| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$95,000.00 |
$125,000.00 |
$85,000.00 |
$25,000.00 |
$26,299.61 |
$25,750.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 153,933 | CY |
$3.00 |
$3.41 |
$5.75 |
$4.00 |
$4.50 |
$4.73 |
$4.64 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 5,861 | CY |
$6.00 |
$5.05 |
$8.00 |
$6.00 |
$8.00 |
$8.42 |
$8.24 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$153,800.00 |
$75,000.00 |
$190,000.00 |
$60,000.00 |
$63,119.06 |
$82,400.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 10,150 | LF |
$3.00 |
$1.37 |
$3.00 |
$3.00 |
$2.00 |
$1.83 |
$1.79 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 3,626 | LF |
$9.00 |
$6.10 |
$9.00 |
$10.00 |
$10.25 |
$9.80 |
$9.60 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 348,470 | SY |
$2.00 |
$1.35 |
$1.20 |
$1.25 |
$1.22 |
$1.28 |
$1.26 |
| 8 | 230(F) 2812 |
WATERING | 13,939 | MGAL |
$12.00 |
$5.00 |
$7.00 |
$5.00 |
$4.77 |
$5.02 |
$4.91 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 20 | AC |
$1,000.00 |
$203.00 |
$700.00 |
$535.00 |
$525.40 |
$552.71 |
$541.16 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 20 | AC |
$664.90 |
$203.00 |
$350.00 |
$535.00 |
$525.40 |
$552.71 |
$541.16 |
| 11 | 241 2832 |
MOWING | 72 | AC |
$75.00 |
$50.75 |
$50.00 |
$75.00 |
$64.23 |
$67.57 |
$66.16 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 95,425 | SY |
$1.50 |
$1.52 |
$2.20 |
$1.50 |
$1.45 |
$2.10 |
$2.06 |
| 13 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,151 | TON |
$30.00 |
$30.50 |
$32.00 |
$40.00 |
$30.05 |
$31.61 |
$30.95 |
| 14 | 407 0250 |
TACK COAT | 27,257 | GAL |
$2.10 |
$2.75 |
$2.00 |
$2.15 |
$3.00 |
$2.79 |
$3.49 |
| 15 | 408 5774 |
PRIME COAT | 20,523 | GAL |
$3.50 |
$5.00 |
$5.35 |
$3.15 |
$3.00 |
$4.49 |
$4.98 |
| 16 | 411(S3) 5940 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 15,086 | TON |
$58.00 |
$58.00 |
$59.00 |
$65.00 |
$65.00 |
$71.00 |
$86.27 |
| 17 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 49,096 | TON |
$52.00 |
$51.00 |
$54.00 |
$59.00 |
$62.50 |
$62.00 |
$78.02 |
| 18 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 10,812 | TON |
$67.00 |
$71.00 |
$69.00 |
$75.00 |
$77.00 |
$85.00 |
$91.81 |
| 19 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 7,585 | TON |
$62.00 |
$63.00 |
$60.00 |
$75.00 |
$72.00 |
$64.00 |
$80.43 |
| 20 | 413(A) 4861 |
RUMBLE STRIP-METHOD AC-CON | 69,303 | LF |
$0.5000 |
$0.2000 |
$0.0800 |
$0.2000 |
$0.0500 |
$0.1000 |
$0.2600 |
| 21 | 417 5267 |
COLD MILLING PAVEMENT | 84,542 | SY |
$1.50 |
$1.27 |
$0.9000 |
$1.00 |
$0.6000 |
$0.9900 |
$1.03 |
| 22 | 420(A) 4242 |
FABRIC REINFORCEMENT | 89,894 | SY |
$2.30 |
$1.10 |
$1.00 |
$1.25 |
$2.75 |
$1.31 |
$0.9000 |
| 23 | 420(B) 4268 |
BITUMINOUS BINDER | 3,078 | GAL |
$2.80 |
$4.30 |
$2.00 |
$2.15 |
$2.65 |
$5.39 |
$2.97 |
| 24 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 506 | CY |
$25.00 |
$10.55 |
$20.00 |
$10.00 |
$25.00 |
$26.30 |
$25.75 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 306 | CY |
$380.00 |
