| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$9,500.00 |
$6,000.00 |
$5,000.00 |
$4,500.00 |
$5,000.00 |
$9,000.00 |
$8,400.00 |
$4,750.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$19,000.00 |
$12,250.00 |
$13,000.00 |
$16,500.00 |
$20,000.00 |
$12,000.00 |
$7,481.25 |
$24,750.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$9,500.00 |
$3,500.00 |
$4,000.00 |
$4,000.00 |
$2,500.00 |
$5,000.00 |
$5,353.95 |
$4,750.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.00 |
$1.40 |
$1.20 |
$1.60 |
$3.00 |
$1.10 |
$1.16 |
$1.90 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 280 | LF |
$18.00 |
$5.00 |
$5.40 |
$6.00 |
$6.00 |
$4.90 |
$5.15 |
$7.80 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 6,563 | SY |
$2.00 |
$1.60 |
$1.10 |
$1.50 |
$2.00 |
$1.15 |
$1.05 |
$1.75 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.36 | AC |
$600.00 |
$200.00 |
$415.00 |
$475.00 |
$300.00 |
$375.00 |
$393.75 |
$500.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 650 | TON |
$45.00 |
$20.30 |
$19.00 |
$20.00 |
$25.00 |
$21.00 |
$21.02 |
$22.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$225.00 |
$300.00 |
$250.00 |
$300.00 |
$300.00 |
$296.71 |
$250.00 |
| 10 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 40 | LF |
$70.00 |
$68.00 |
$82.00 |
$120.00 |
$50.00 |
$77.00 |
$26.25 |
$55.00 |
| 11 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 80 | LF |
$30.00 |
$19.00 |
$20.00 |
$23.30 |
$25.00 |
$40.00 |
$27.56 |
$22.00 |
| 12 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$400.00 |
$210.00 |
$100.00 |
$350.00 |
$250.00 |
$190.00 |
$193.37 |
$25.00 |
| 13 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$750.00 |
$900.00 |
$500.00 |
$750.00 |
$750.00 |
$1,030.00 |
$210.00 |
$750.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 88 | CY |
$10.00 |
$7.25 |
$8.00 |
$10.00 |
$10.00 |
$10.00 |
$22.00 |
$14.40 |
| 15 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 90 | CY |
$10.00 |
$9.50 |
$8.00 |
$12.00 |
$10.00 |
$18.00 |
$22.00 |
$18.00 |
| 16 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 296.17 | LF |
$169.97 |
$163.50 |
$171.00 |
$160.00 |
$175.00 |
$177.00 |
$184.57 |
$186.00 |
| 17 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 214 | LF |
$60.00 |
$58.00 |
$50.00 |
$49.00 |
$65.00 |
$57.00 |
$55.91 |
$65.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 1,800 | LB |
$2.50 |
$2.65 |
$4.00 |
$2.80 |
$2.50 |
$3.15 |
$4.28 |
$4.31 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 58.5 | CY |
$400.00 |
$435.00 |
$500.00 |
$415.00 |
$450.00 |
$606.00 |
$600.00 |
$468.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 58.4 | CY |
$400.00 |
$470.00 |
$500.00 |
$415.00 |
$450.00 |
$570.00 |
$600.00 |
$468.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 21,310 | LB |
$1.00 |
$0.7900 |
$0.9000 |
$1.00 |
$0.8500 |
$0.8500 |
$1.17 |
$0.9500 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 160 | LF |
$25.00 |
$25.20 |
$25.00 |
$27.00 |
$25.00 |
$32.25 |
$30.09 |
$37.50 |
| 23 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 566 | LF |
$35.00 |
$31.50 |
$29.00 |
$37.25 |
$35.00 |
$39.50 |
$36.09 |
