
| 35 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 439 | LF |
$200.00 |
$205.00 |
$210.00 |
$215.00 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 142 | SY |
$160.00 |
$100.00 |
$165.00 |
$200.00 |
| 37 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 285 | LF |
$60.00 |
$75.00 |
$60.00 |
$74.00 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 250 | LB |
$2.50 |
$4.00 |
$2.00 |
$3.80 |
| 39 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$500.00 |
$750.00 |
$500.00 |
$1,000.00 |
| 40 | 509(A) 0319 |
CLASS AA CONCRETE | 223 | CY |
$420.00 |
$400.00 |
$600.00 |
$537.50 |
| 41 | 509(B) 1328 |
CLASS A CONCRETE | 54 | CY |
$450.00 |
$400.00 |
$600.00 |
$555.00 |
| 42 | 511(A) 1332 |
REINFORCING STEEL | 32,823 | LB |
$0.8500 |
$1.00 |
$0.9000 |
$0.9500 |
| 43 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 684 | LF |
$20.00 |
$20.00 |
$30.00 |
$31.85 |
| 44 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 684 | LF |
$12.00 |
$10.00 |
$15.00 |
$13.65 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 4,560 | TON |
$25.00 |
$23.50 |
$35.00 |
$32.31 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 820 | TON |
$20.00 |
$23.25 |
$25.00 |
$27.72 |
| 47 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 4,015 | SY |
$2.50 |
$1.00 |
$2.00 |
$3.00 |
| 48 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$25.00 |
$40.00 |
$40.00 |
$31.50 |
| 49 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$30.00 |
$25.00 |
$33.50 |
| 50 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$5,000.00 |
$7,750.00 |
| 51 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$20.00 |
$18.00 |
$25.00 |
$26.00 |
| 52 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,250.00 |
$2,600.00 |
$2,475.00 |
| 53 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,000 | LF |
$0.7500 |
$0.6500 |
$0.7000 |
$0.7500 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,400.00 |
$2,500.00 |
$3,125.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$5,100.00 |
$20,000.00 |
$6,125.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$5,000.00 |
$6,575.00 |
| 57 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$2,000.00 |
$5,000.00 |
$11,500.00 |
| 58 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$87,800.00 |
$35,000.00 |
$100,000.00 |
$86,500.00 |