$421.75 |
$450.00 |
$320.00 |
$420.00 |
$441.83 |
$432.60 |
| 26 | 509(B) 0321 |
CLASS A CONCRETE | 597 | CY |
$376.80 |
$436.55 |
$425.00 |
$320.00 |
$400.00 |
$420.79 |
$412.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 1,725 | CY |
$250.00 |
$210.55 |
$225.00 |
$205.00 |
$205.00 |
$215.66 |
$211.15 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 129,713 | LB |
$0.8000 |
$0.7000 |
$0.8500 |
$0.8000 |
$0.8500 |
$0.8900 |
$0.8800 |
| 29 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$674.90 |
$825.00 |
$500.00 |
$1,100.00 |
$800.00 |
$841.59 |
$824.00 |
| 30 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,353 | TON |
$50.00 |
$43.65 |
$51.00 |
$50.00 |
$49.00 |
$51.55 |
$50.47 |
| 31 | 611(E) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,041.50 |
$2,030.00 |
$2,000.00 |
$2,500.00 |
$2,000.00 |
$2,103.97 |
$2,060.00 |
| 32 | 613(B) 0491 |
18" R.C.PIPE CLASS III | 72 | LF |
$45.00 |
$28.00 |
$55.00 |
$27.50 |
$50.00 |
$52.60 |
$51.50 |
| 33 | 613(B) 0492 |
24" R.C.PIPE CLASS III | 208 | LF |
$80.60 |
$27.60 |
$80.00 |
$37.00 |
$75.00 |
$78.90 |
$77.25 |
| 34 | 613(B) 0493 |
30" R.C.PIPE CLASS III | 152 | LF |
$72.80 |
$56.00 |
$90.00 |
$55.00 |
$90.00 |
$94.68 |
$92.70 |
| 35 | 613(CC) 7196 |
TYPE A6 CULVERT END TREATMENT | 30 | EA |
$1,130.20 |
$1,170.00 |
$1,100.00 |
$700.00 |
$1,000.00 |
$1,051.98 |
$1,030.00 |
| 36 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 8 | EA |
$1,200.00 |
$1,320.00 |
$1,250.00 |
$800.00 |
$1,200.00 |
$1,262.38 |
$1,236.00 |
| 37 | 613(CC) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$2,030.00 |
$3,000.00 |
$1,200.00 |
$2,750.00 |
$2,892.96 |
$2,832.50 |
| 38 | 613(CC) 7200 |
TYPE E6 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$2,540.00 |
$3,000.00 |
$2,000.00 |
$3,200.00 |
$3,366.35 |
$3,296.00 |
| 39 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 1,161 | LF |
$30.00 |
$24.40 |
$30.00 |
$24.00 |
$25.00 |
$26.30 |
$25.75 |
| 40 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 280 | LF |
$35.80 |
$28.90 |
$40.00 |
$28.45 |
$35.00 |
$36.82 |
$36.05 |
| 41 | 613(D) 0693 |
42" CORR. GALV. STEEL PIPE | 204 | LF |
$45.00 |
$49.25 |
$50.00 |
$48.50 |
$50.00 |
$52.60 |
$51.50 |
| 42 | 613(D) 0694 |
48" CORR. GALV. STEEL PIPE | 83 | LF |
$72.90 |
$69.00 |
$80.00 |
$68.00 |
$75.00 |
$78.90 |
$77.25 |
| 43 | 613(M) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$693.40 |
$483.65 |
$300.00 |
$476.50 |
$500.00 |
$525.99 |
$515.00 |
| 44 | 613(M) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$610.40 |
$700.00 |
$350.00 |
$689.50 |
$600.00 |
$631.19 |
$618.00 |
| 45 | 613(M) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$923.10 |
$867.40 |
$400.00 |
$854.50 |
$700.00 |
$736.39 |
$721.00 |
| 46 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 3,000 | LF |
$10.00 |
$10.15 |
$12.00 |
$10.00 |
$10.00 |
$10.52 |
$10.30 |
| 47 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 200 | LF |
$12.00 |
$8.10 |
$12.00 |
$8.00 |
$10.00 |
$10.52 |
$10.30 |
| 48 | 613(R) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 900 | CY |