$42.50 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 160 | LF |
$10.00 |
$10.80 |
$11.00 |
$15.00 |
$15.00 |
$14.40 |
$16.50 |
$5.00 |
| 25 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 566 | LF |
$10.00 |
$13.50 |
$13.00 |
$12.00 |
$15.00 |
$13.55 |
$16.50 |
$7.00 |
| 26 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 890 | TON |
$45.00 |
$31.50 |
$29.00 |
$30.00 |
$35.00 |
$34.00 |
$37.65 |
$41.40 |
| 27 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 200 | TON |
$45.00 |
$22.57 |
$25.00 |
$28.00 |
$30.00 |
$28.00 |
$31.17 |
$30.00 |
| 28 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$3,150.00 |
$2,500.00 |
$5,000.00 |
$5,000.00 |
$5,500.00 |
$11,000.00 |
$3,750.00 |
| 29 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$3,000.00 |
$1,850.00 |
$2,245.00 |
$2,100.00 |
$2,100.00 |
$1,800.00 |
$2,227.50 |
$1,800.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$1,650.00 |
$2,630.00 |
$3,500.00 |
$2,000.00 |
$1,650.00 |
$4,345.00 |
$6,500.00 |
| 31 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$7,566.44 |
$12,650.00 |
$11,000.00 |
$12,100.00 |
$5,000.00 |
$13,000.00 |
$10,890.00 |
$7,750.00 |
| 32 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,500.00 |
$3,500.00 |
$1,500.00 |
$4,000.00 |
$3,000.00 |
$11,000.00 |
$3,500.00 |
$4,500.00 |
| 33 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$43,423.57 |
$25,000.00 |
$25,000.00 |
$28,000.00 |
$15,000.00 |
$15,000.00 |
$31,165.30 |
$25,000.00 |
| 34 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$3,000.00 |
$4,000.00 |
$5,000.00 |
$9,000.00 |
$5,250.00 |
$6,750.00 |
| 35 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$25,000.00 |
$45,000.00 |
$55,000.00 |
$56,000.00 |
$45,000.00 |
$57,000.00 |
$46,332.30 |
$67,500.00 |
| 36 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,230 | LF |
$2.10 |
$1.40 |
$1.50 |
$1.60 |
$3.00 |
$1.10 |
$1.15 |
$1.95 |
| 37 | 221(F) 0100 |
TEMPORARY SILT DIKE | 240 | LF |
$10.00 |
$5.00 |
$6.50 |
$6.00 |
$6.00 |
$5.00 |
$5.15 |
$7.25 |
| 38 | 230(A) 2806 |
SOLID SLAB SODDING | 19,637 | SY |
$1.30 |
$1.15 |
$1.50 |
$1.50 |
$2.00 |
$1.10 |
$1.05 |
$1.75 |
| 39 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.86 | AC |
$300.00 |
$200.00 |
$440.00 |
$475.00 |
$300.00 |
$375.00 |
$315.00 |
$500.00 |
| 40 | 303(C) 2130 |
AGGREGATE BASE TYPE C | 752.96 | CY |
$40.00 |
$48.00 |
$21.00 |
$43.15 |
$45.00 |
$34.00 |
$25.78 |
$35.00 |
| 41 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 109.64 | TON |
$25.00 |
$23.05 |
$21.00 |
$23.00 |
$28.00 |
$19.00 |
$21.02 |
$22.00 |
| 42 | 407(B) 0250 |
TACK COAT | 187.81 | GAL |
$3.00 |
$3.25 |
$3.50 |
$4.20 |
$6.00 |
$3.00 |
$2.63 |
$2.75 |
| 43 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 564.33 | TON |
$70.00 |
$80.00 |
$82.00 |
$80.00 |
$110.00 |
$90.00 |
$83.48 |
$88.00 |
| 44 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 369.59 | TON |
$70.00 |
$100.00 |
$103.00 |
$103.70 |
$125.00 |
$103.00 |
$97.65 |
$102.00 |
| 45 | 509(B) 0321 |
CLASS A CONCRETE | 14.2 | CY |
$400.00 |
$525.00 |
$500.00 |
$500.00 |
$800.00 |
$467.00 |
$622.48 |
$468.00 |
| 46 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$225.00 |
