| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2020 | 76N74 | RandolphDistrict 8 | 1.9 miles of crack and joint sealing on IL 4 from 0.1 miles north of VFW Drive to IL 154. | — | Executed | HSC Pavement Maintenance $42,066 · | ||
| Jul 31, 2020 | 76N75 | WashingtonDistrict 8 | Crack and joint sealing on IL 127 from 0.1 miles south of Holzhauer Drive to 0.7 miles south of I-64. | — | Executed | Complete Asphalt Service Co. $52,962 · | ||
| Jul 31, 2020 | 76N76 | MadisonDistrict 8 | 1.4 miles of crack and joint sealing on IL 159 from Clay Street to Kinloch Avenue. | — | Executed | Kinney Contractors, Inc. $123,923 · | ||
| Jul 31, 2020 | 97733 | St. ClairDistrict 8 | Resurfacing, curb and gutter, sidewalks and ADA ramps on Centreville Avenue from Dintelman Avenue to 0.02 mile south of West Lincoln Street in Belleville. | — | Executed | Fournie Contracting Co. Inc. $922,944 · | ||
| Jul 31, 2020 | 97740 | St. ClairDistrict 8 | Reconstruction of West Morris Street from 2nd Street to North Main Street in Caseyville. | — | Executed | Baxmeyer Construction, Inc. $678,772 · | ||
| Jul 31, 2020 | 97743 | MarionDistrict 8 | Resurfacing South Locust Street from East 3rd Street to East 17th Street in Centralia. | — | Executed | Howell Paving, Inc. $601,856 · | ||
| Jul 31, 2020 | 97745 | MadisonDistrict 8 | Resurfacing Johnson Road from Nameoki Road to Terrace Lane in Granite City. | — | Executed | Stutz Excavating, Inc. $579,214 · | ||
| Sep 18, 2020 | 76H84 | MadisonDistrict 8 | 2.5 miles of standard overlay resurfacing along I-70/270 from I-55 to 2.5 miles east of the I-55/70/270 interchange and the ramps at the I-55/70/270 interchange and 4.7 miles of ultra-thin bonded wearing course from 0.4 miles east of IL 159 to 0.3 miles north of I-270. | — | Executed | The Kilian Corporation $23,515,724 · | ||
| Sep 18, 2020 | 76L20 | GreeneJerseyDistrict 8 | 5.7 miles of standard overlay resurfacing on US 67 from 0.1 miles north of Township Road 285 to 0.6 miles south of Tolman Road. | — | Executed | Charles E. Mahoney Co. $4,475,169 · | ||
| Sep 18, 2020 | 76M61 | VariousDistrict 8 | Repair and maintenance of electrical equipment at pump stations in various locations within District 8. | — | Executed | Electrico, Inc. $49,533 · | ||
| Sep 18, 2020 | 76M62 | CalhounDistrict 8 | Repair and maintenance of electrical equipment on the Joe Page Bridge in Hardin (SN 031-0001). | — | Executed | Wissehr Electric, Inc. $55,211 · | ||
| Sep 18, 2020 | 76M78 | MadisonSt. ClairDistrict 8 | Chemical treatment of deep wells at various locations in East St. Louis. | — | Active | Davinroy Mechanical Contractor, Inc. $669,550 · | ||
| Sep 18, 2020 | 76N15 | MadisonDistrict 8 | Bridge joint repairs and HMA overlay with bridge repairs on SN 060-0278 and 060-0279 on IL 255 over the Cahokia Diversion Canal. | — | Executed | Stutz Excavating, Inc. $1,150,493 · | ||
| Nov 6, 2020 | 76B55 | St. ClairDistrict 8 | Concrete overlay, patching, deck replacement and expansion joints on the Poplar Street Collector distributor ramps (SN 082-0144, 0255, 0203, 0256, 0140 and 0005). | — | Executed | Keeley & Sons, Inc. $29,799,373 · | ||
| Nov 6, 2020 | 76K67 | MarionDistrict 8 | Bridge replacement on Kinlou Road over the Tributary to Skillet Fork Creek located 0.1 miles west of the Clay County line. | — | Executed | Sierra Bravo Contractors, LLC $605,373 · | ||
| Nov 6, 2020 | 76N12 | ClintonDistrict 8 | Micro-surfacing on US 50 from 0.3 miles west of Frogtown Road to 0.1 miles west of IL 127. | — | Executed | Asphalt Stone Company and Pavement Maintenance Systems JV $404,123 · | ||
