Filtered by: District: District 9 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2026 | 78B47 | WilliamsonDistrict 9 | Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. | — | Executed | Samron Midwest Contracting, Inc. $304,465 · | ||
| Apr 24, 2026 | 78B48 | MassacPulaskiDistrict 9 | Bridge deck overlay on SN 077-0037 carrying IL 37 over Hodges Bayou; on SN 077-0036 carrying IL 169 over tributary; on SN 064-0039 carrying IL 169 over Patterson Branch. | — | Executed | Samron Midwest Contracting, Inc. $912,998 · | ||
| Apr 24, 2026 | 78B50 | PulaskiDistrict 9 | Substructure repairs on SN 077-0002 carrying I-57 southbound over Old US 51 in Pulaski. | — | Executed | E. T. Simonds Construction Company $1,137,235 · | ||
| Apr 24, 2026 | 78B79 | VariousDistrict 9 | Removal of existing stop sign panel assemblies and furnishing / installing new solar powered, illuminated LED stop signs at 5 intersections at various locations in District 9. | — | Executed | Samron Midwest Contracting, Inc. $47,810 · | ||
| Apr 24, 2026 | 78B86 | MassacDistrict 9 | Repairs on SN 064-0036 carrying US 45 over Massac Creek, 1.5 miles west of I-24. | — | Executed | E. T. Simonds Construction Company $287,587 · | ||
| Apr 24, 2026 | 78B87 | SalineDistrict 9 | Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0053 carrying IL 13 over Bankston Fork. | — | Executed | E. T. Simonds Construction Company $501,499 · | ||
| Apr 24, 2026 | 78C09 | JohnsonDistrict 9 | Resurfacing on Old US 45 beginning at US 45 and proceeding 0.47 miles to the northeast. | — | Executed | Samron Midwest Contracting, Inc. $186,558 · | ||
| Apr 24, 2026 | 99761 | WilliamsonDistrict 9 | Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. | — | Executed | Samron Midwest Contracting, Inc. $979,828 · | ||
| Apr 24, 2026 | 99764 | PulaskiDistrict 9 | HMA overlay and shoulders on Shawnee College Road from Old US 51 to IL 37. | — | Executed | E. T. Simonds Construction Company $3,887,941 · | ||
| Apr 24, 2026 | 99767 | FranklinDistrict 9 | Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Thompsonville. | — | Executed | E. T. Simonds Construction Company $1,090,460 · | ||
| Apr 24, 2026 | 99768 | PerryDistrict 9 | Hot-In-PLace recycling, HMA surface, and aggregate shoulders on East Park Street Road from the DuQuoin City limits to the Franklin County line. | — | Executed | E. T. Simonds Construction Company $1,139,387 · | ||
| Jun 12, 2026 | 78791 | AlexanderDistrict 9 | Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127. | — | Executed | Samron Midwest Contracting, Inc. $3,285,578 · | ||
| Jun 12, 2026 | 78977 | FranklinDistrict 9 | Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks. | — | Executed | Samron Midwest Contracting, Inc. $967,393 · | ||
| Jun 12, 2026 | 78A13 | UnionDistrict 9 | Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a stream, 3.0 miles northwest of Jonesboro; 2) SN 091-2012 carrying IL 146 over a stream, 0.6 miles west of Jonesboro 3) SN 091-7022 carrying Old US 51 over an unnamed ditch south of Dongola 4) SN 091-7027 carrying US 51 over an unnamed ditch. 3.0 miles south of Anna. | — | Executed | E. T. Simonds Construction Company $2,686,720 · | ||
| Jun 12, 2026 | 78A85 | AlexanderDistrict 9 | Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades on US 51 from 0.29 miles south of New Cross Street to 3.38 miles south of New Cross Street. Includes small portions of Patierdale Road, Kessler Road and Turner Lane. | — | Executed | E. T. Simonds Construction Company $5,912,328 · | ||
| Jun 12, 2026 | 78B49 | JeffersonDistrict 9 | 0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp. | — | Executed | Samron Midwest Contracting, Inc. $4,558,321 · | ||