$300.00 |
$250.00 |
$300.00 |
$300.00 |
$296.71 |
$250.00 |
| 47 | 511(A) 0332 |
REINFORCING STEEL | 1,902 | LB |
$1.00 |
$0.9000 |
$0.9000 |
$2.00 |
$1.00 |
$0.9000 |
$1.05 |
$2.00 |
| 48 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 114 | LF |
$25.00 |
$22.25 |
$20.00 |
$28.00 |
$30.00 |
$45.00 |
$32.01 |
$23.00 |
| 49 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$300.00 |
$200.00 |
$110.00 |
$375.00 |
$250.00 |
$225.00 |
$220.98 |
$250.00 |
| 50 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$935.00 |
$700.00 |
$700.00 |
$1,800.00 |
$1,200.00 |
$2,500.00 |
$1,050.00 |
$750.00 |
| 51 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,440 | LF |
$0.8000 |
$1.15 |
$0.8200 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
$1.10 |
| 52 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 140 | CY |
$8.00 |
$5.75 |
$8.00 |
$10.00 |
$10.00 |
$9.00 |
$22.00 |
$14.40 |
| 53 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$50.00 |
$48.00 |
$40.00 |
$30.00 |
$10.00 |
$52.00 |
$39.07 |
$50.00 |
| 54 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$165.00 |
$200.00 |
$190.00 |
$200.65 |
$214.00 |
$231.00 |
$228.49 |
$200.00 |
| 55 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 233.3 | LF |
$65.00 |
$57.00 |
$60.00 |
$65.00 |
$65.00 |
$60.00 |
$51.55 |
$65.00 |
| 56 | 506(A) 1322 |
STRUCTURAL STEEL | 1,460 | LB |
$3.00 |
$2.10 |
$4.00 |
$2.40 |
$2.25 |
$3.00 |
$4.28 |
$4.00 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 65.9 | CY |
$600.00 |
$440.00 |
$485.00 |
$415.00 |
$450.00 |
$610.00 |
$600.00 |
$468.00 |
| 58 | 509(B) 1328 |
CLASS A CONCRETE | 75.2 | CY |
$600.00 |
$450.00 |
$480.00 |
$415.00 |
$450.00 |
$530.00 |
$600.00 |
$468.00 |
| 59 | 511(A) 1332 |
REINFORCING STEEL | 28,220 | LB |
$0.7500 |
$0.8000 |
$0.9000 |
$1.00 |
$0.8500 |
$0.9000 |
$1.06 |
$0.9000 |
| 60 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 108 | LF |
$20.00 |
$27.00 |
$25.00 |
$27.00 |
$30.00 |
$40.00 |
$30.63 |
$37.50 |
| 61 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 230 | LF |
$27.00 |
$35.00 |
$29.00 |
$37.25 |
$40.00 |
$50.00 |
$37.56 |
$42.50 |
| 62 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 108 | LF |
$10.00 |
$12.00 |
$11.00 |
$15.00 |
$15.00 |
$15.00 |
$17.86 |
$5.00 |
| 63 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 230 | LF |
$9.00 |
$15.00 |
$13.00 |
$15.00 |
$15.00 |
$17.00 |
$28.32 |
$7.00 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 714.04 | TON |
$30.00 |
$29.50 |
$29.00 |
$29.00 |
$35.00 |
$31.00 |
$27.20 |
$39.00 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 145.53 | TON |
$25.00 |
$22.85 |
$25.00 |
$28.00 |
$30.00 |
$25.00 |
$21.82 |
$34.00 |
| 66 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$4,000.00 |
$3,000.00 |
$5,000.00 |
$5,000.00 |
$5,700.00 |
$8,800.00 |
$3,750.00 |
| 67 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,000.00 |
$1,850.00 |
$2,245.00 |
$2,100.00 |
$2,100.00 |
$1,800.00 |
$2,227.50 |
$1,800.00 |
| 68 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$1,650.00 |
$2,630.00 |
$3,500.00 |
$2,000.00 |
$1,600.00 |
$4,345.00 |
$6,250.00 |