| Nov 6, 2020 | 76N13 | ClintonDistrict 8 | Ultra-thin bonded wearing course on US 50 from 0.3 miles west of St, Rose Road to 0.3 miles west of Frogtown Road. | — | Executed | Christ Bros. Asphalt, Inc. $1,288,167 · | ||
| Nov 6, 2020 | 76N19 | MadisonDistrict 8 | Bridge joint repairs, bridge repairs, new 4.5- concrete bridge deck, HMA mill and fill on approaches with a 2- grade rise on IL 140 / IL 111 over Abandoned Quarry Spur, 0.1 miles east of IL 3 (SN 060-0199). | — | Executed | Keller Construction, Inc. $1,403,155 · | ||
| Nov 6, 2020 | 76N55 | MadisonDistrict 8 | Pump station repairs at the Venice Deep Wells on IL 3. | — | Executed | Hank's Excavating & Landscaping, Inc. $129,250 · | ||
| Nov 6, 2020 | 76N88 | MadisonSt. ClairDistrict 8 | Patching at 3 locations: US 67/IL 111 at Tolle Lane, IL 111 at Gateway Commerce Center, US 40 at IL 143 and South Morrison at Caseyville Road. | — | Executed | Kinney Contractors, Inc. $489,340 · | ||
| Nov 6, 2020 | 76N93 | ClintonDistrict 8 | Patching of Old US 50 (Franklin Street) from 13th Street in Carlyle to Carter Street in Beckemeyer. | — | Executed | Ramirez Diversified Services, LLC $424,857 · | ||
| Nov 6, 2020 | 76N94 | WashingtonDistrict 8 | 11.6 miles of patching on I-64 from 0.5 miles west of Beaver Pond Creek to 1.4 miles east of CH 11. | — | Executed | Kinney Contractors, Inc. $989,201 · | ||
| Nov 6, 2020 | 76N95 | RandolphDistrict 8 | 2.9 miles of patching on IL 4 / IL 150 from IL 4 to the eastern city limits of Steeleville. | — | Executed | G. M. Sipes Construction, Inc. $134,525 · | ||
| Nov 6, 2020 | 76N97 | WashingtonDistrict 8 | 4.5 miles of patching on I-64 from 2.5 miles east of CH 11 to the Jefferson County line. | — | Executed | Keeley & Sons, Inc. $577,522 · | ||
| Nov 6, 2020 | 76P07 | VariousDistrict 8 | Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties in District 8. | — | Executed | The Daltons Inc. $165,500 · | ||
| Nov 6, 2020 | 97738 | St. ClairDistrict 8 | Resurfacing, curb and gutter, and sidewalk replacement on Mousette Lane from Carol Street to Jerome Lane in Cahokia. | — | Executed | Stutz Excavating, Inc. $1,035,418 · | ||
| Jan 15, 2021 | 76K78 | MadisonDistrict 8 | Bridge deck sealing of the McKinley Bridge (Salisbury Street) over the Mississippi River. (SN 060-6002) | — | Executed | M & M Concrete, Inc. $47,964 · | ||
| Jan 15, 2021 | 76M33 | St. ClairDistrict 8 | Cleaning of the Missouri Avenue Pump Station on I-55/I-64. , Cleaning of the Missouri Avenue Pump Station on I-55/64. | — | Active | Layne Christensen Company $1,018,000 · | ||
| Jan 15, 2021 | 76M48 | MadisonDistrict 8 | 5.1 miles of resurfacing on IL 157 from 0.2 miles north of Horseshoe Lake Road to 0.1 miles north of Chain of Rocks Road. | — | Executed | Christ Bros. Asphalt, Inc. $3,487,865 · | ||
| Jan 15, 2021 | 76M85 | MadisonDistrict 8 | 1.76 miles of resurfacing on IL 140 from IL 160 to the Bond County line. | — | Executed | Christ Bros. Asphalt, Inc. $1,729,690 · | ||
| Jan 15, 2021 | 76N40 | MadisonDistrict 8 | Traffic signal interconnect (CMAQ) on IL 157 from Horseshoe Lake Road to West Main Street in Collinsville. | — | Executed | Electrico, Inc. $242,161 · | ||
| Jan 15, 2021 | 76N69 | ClintonDistrict 8 | Microsurfacing on IL 161 from 0.1 miles west of Slant Road to 0.2 miles west of Broadway in Centralia. | — | Executed | Asphalt Stone Company $984,640 · | ||
| Jan 15, 2021 | 76N86 | MadisonDistrict 8 | Resurfacing of Old Alton Edwardsville Road from 0.3 miles east of Wanda Road to Cahokia Creek Road. | — | Executed | The Kilian Corporation $254,049 · | ||