| Jun 12, 2026 | 78B59 | FranklinDistrict 9 | 1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road. | — | Executed | Samron Midwest Contracting, Inc. $1,230,184 · | ||
| Jun 12, 2026 | 78B94 | SalineDistrict 9 | Mast arm upgrades at the intersection of US 45 and IL 13. | — | Executed | Brown Electric, Inc. $612,761 · | ||
| Jun 12, 2026 | 78C10 | WhiteDistrict 9 | Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals. | — | Executed | E. T. Simonds Construction Company $583,277 · | ||
| Jun 12, 2026 | 78C13 | WilliamsonDistrict 9 | Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $328,825 · | ||
| Jun 12, 2026 | 78C15 | WhiteDistrict 9 | Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050) | — | Executed | Eagle Painting & Maintenance Company, Inc. $409,970 · | ||
| Jun 12, 2026 | 78C20 | VariousDistrict 9 | Various electrical repairs and/or replacements at various locations throughout District 9. | — | Executed | F. W. Electric, Inc. $318,316 · | ||
| Jun 12, 2026 | 78C24 | PerryDistrict 9 | 5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the Washington County line. | — | Executed | Samron Midwest Contracting, Inc. $1,989,087 · | ||
| Jun 12, 2026 | 78C25 | PerryDistrict 9 | 2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154. | — | Executed | Samron Midwest Contracting, Inc. $1,618,916 · | ||
| Jun 12, 2026 | 99748 | WilliamsonDistrict 9 | Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. | — | Rejected | |||
| Jun 12, 2026 | 99769 | MassacDistrict 9 | Resurfacing Grand Chain Road from Pulaski County Line to Boaz Road. | — | Rejected | Samron Midwest Contracting, Inc. $1,054,105 · | ||
| Jun 12, 2026 | 99770 | PopeDistrict 9 | Resurfacing Bay City Road from 0.4 mile south of Azotus Road to 1.1 miles north of Upper Bottom Road. | — | Executed | Samron Midwest Contracting, Inc. $1,079,783 · | ||
| Jun 12, 2026 | 99771 | JeffersonDistrict 9 | HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jefferson County. | — | Executed | E. T. Simonds Construction Company $1,680,906 · | ||
| Jun 12, 2026 | 99772 | HamiltonDistrict 9 | HMA resurfacing with aggregate shoulders and pavement marking on Blairsville Rd. from IL 242 to the White County Line in Hamilton County. | — | Executed | E. T. Simonds Construction Company $3,108,776 · | ||
| Jul 31, 2026 | 78520 | JeffersonDistrict 9 | 4.4 miles of milling, resurfacing, crown and superelevation corrections, safety shoulders, earthwork and drainage improvements on IL 37 from south of SN 041-0032, carrying IL 37 over the Casey Fork, to Campground Road north of Bonnie. | — | Executed | E. T. Simonds Construction Company $9,952,613 · | ||
| Jul 31, 2026 | 78935 | JeffersonDistrict 9 | Removal and replacement of SN 041-0043 carrying IL 142 over an unnamed creek 1.8 miles south of Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $1,269,718 · | ||
| Jul 31, 2026 | 78B60 | UnionDistrict 9 | 5.2 miles of patching, milling and resurfacing on IL 146 from IL 3 in Ware to IL 127 west of Jonesboro. | — | Executed | E. T. Simonds Construction Company $4,132,778 · | ||
| Jul 31, 2026 | 78B80 | FranklinDistrict 9 | 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line. | — | Executed | Mosley Construction 1, LLC $717,325 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Jul 31, 2026 | 78C21 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barriers and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,458,402 · | ||
| Jul 31, 2026 | 99774 | PerryDistrict 9 | Pipe culvert replacement and patching the roadway on Kathleen Rd. 1.1 miles south of IL 152. | — | Rejected | |||