$39.00 |
$50.60 |
$42.00 |
$49.83 |
$40.00 |
$42.08 |
$41.20 |
| 49 | 613(S) 1180 |
TRENCH EXCAVATION | 207 | CY |
$10.90 |
$8.10 |
$11.00 |
$8.00 |
$10.00 |
$10.52 |
$10.30 |
| 50 | 613(T) 1181 |
STANDARD BEDDING MATERIAL | 191 | CY |
$42.70 |
$25.40 |
$50.00 |
$25.00 |
$40.00 |
$42.08 |
$41.20 |
| 51 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$60,000.00 |
$80,000.00 |
$40,000.00 |
$125,000.00 |
$35,000.00 |
$36,819.45 |
$36,050.00 |
| 52 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 100 | SY |
$6.00 |
$15.80 |
$10.00 |
$5.00 |
$5.00 |
$5.26 |
$5.15 |
| 53 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 42,635 | SY |
$3.00 |
$1.52 |
$4.00 |
$3.00 |
$3.25 |
$3.43 |
$3.86 |
| 54 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 552 | LF |
$2.20 |
$3.05 |
$2.00 |
$2.25 |
$3.00 |
$5.52 |
$2.32 |
| 55 | 619(C) 0924 |
SAWING PAVEMENT | 57,532 | LF |
$5.00 |
$2.90 |
$3.00 |
$3.00 |
$3.00 |
$3.16 |
$1.84 |
| 56 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 1,125 | LF |
$16.10 |
$14.50 |
$14.25 |
$15.00 |
$14.25 |
$15.78 |
$15.45 |
| 57 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,300.00 |
$1,200.00 |
$2,300.00 |
$1,250.00 |
$2,025.00 |
$1,314.98 |
$1,287.50 |
| 58 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$3,000.00 |
$2,055.00 |
$595.00 |
$1,800.00 |
$1,185.00 |
$1,893.57 |
$1,854.00 |
| 59 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 27 | EA |
$550.00 |
$660.00 |
$650.00 |
$250.00 |
$650.00 |
$683.79 |
$669.50 |
| 60 | 624(C) 4458 |
(SP)FENCE-STYLE SWF (4 BARBED WIRE) | 41,517 | LF |
$4.50 |
$3.25 |
$4.12 |
$3.50 |
$3.25 |
$3.42 |
$3.35 |
| 61 | 653(C) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$582.40 |
$406.00 |
$600.00 |
$500.00 |
$400.00 |
$420.79 |
$412.00 |
| 62 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$14.20 |
$30.00 |
$14.00 |
$35.00 |
$36.82 |
$17.51 |
| 63 | 501(G) 6309 |
CLSM BACKFILL | 180 | CY |
$125.00 |
$116.75 |
$170.00 |
$115.00 |
$150.00 |
$157.80 |
$191.58 |
| 64 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 399 | LF |
$190.00 |
$229.72 |
$210.00 |
$226.33 |
$205.00 |
$215.66 |
$287.37 |
| 65 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$160.00 |
$141.35 |
$155.00 |
$139.27 |
$150.00 |
$157.80 |
$170.98 |
| 66 | 504(E) 6245 |
CONCRETE RAIL (TR4) | 297 | LF |
$60.00 |
$60.90 |
$100.00 |
$60.00 |
$90.00 |
$94.68 |
$97.85 |
| 67 | 506(A) 1322 |
STRUCTURAL STEEL | 150 | LB |
$2.50 |
$3.15 |
$4.00 |
$3.12 |
$5.00 |
$5.26 |
$2.06 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 158.6 | CY |
$430.00 |
$487.20 |
$600.00 |
$480.00 |
$570.00 |
$599.63 |
$559.29 |
| 69 | 509(B) 1328 |
CLASS A CONCRETE | 59.6 | CY |
$430.00 |
$487.20 |
$550.00 |
$480.00 |
$525.00 |
$552.29 |
$710.70 |
| 70 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 37,340 | LB |
$0.9000 |
$1.00 |
$1.20 |
$0.9600 |
$1.10 |
$1.16 |
$0.7700 |
| 71 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 420 | LF |
$35.00 |
$28.90 |
$20.00 |
$28.49 |
$22.00 |
$23.14 |
$29.87 |