| Jan 15, 2021 | 76N87 | GreeneDistrict 8 | Bituminous surface treatment on CH 24 (State Road) from IL 267 to South Street in Rockbridge. | — | Executed | DMS Contracting, Inc. $39,131 · | ||
| Jan 15, 2021 | 76N91 | MadisonDistrict 8 | Patching on US 67 from 10th Street to 6th Street in Alton. | — | Executed | Charles E. Mahoney Co. $101,704 · | ||
| Jan 15, 2021 | 76N96 | RandolphDistrict 8 | Patching on IL 13 / IL 153 from IL 4 to the Perry County line. | — | Executed | E. T. Simonds Construction Company $229,618 · | ||
| Jan 15, 2021 | 76P13 | JerseyMadisonDistrict 8 | Weed spraying along IL 100 from IL 96 to the Piasa Bird Monument and along IL IL 255 from I-270 to US 67. | — | Executed | The Daltons Inc. $39,763 · | ||
| Jan 15, 2021 | 97746 | ClintonDistrict 8 | Replace the bridge carrying CH 3 over Gibbs Creek, 5.0 miles northwest of Shattuc. | — | Executed | Depew and Owen Builders, Inc. $536,588 · | ||
| Mar 5, 2021 | 76K45 | St. ClairDistrict 8 | Standard overlay resurfacing, patching and guardrail improvements on IL 157 from Petroff Drive in Caseyville to State Street in Caseyville; and IL 157 interchange ramps to St. Clair Avenue / IL 111. | — | Executed | Christ Bros. Asphalt, Inc. $3,287,912 · | ||
| Mar 5, 2021 | 76K69 | MadisonDistrict 8 | Bridge deck sealing on I-270 at the Chain of Rocks Bridge (SN 060-0345) and Mississippi River Bridge (SN 060-0035). | — | Executed | M & M Concrete, Inc. $135,671 · | ||
| Mar 5, 2021 | 76M84 | MadisonDistrict 8 | 6.7 miles of standard overlay resurfacing on IL 159 from the Macoupin County line to 0.3 miles north of IL 140. | — | Executed | The Kilian Corporation $5,660,545 · | ||
| Mar 5, 2021 | 76N71 | MadisonDistrict 8 | 5.7 miles of 1 pass microsurfacing on IL 159 from 0.3 miles north of IL 140 to IL 143. | — | Executed | MISSOURI PETROLEUM PRODUCTS COMPANY LLC $564,227 · | ||
| Mar 5, 2021 | 76N77 | St. ClairDistrict 8 | 4.1 miles of crack and joint sealing on IL 159 from 0.1 miles north of Fountains Parkway to Rosewood Village Drive. | — | Executed | Complete Asphalt Service Co. $164,555 · | ||
| Mar 5, 2021 | 76N92 | ClintonDistrict 8 | 0.67 miles of resurfacing along Ferrin Road / County Highway 3 from US 50 to Louis Street. | — | Executed | The Kilian Corporation $166,969 · | ||
| Mar 5, 2021 | 76P11 | ClintonDistrict 8 | Bridge painting on IL 161 over Wilken Lake, 0.5 miles east of Germantown (SN 014-0009) and over Shoal Creek overflow, 0.6 miles east of Germantown (SN 014-0010). | — | Executed | Eagle Painting & Maintenance Company, Inc. $319,658 · | ||
| Mar 5, 2021 | 76P15 | VariousDistrict 8 | Weed spraying along various interstate routes in various counties of District 8. | — | Executed | The Daltons Inc. $96,918 · | ||
| Mar 5, 2021 | 76P36 | St. ClairDistrict 8 | 2.8 miles of partial depth patching on I-55 / I-70 between the BandO Railroad and IL 111. | — | Executed | Christ Bros. Asphalt, Inc. $487,089 · | ||
| Mar 5, 2021 | 97749 | MarionDistrict 8 | Replace the bridge carrying TR 64 over Turkey Creek, 1.5 miles east of Junction . | — | Executed | Depew and Owen Builders, Inc. $236,788 · | ||
| Mar 5, 2021 | 97751 | St. ClairDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on West Main street to 28th Street in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $898,021 · | ||
| Apr 23, 2021 | 76L89 | St. ClairDistrict 8 | Electrical upgrades at the Bowman Pump Station on Exchange Avenue in East St. Louis. | — | Executed | Wissehr Electric, Inc. $131,323 · | ||