| Jul 31, 2026 | 99775 | WilliamsonDistrict 9 | Resurfacing Bandyville Rd. from Stotlar Rd. to Crenshaw Rd. and Crenshaw Rd. from 0.3 mile west of Bandyville Rd. to Bandyville Rd. in the city of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $693,605 · | ||
| Sep 18, 2026 | 78989 | AlexanderDistrict 9 | Replacement of SN 002-0027 carrying IL 127 over Hartline Creek northeast of Elco. | — | Executed | |||
| Sep 18, 2026 | 78990 | FranklinDistrict 9 | Replace box culvert (SN 028-7068) on IL 149 over the Green River. | — | Executed | Samron Midwest Contracting, Inc. $539,518 · | ||
| Sep 18, 2026 | 78A98 | SalineDistrict 9 | Removal and replacement of 2 box culverts: 1) SN 083-7053 carrying IL 142 over a creek, 1 mile southeast of US 45 in Eldorado; 2) SN 083-7054 carrying IL 142 over a creek, 2.1 miles southeast of US 45 in Eldorado. | — | Executed | |||
| Sep 18, 2026 | 78B55 | JacksonDistrict 9 | This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Locat | — | Executed | Samron Midwest Contracting, Inc. $2,308,150 · | ||
| Sep 18, 2026 | 78B76 | WhiteDistrict 9 | ADA improvements, traffic signal modernization and cabinet replacement, APS push button installation, ground mount services installation and video detection installation on IL 1 / IL 14 in Carmi, at the Main Cross Street, Walnut Street and Church Street intersections. | — | Active | |||
| Sep 18, 2026 | 78C29 | GallatinSalineDistrict 9 | Location 1 - 2.08 miles of HMA surface removal, HMA resurfacing, HMA shoulders, patching and ADA ramps on IL 13 from Poplar Street to US 45 in Harrisburg. Location 2 - 0.74 miles of HMA surface removal, HMA resurfacing, aggregate shoulders and patching on IL 13 from the Gallatin County line to IL 142. | — | Executed | E. T. Simonds Construction Company $2,354,550 · | ||
| Sep 18, 2026 | 78C30 | JacksonDistrict 9 | Traffic signal modernization at the intersection of IL 13 and Giant City Road. | — | Executed | Gerstner Electric, Inc. $212,000 · | ||
| Sep 18, 2026 | 78C34 | FranklinDistrict 9 | Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange (at mile marker 68). | — | Executed | Homer Tree Service, Inc. $1,824,386 · | ||
| Sep 18, 2026 | 78C49 | JohnsonDistrict 9 | 3.7 miles of patching on IL 146 from IL 37 in West Vienna to 11th Street in Vienna. | — | Executed | |||
| Sep 18, 2026 | 99776 | SalineDistrict 9 | PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. | — | Rejected | |||
| Sep 18, 2026 | 99778 | FranklinDistrict 9 | Crack sealing, HMA binder, A-2 bituminous surface treatment, curb and gutter, and aggregate shoulders on various roadways in the Gun Creek Recreational Area. | — | Executed | E. T. Simonds Construction Company $301,965 · | ||
| — | 9-00169-0000 9001690000 | District 9 | IL-15 | Reconstruction - Bridges Bridge Replacement Ryse Creek 3.6 Mi E of Washington Co Line | $3,000,000 | Planned | ||
| — | 9-00210-0000 9002100000 | District 9 | IL-34 | Reconstruction - Bridges Culvert Replacement 0.9 Mi SE of Thompsonville ECL | $800,000 | Planned | ||
| — | 9-00215-0000 9002150000 | District 9 | IL-151 | Reconstruction - Bridges Culvert Replacement Spring Creek 2 Mi S of Ava SCL | $1,000,000 | Planned | ||
| — | 9-00216-0000 9002160000 | District 9 | IL-15 | Reconstruction - Bridges Bridge Replacement Bear Creek 5.4 Mi E of Mt Vernon | $1,200,000 | Planned | ||
| — | 9-00233-0000 9002330000 | District 9 | IL-1 | Reconstruction - Bridges Bridge Replacement French Creek 2 Mi S of Grayville | $1,800,000 | Planned | ||
| — | 9-00234-0000 9002340000 | District 9 | IL-1 | Reconstruction - Bridges Bridge Replacement Grindstone Creek 3 Mi S of Carmi | $1,000,000 | Planned | ||
| — | 9-00265-0000 9002650000 | District 9 | I-64 | Reconstruction - Bridges Bridge Replacement ILL 37 Intchg S of Mt Vernon | $12,000,000 | Planned | ||