| 72 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 420 | LF |
$20.00 |
$15.20 |
$24.00 |
$15.00 |
$25.00 |
$26.30 |
$17.51 |
| 73 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 461 | SY |
$4.00 |
$5.10 |
$5.00 |
$5.00 |
$4.50 |
$4.73 |
$4.12 |
| 74 | 535 6164 |
(PL)FIXED BEARING ASSEMBLY | 8 | EA |
$200.00 |
$791.70 |
$355.00 |
$780.00 |
$350.00 |
$368.20 |
$465.56 |
| 75 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 1,156 | TON |
$35.00 |
$48.00 |
$50.00 |
$47.31 |
$52.00 |
$54.70 |
$70.04 |
| 76 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 234 | TON |
$25.00 |
$42.55 |
$42.00 |
$41.91 |
$40.00 |
$42.08 |
$60.77 |
| 77 | 613(P) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$25.40 |
$14.00 |
$25.00 |
$15.00 |
$15.78 |
$5.15 |
| 78 | 613(Q) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$25.00 |
$25.40 |
$14.00 |
$25.00 |
$15.00 |
$15.78 |
$5.15 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$28,420.00 |
$50,000.00 |
$18,000.00 |
$30,000.00 |
$31,559.53 |
$30,900.00 |
| 80 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,380 | CY |
$6.50 |
$5.30 |
$6.00 |
$5.00 |
$5.20 |
$5.47 |
$5.36 |
| 81 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 131.3 | CY |
$20.00 |
$13.70 |
$10.00 |
$10.00 |
$25.00 |
$26.30 |
$25.75 |
| 82 | 509(A) 1326 |
CLASS AA CONCRETE | 310.4 | CY |
$430.00 |
$381.80 |
$400.00 |
$320.00 |
$315.00 |
$331.38 |
$324.45 |
| 83 | 511(A) 1332 |
REINFORCING STEEL | 47,450 | LB |
$0.8000 |
$0.7500 |
$1.00 |
$0.8000 |
$0.8500 |
$0.8900 |
$0.8800 |
| 84 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$34,300.00 |
$3,500.00 |
$2,000.00 |
$4,000.00 |
$4,207.94 |
$4,120.00 |
| 85 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,100 | CY |
$6.50 |
$6.10 |
$6.00 |
$5.00 |
$6.00 |
$6.31 |
$6.18 |
| 86 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 91.6 | CY |
$20.00 |
$15.10 |
$8.03 |
$10.00 |
$25.00 |
$26.30 |
$25.75 |
| 87 | 509(A) 1326 |
CLASS AA CONCRETE | 228.4 | CY |
$430.00 |
$401.90 |
$425.00 |
$320.00 |
$400.00 |
$420.79 |
$412.00 |
| 88 | 511(A) 1332 |
REINFORCING STEEL | 33,420 | LB |
$0.8000 |
$0.7600 |
$1.00 |
$0.8000 |
$0.8000 |
$0.8400 |
$0.8200 |
| 89 | 619(B) 2510 |
(PL)REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$10,000.00 |
$31,800.00 |
$7,000.00 |
$3,000.00 |
$6,500.00 |
$6,837.90 |
$6,695.00 |
| 90 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$12,200.00 |
$20,000.00 |
$20,000.00 |
$10,000.00 |
$10,519.84 |
$10,300.00 |
| 91 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$19,300.00 |
$30,000.00 |
$30,000.00 |
$20,000.00 |
$21,039.69 |
$20,600.00 |
| 92 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$12,200.00 |
$25,000.00 |
$20,000.00 |
$15,000.00 |
$15,779.76 |
$15,450.00 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$12,200.00 |
$25,000.00 |
$20,000.00 |
$15,000.00 |
$15,779.76 |
$15,450.00 |
| 94 | 627(G) 4316 |
RELOCATION OF PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 4,000 | LF |
$4.60 |
$6.90 |
$5.00 |
$8.00 |
$5.00 |
$4.21 |
$7.00 |
| 95 | 627(H) 5856 |