| Apr 23, 2021 | 76N39 | St. ClairDistrict 8 | Bridge joint repair and HMA overlay with bridge repairs on St. Clair Avenue over Harding Ditch (SN 082-0033, 082-0034). | — | Executed | Keller Construction, Inc. $351,352 · | ||
| Apr 23, 2021 | 76N73 | JerseyMadisonDistrict 8 | 8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109. | — | Executed | Complete Asphalt Service Co. $91,891 · | ||
| Apr 23, 2021 | 76N78 | ClintonDistrict 8 | Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road. | — | Executed | Freehill Asphalt, Inc. $151,361 · | ||
| Apr 23, 2021 | 76N80 | MadisonDistrict 8 | Lighting improvements on I-55 at IL 143. | — | Executed | Gerstner Electric, Inc. $429,175 · | ||
| Apr 23, 2021 | 76P09 | MadisonDistrict 8 | Painting of the structure carrying IL 143 over I-55 (SN 060-0148). | — | Executed | ERA-Valdivia Contractors, Inc. $484,500 · | ||
| Apr 23, 2021 | 76P10 | St. ClairDistrict 8 | Bridge painting at 3 locations: 1) I-64 over St. Clair Avenue SN 82-0001, 2) I-55/64 over IC RR SN 082-0141, 3) I-55 WB over St. Clair Avenue SN 082-0015. | — | Executed | Thomas Industrial Coatings, Inc. $1,079,724 · | ||
| Apr 23, 2021 | 76P26 | VariousDistrict 8 | Installation, maintenance, and pickup/removal of Smart Traffic Monitoring Systems or Real-Time Traffic Control Systems on a work order basis for repair and maintenance activities at various locations within District 8. | — | Executed | Right Way Traffic Control, Inc. $177,850 · | ||
| Apr 23, 2021 | 76P27 | MadisonDistrict 8 | Flood repair at the Grey-s Farm Pump Station; Frontage Road A, west of I-255 and north of Horseshoe Lake Road. | — | Executed | Keller Construction, Inc. $77,000 · | ||
| Apr 23, 2021 | 76P35 | MadisonDistrict 8 | 0.49 miles of patching on I-55/70 at the Maryville Weigh Station westbound on and off ramps, and on eastbound I-55/70 near IL 159. | — | Executed | RCS Construction, Inc. $122,416 · | ||
| Apr 23, 2021 | 76P44 | St. ClairDistrict 8 | Bridge joint repair on SN 082-0319, westbound I-70 Illinois approach over the Mississippi River. | — | Executed | Keeley & Sons, Inc. $1,088,539 · | ||
| Apr 23, 2021 | 97487 | MonroeDistrict 8 | Pavement removal, sub and aggregate base, HMA Pavement and shoulders with rumble strips, storm sewer, guardrail and pavement markings on TR 47 (HH Road) from 0.15 mile west of Waterloo City Limits to 0.3 mile west. | — | Executed | Baxmeyer Construction, Inc. $427,178 · | ||
| Apr 23, 2021 | 97719 | MonroeDistrict 8 | Pedestrian path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo. | — | Executed | Baxmeyer Construction, Inc. $247,448 · | ||
| Apr 23, 2021 | 97748 | MonroeDistrict 8 | Resurfacing Hanover Road from D Road to 0.2 mile east of FF Road. | — | Executed | Christ Bros. Asphalt, Inc. $1,018,912 · | ||
| Apr 23, 2021 | 97750 | MadisonDistrict 8 | Resurfacing Serento Road from Main Street to the Madison/Bond County Line. | — | Executed | The Kilian Corporation $539,097 · | ||
| Jun 11, 2021 | 46920 | St. ClairDistrict 8 | Site preparation and oil and chip treatment at Peabody River King State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $443,425 · | ||
| Jun 11, 2021 | 76G57 | MadisonDistrict 8 | 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton. | — | Executed | Charles E. Mahoney Co. $5,947,763 · | ||
| Jun 11, 2021 | 76K85 | JerseyDistrict 8 | 3.2 miles of resurfacing on IL 16 from Grange Hall Road to the Macoupin County line. | — | Executed | Charles E. Mahoney Co. $2,660,060 · | ||
| Jun 11, 2021 | 76L09 | St. ClairDistrict 8 | 3.6 miles of resurfacing on IL 3 from 0.8 miles north of Monsanto Avenue to 0.1 miles south of Ruby Street in Cahokia. | — | Executed | Christ Bros. Asphalt, Inc. $6,649,341 · | ||