| — | 9-00268-0000 9002680000 | District 9 | IL-147 | Reconstruction - Bridges Bridge Replacement Over IC RR 0.7 Mi E of Johnson Co Line | $3,600,000 | Planned | ||
| — | 9-00271-0000 9002710000 | District 9 | I-57 | Reconstruction - Bridges Bridge Replacement Herrin Rd (Overhead) at WCL of Johnston City | $12,000,000 | Planned | ||
| — | 9-00338-0000 9003380000 | District 9 | Old Us 51 | Reconstruction - Bridges Culvert Replacement Clay Lick Branch 0.1 Mi N of Union Co Line | $750,000 | Planned | ||
| — | 9-00341-0000 9003410000 | District 9 | IL-34 | Reconstruction - Bridges Bridge Replacement Stream 0.2 Mi N of Pope Co Line | $1,000,000 | Planned | ||
| — | 9-00342-0000 9003420000 | District 9 | I-64 | Reconstruction - Bridges Bridge Replacement TR 282 (Overhead) 6.2 Mi W of ILL 1 | $6,000,000 | Planned | ||
| — | 9-00409-2800 9004092800 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay Mississippi River Bridge at WCL of Cairo | $12,000,000 | Planned | ||
| — | 9-00433-0000 9004330000 | District 9 | IL-3 | Reconstruction - Bridges Culvert Replacement 0.4 Mi S of ILL 149 | $800,000 | Planned | ||
| — | 9-00470-0000 9004700000 | District 9 | IL-13 | Reconstruction - Bridges Bridge Replacement Middle Fork Saline River 1.6 Mi E of Harrisburg | $7,500,000 | Planned | ||
| — | 9-00579-0000 9005790000 | District 9 | IL-150 | Rehabilitation - Pavement Standard Overlay 0.2 Mi N of Reeses Hill Rd N of Cutler to ILL 154 | $1,400,000 | Planned | ||
| — | 9-00600-1026 9006001026 | District 9 | US-51US-60US-62 | Reconstruction - Bridges Bridge Replacement Ohio River Bridge 1 Mi S of Cairo | $41,400,000 | Planned | ||
| — | 9-00600-1227 9006001227 | District 9 | US-51US-60US-62 | Reconstruction - Bridges Bridge Replacement Ohio River Bridge 1 Mi S of Cairo | $22,000,000 | Planned | ||
| — | 9-00620-2900 9006202900 | District 9 | IL-146 | Preservation - Bridges Bridge Cleaning Mississippi River at Cape Girardeau | $88,000 | Planned | ||
| — | 9-00637-0000 9006370000 | District 9 | IL-37 | Reconstruction - Bridges Bridge Replacement Cache River 0.6 Mi N of Goines Ln NW of Karnak | $2,500,000 | Planned | ||
| — | 9-00645-0100 9006450100 | District 9 | IL-146 | Reconstruction - Bridges Bridge Replacement Clear Creek 2 Mi E of ILL 3 | $6,000,000 | Planned | ||
| — | 9-00648-0000 9006480000 | District 9 | IL-37 | Rehabilitation - Pavement Designed Overlay, New Shoulders, Bikeway Franklin Co Line to ILL 14 in Benton | $20,500,000 | Planned | ||
| — | 9-00648-0104 9006480104 | District 9 | IL-37 | Rehabilitation - Pavement Utility Adjustment Franklin Co Line to ILL 14 in Benton | $4,000,000 | Planned | ||
| — | 9-00648-1000 9006481000 | District 9 | IL-37 | Rehabilitation - Pavement Designed Overlay, New Shoulders Campground Rd in Bonnie to Franklin Co Line | $12,000,000 | Planned | ||
| — | 9-00648-1004 9006481004 | District 9 | IL-37 | Rehabilitation - Pavement Utility Adjustment Campground Rd in Bonnie to Franklin Co Line | $2,000,000 | Planned | ||
| — | 9-00663-0000 9006630000 | District 9 | IL-152 | Rehabilitation - Pavement Standard Overlay, New Shoulders ILL 127 to US 51 | $12,000,000 | Planned | ||
| — | 9-00678-0000 9006780000 | District 9 | IL-146 | Reconstruction - Bridges Bridge Replacement Hosick Creek 0.8 Mi E of Elizabethtown NCL | $2,000,000 | Planned | ||
| — | 9-00714-2611 9007142611 | District 9 | IL-3 | Preservation - Bridges Bridge Deck Overlay Over UP RR 0.1 Mi N of Gorham Rd | $500,000 | Planned | ||
| — | 9-00714-2612 9007142612 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay I-57/64 Intchg S of Mt Vernon | $300,000 | Planned | ||