DELIVER PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,000 | LF |
$15.90 |
$29.85 |
$28.00 |
$25.00 |
$22.50 |
$27.35 |
$30.28 |
| 96 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 50 | SF |
$14.00 |
$15.25 |
$18.00 |
$15.00 |
$15.00 |
$15.78 |
$15.74 |
| 97 | 851(C) 8324 |
2" SQUARE TUBE POST | 165 | LF |
$10.00 |
$10.15 |
$9.00 |
$10.00 |
$10.00 |
$10.52 |
$10.50 |
| 98 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 58 | EA |
$27.00 |
$17.75 |
$18.00 |
$17.50 |
$17.50 |
$18.41 |
$18.37 |
| 99 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 120 | EA |
$35.00 |
$17.75 |
$20.00 |
$17.50 |
$17.50 |
$18.41 |
$18.37 |
| 100 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 112,552 | LF |
$0.5000 |
$0.3900 |
$0.3000 |
$0.3800 |
$0.3800 |
$0.4000 |
$0.4000 |
| 101 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,740 | LF |
$0.3000 |
$0.2500 |
$0.5000 |
$0.2400 |
$0.2400 |
$0.2500 |
$0.2500 |
| 102 | 856(G) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 153,600 | EA |
$0.4000 |
$0.4100 |
$0.6200 |
$0.4000 |
$0.4000 |
$0.4200 |
$0.4200 |
| 103 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,240 | LF |
$0.5000 |
$0.4100 |
$0.5000 |
$0.4000 |
$0.4000 |
$0.4200 |
$0.4200 |
| 104 | 871 8709 |
(PL)CONSTRUCTION ZONE QUADGUARD IMPACT ATTENUATOR | 260 | SD |
$29.00 |
$35.55 |
$45.00 |
$35.00 |
$35.00 |
$36.82 |
$36.73 |
| 105 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 13,670 | SD |
$0.4000 |
$0.6000 |
$2.00 |
$0.5500 |
$0.5500 |
$0.5800 |
$0.5800 |
| 106 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,940 | SD |
$1.50 |
$2.00 |
$0.0200 |
$2.00 |
$2.00 |
$2.10 |
$2.10 |
| 107 | 880(C) 8842 |
BARRICADES(TYPE III) | 11,480 | SD |
$0.3000 |
$0.5000 |
$0.0200 |
$0.4500 |
$0.4500 |
$0.4700 |
$0.4700 |
| 108 | 880(C) 8848 |
WING BARRICADES | 1,240 | SD |
$0.7000 |
$1.05 |
$2.00 |
$1.00 |
$1.00 |
$1.05 |
$1.05 |
| 109 | 880(D) 8854 |
VERTICAL PANELS | 157,200 | SD |
$0.1000 |
$0.0600 |
$0.0200 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 110 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 41,020 | SD |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1500 |
$0.1500 |
$0.1600 |
$0.1600 |
| 111 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 218,060 | SD |
$0.1000 |
$0.0700 |
$0.0200 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.0600 |
| 112 | 880(F) 8878 |
DRUMS | 60,860 | SD |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1500 |
$0.1500 |
$0.1600 |
$0.1600 |
| 113 | 642 0098 |
STAKING | 1 | LSUM |
$60,000.00 |
$75,000.00 |
$43,800.00 |
$125,000.00 |
$67,600.00 |
$75,000.00 |
$97,129.00 |
| 114 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,259.30 |
$35,000.00 |
$20,000.00 |
$30,000.00 |
$5,000.00 |
$5,000.00 |
$5,150.00 |
| 115 | 640 1426 |
FIELD OFFICE | 1 | EA |
$9,182.90 |
$10,000.00 |
$15,000.00 |
$10,000.00 |
$12,000.00 |
$4,500.00 |
$38,544.92 |
| 116 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$332,169.00 |
$300,000.00 |
$320,000.00 |
$326,000.00 |
$264,000.00 |
$250,000.00 |
$446,372.00 |