| Jun 11, 2021 | 76L14 | St. ClairDistrict 8 | 4.9 miles of design overlay resurfacing and ADA improvements on IL 15 from 0.1 miles west of Bluebird Lane to 1st Street in Fayetteville, and HMA overlay with JT replacement on SN 082-0295 and SN 082-0106. | — | Executed | The Kilian Corporation $3,732,610 · | ||
| Jun 11, 2021 | 76L96 | CalhounGreeneDistrict 8 | Ramp work and parking lot resurfacing along IL 108 at the Kampsville Ferry. | — | Executed | Keeley & Sons, Inc. $2,272,194 · | ||
| Jun 11, 2021 | 76M36 | MadisonDistrict 8 | Discharge box culvert replacement at the Collinsville Pump Station #2 east of I-255, south of I-55/70. | — | Executed | Stutz Excavating, Inc. $54,536 · | ||
| Jun 11, 2021 | 76N14 | MarionDistrict 8 | 6.4 miles of microsurfacing and ADA improvements on US 50 from US 51 to 0.1 miles east of Selmaville Road. | — | Executed | Beniach Construction Co., Inc. $633,631 · | ||
| Jun 11, 2021 | 76N41 | St. ClairDistrict 8 | Storm water pump station rehab at the 25th Street Pump Station, south of I-64. | — | Executed | Haier Plumbing and Heating, Inc. $99,197 · | ||
| Jun 11, 2021 | 76N60 | VariousDistrict 8 | Delivery, setup and pickup of traffic control devices throughout District 8. | — | Rejected | |||
| Jun 11, 2021 | 76N61 | VariousDistrict 8 | Highway lighting and traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Wissehr Electric, Inc. $724,808 · | ||
| Jun 11, 2021 | 76N62 | VariousDistrict 8 | Patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $698,898 · | ||
| Jun 11, 2021 | 76N63 | VariousDistrict 8 | Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | ALLEN CHASE ENTERPRISES INC. $179,401 · | ||
| Jun 11, 2021 | 76N70 | RandolphDistrict 8 | Bituminous surface treatment with fog seal on IL 154 from Burns Avenue to the Perry County line. | — | Executed | DMS Contracting, Inc. $496,286 · | ||
| Jun 11, 2021 | 76N72 | MadisonDistrict 8 | 2.7 miles of SMART overlay along IL 111/IL 267/US 67 from the Jersey County line to 0.1 miles north of Airport Road in Godfrey. | — | Executed | Charles E. Mahoney Co. $1,138,537 · | ||
| Jun 11, 2021 | 76N84 | ClintonDistrict 8 | 0.8 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. | — | Executed | Baxmeyer Construction, Inc. $3,239,778 · | ||
| Jun 11, 2021 | 76N85 | St. ClairDistrict 8 | Parking lot improvements at the District 8 T/M Building in Fairview Heights. | — | Executed | The Kilian Corporation $874,252 · | ||
| Jun 11, 2021 | 76P02 | St. ClairDistrict 8 | Culvert repair on IL 161 over Ash Creek, 2.7 miles west of IL 4 (SN 082-2003). | — | Executed | Stutz Excavating, Inc. $237,695 · | ||
| Jun 11, 2021 | 76P04 | St. ClairDistrict 8 | Bridge deck, joint replacement and approach roadway repairs at 2 locations: 1) SN 082-0192 and 082-0193 carrying I-64 over IL 161, 1.5 miles west of New Baden; 2) SN 082-0194 and 082-0195 carrying I-64 over Norfolk Southern Railroad, 1.4 miles south of the county line. | — | Executed | The Kilian Corporation $743,980 · | ||
| Jun 11, 2021 | 76P06 | MadisonSt. ClairDistrict 8 | Traffic signal repair and replacement at various locations: 1) IL 3 at Monsanto Avenue; 2) IL 3 at IL 157; 3) IL 15 at Racehorse Road; 4) IL 157 at Kazilek; 5) IL 140 at Stanley Road; 6) US 50 at Smiley Street. | — | Executed | Wissehr Electric, Inc. $433,531 · | ||
| Jun 11, 2021 | 76P25 | GreeneDistrict 8 | 3.2 miles of SMART overlay resurfacing and pavement patching on IL 108 from IL 267 to the Macoupin County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $882,674 · | ||