| — | 9-00714-2613 9007142613 | District 9 | IL-146 | Preservation - Bridges Bridge Deck Overlay At Dutchman Creek 2.3 Mi W of Vienna | $300,000 | Planned | ||
| — | 9-00714-2614 9007142614 | District 9 | IL-34 | Preservation - Bridges Bridge Deck Overlay At Gibbons Creek 1.6 Mi W of Hardin Co Line | $300,000 | Planned | ||
| — | 9-00714-2615 9007142615 | District 9 | IL-37 | Preservation - Bridges Bridge Deck Overlay at Casey Fork 2 Mi S of ILL 148 | $500,000 | Planned | ||
| — | 9-00714-2617 9007142617 | District 9 | Old Us 51 | Preservation - Bridges Bridge Deck Overlay 0.3 Mi S of Egyptian Trail Rd in Ullin | $300,000 | Planned | ||
| — | 9-00714-2625 9007142625 | District 9 | IL-146IL-3 | Preservation - Bridges Bridge Deck Overlay At Running Lake Ditch 2 Mi S of Ware | $300,000 | Planned | ||
| — | 9-00714-2629 9007142629 | District 9 | IL-15 | Preservation - Bridges Bridge Deck Overlay Over CN RR 1.5 Mi W of Wayne Co | $300,000 | Planned | ||
| — | 9-00714-2630 9007142630 | District 9 | IL-141 | Preservation - Bridges Bridge Deck Overlay Little Wabash River at New Haven NCL | $733,000 | Planned | ||
| — | 9-00714-2631 9007142631 | District 9 | IL-1IL-14 | Preservation - Bridges Bridge Deck Overlay At Little Wabash River SW of First St in Carmi | $700,000 | Planned | ||
| — | 9-00714-2632 9007142632 | District 9 | IL-3 | Preservation - Bridges Bridge Deck Overlay Over UP RR 0.3 Mi N of Gorham Rd | $500,000 | Planned | ||
| — | 9-00714-2811 9007142811 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay Lake Creek 0.3 Mi S of Johnston City Intchg | $800,000 | Planned | ||
| — | 9-00714-2812 9007142812 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay Over COE RR 0.5 Mi S of ILL 13 in Marion | $800,000 | Planned | ||
| — | 9-00714-2813 9007142813 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay Over ILL 13 in Marion | $1,200,000 | Planned | ||
| — | 9-00714-2814 9007142814 | District 9 | I-57 | Preservation - Bridges Bridge Deck Overlay Over Old ILL 13 in Marion | $1,000,000 | Planned | ||
| — | 9-00731-0000 9007310000 | District 9 | IL-149 | Miscellaneous Improvement Culvert Repair 2.8 Mi E of ILL 3 | $750,000 | Planned | ||
| — | 9-00731-0100 9007310100 | District 9 | IL-149 | Miscellaneous Improvement Culvert Repair 2.7 Mi E of ILL 3 | $750,000 | Planned | ||
| — | 9-00769-0000 9007690000 | District 9 | IL-146 | Reconstruction - Bridges Bridge Replacement Lusk Creek 0.1 Mi N of Golconda NCL | $8,000,000 | Planned | ||
| — | 9-00777-0000 9007770000 | District 9 | I-57 | Reconstruction - Bridges Bridge Replacement Cedar Grove Rd (Overhead) 1.6 Mi N of ILL 13 N of Marion | $6,000,000 | Planned | ||
| — | 9-00805-0000 9008050000 | District 9 | IL-127 | Reconstruction - Bridges Bridge Replacement Opossum Creek 0.3 Mi N of Pinckneyville NCL | $1,200,000 | Planned | ||
| — | 9-00834-0000 9008340000 | District 9 | IL-37 | Safety Intersection Reconstn Int Old US 51 at Mounds National Cemetery | $3,500,000 | Planned | ||
| — | 9-00835-0100 9008350100 | District 9 | IL-146 | Reconstruction - Pavement Reconstruction ILL 127 in Jonesboro to Old US 51 in Anna | $10,000,000 | Planned | ||
| — | 9-00842-0100 9008420100 | District 9 | IL-13IL-154 | Reconstruction - Pavement Reconstruction Grant St to S Walnut St in Pinckneyville | $2,000,000 | Planned | ||
| — | 9-00852-0000 9008520000 | District 9 | IL-142 | Rehabilitation - Pavement Standard Overlay US 45 in Eldorado to 4.2 Mi SE | $1,600,000 | Planned | ||
| — | 9-00853-0000 9008530000 | District 9 | IL-154 | Reconstruction - Bridges Bridge Replacement Beaucoup Creek E of Pinckneyville | $8,000,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.