| Jun 11, 2021 | 76P33 | MadisonDistrict 8 | Traffic signal modernization on IL 111/US 67/ IL 143 from Lars Hoffman Crossing to IL 143. | — | Executed | Wissehr Electric, Inc. $745,299 · | ||
| Jun 11, 2021 | 76P45 | St. ClairDistrict 8 | 0.3 miles of patching, mainline and interchange resurfacing, and HMA shoulders on US 50 from EB I-64 ramps to 0.1 miles west of Schantz Road in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $1,099,909 · | ||
| Jun 11, 2021 | 76P47 | MadisonSt. ClairDistrict 8 | Railroad interconnect at 4 locations: 1) US 67 at Ridge, 2) US 67 at Henry, 3) US 40 at Douglas, 4) Lebanon Avenue at West Boulevard. | — | Executed | Wissehr Electric, Inc. $197,580 · | ||
| Jun 11, 2021 | 76P48 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex on I-55/64 westbound CD over Trendly Avenue. (SN 082-0254) | — | Executed | Capital Industrial Services $1,293,300 · | ||
| Jun 11, 2021 | 76P49 | St. ClairDistrict 8 | 2.7 miles of patching on westbound I-55/64 from the Mississippi River to the I-64 Tri-Level. | — | Executed | Keeley & Sons, Inc. $443,202 · | ||
| Jun 11, 2021 | 76P52 | MadisonDistrict 8 | Traffic signal cabinet replacement at multiple locations: 1) IL 3/IL 111 at Seminary Street in Alton, 2) IL 3 at IL 143 in Wood River, 3) IL 111 at IL 140 in Bethalto, 4) IL 111 at Horseshoe Lake Pond in Pontoon Beach, 5) IL 143 / IL 157 at Buchanan Street in Edwardsville. | — | Executed | Electrico, Inc. $124,353 · | ||
| Jun 11, 2021 | 97716 | St. ClairDistrict 8 | HMA pavement, sidewalk construction, curb and gutter and pavement markings along Washington Street from Monroe Street to Jefferson Street in Millstadt. | — | Executed | Hank's Excavating & Landscaping, Inc. $553,708 · | ||
| Jun 11, 2021 | 97717 | MonroeDistrict 8 | Pavement reconstruction, storm sewers, retaining wall, sidewalks, curb and gutter and pavement markings on Moore St. from south of IL 3 to Columbia Ave., including the reconstruction of the intersection of Moore and Columbia in Waterloo. | — | Executed | DMS Contracting, Inc. $2,266,806 · | ||
| Jun 11, 2021 | 97742 | St. ClairDistrict 8 | Construction of a roundabout at the intersecton of Market Place and Commercial Lane in Fairview Heights. | — | Executed | DMS Contracting, Inc. $635,199 · | ||
| Jun 11, 2021 | 97753 | MadisonDistrict 8 | Resurface Seiler Road from Bivens Rd. to IL 159. | — | Executed | The Kilian Corporation $696,392 · | ||
| Jun 11, 2021 | 97754 | MadisonDistrict 8 | Pavement reconstruction on Wood River Ave. from 3rd Street to south of 1st Street in Alton. | — | Executed | Stutz Excavating, Inc. $1,117,585 · | ||
| Jun 11, 2021 | 97755 | MadisonDistrict 8 | Replace the bridge carrying Troy-Fallon Road over Mill Creek, 0.3 mile north of Lebanon Road. | — | Executed | Plocher Construction Company, Inc. $1,159,400 · | ||
| Jun 11, 2021 | 97756 | St. ClairDistrict 8 | Resurface Seibert Road from Main Street to Johnson Road in Shiloh. | — | Executed | The Kilian Corporation $466,115 · | ||
| Jun 11, 2021 | 97757 | RandolphDistrict 8 | Aggregate bse repair, HMA surface removal and resurfacing, and pavement markings on Liberty Street from Church Street to Jackson Street in Evansville. | — | Executed | E. T. Simonds Construction Company $86,674 · | ||
| Jun 11, 2021 | 97759 | St. ClairDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on Collinsville Avenue from Summit Avenue to Martin Luther King Drive in East St. Louis. | — | Executed | Hank's Excavating & Landscaping, Inc. $541,732 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.