Filtered by: District: District 4 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 14, 2019 | 68D99 | PeoriaTazewellDistrict 4 | TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. | — | Executed | T.M.F. Construction Company $824,481 · | ||
| Jun 14, 2019 | 68E26 | HendersonDistrict 4 | BRIDGE JOINT REPAIR AND BRIDGE REPAIR TO SN 036-0039 CARRYING IL RTE 164 OVER HENDERSON CREEK. | — | Executed | Brandt Construction Co. $837,605 · | ||
| Jun 14, 2019 | 68E71 | PeoriaTazewellDistrict 4 | DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. | — | Executed | Otto Baum Company, Inc. $1,476,305 · | ||
| Jun 14, 2019 | 68E73 | TazewellDistrict 4 | Resurfacing ramp from Washington St to IL Rte 40 in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $140,362 · | ||
| Jun 14, 2019 | 68E83 | WoodfordDistrict 4 | REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO. | — | Executed | Bodine Electric of Decatur $281,004 · | ||
| Jun 14, 2019 | 68E84 | MasonDistrict 4 | Apply concrete healer sealer to SN 063-0002 carrying US 136/IL 78/IL 97 over the Illinois River in Havana. (MBPM Project) | — | Executed | ERA-Valdivia Contractors, Inc. $165,046 · | ||
| Jun 14, 2019 | 68E87 | PeoriaDistrict 4 | PATCHING ON IL 6 AND I-474 FROM IL 40 (KNOXVILLE AVE) TO STRUCTURE OVER IL 8 IN PEORIA. | — | Executed | G. M. Sipes Construction, Inc. $432,414 · | ||
| Jun 14, 2019 | 68E89 | TazewellDistrict 4 | PARTIAL DEPTH PATCHING ON IL 8/BUS 24 FROM LEGION RD. TO EAST CITY LIMITS IN WASHINGTON. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $359,429 · | ||
| Jun 14, 2019 | 68E91 | PeoriaDistrict 4 | INSTALLATION OF CENTRAL TRAFFIC SIGNAL SYSTEM SOFTWARE, TRAFFIC SIGNAL CONTROLLERS, AND TRAFFIC SIGNAL CABINETS AT VARIOUS INTERSECTIONS LOCATED WITH- IN PEORIA. | — | Rejected | Oberlander Electric Co. $540,150 · | ||
| Jun 14, 2019 | 68E95 | MarshallWoodfordDistrict 4 | 22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17. | — | Executed | Beniach Construction Co., Inc. $653,392 · | ||
| Jun 14, 2019 | 68F02 | PeoriaDistrict 4 | MILL AND OVERLAY SN 072-0012 AND 072-0133 CARRYING ADAMS ST OVER BNSF AND UP RAILROADS AT THE WESTERN CITY LIMITS OF PEORIA. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $261,161 · | ||
| Jun 14, 2019 | 68F03 | HenryKnoxDistrict 4 | REMOVAL OF EXISTING HPS LUMINAIRES AND INSTALLATION OF LED LUMINAIRES ON EXISTING LIGHT POLES ALONG I-74 AT VARIOUS LOCATIONS. | — | Executed | Laser Electric, Inc. $69,997 · | ||
| Jun 14, 2019 | 89462 | MarshallDistrict 4 | Resurfacing, aggregate and HMA shoulders, culvert extensions, guardrail and pavement markings on Yankee Lane from IL 17 to Peoria County line. | — | Executed | Advanced Asphalt Company $1,499,476 · | ||
| Jun 14, 2019 | 89715 | FultonDistrict 4 | Install ornamental lighting, sidewalks, curb and gutter, storm sewers, pavement milling, resurfacing and markings on IL 116/78 from Main Street to Lightfoot Road in Farmington. | — | Executed | Otto Baum Company, Inc. $1,756,231 · | ||
| Jun 14, 2019 | 89742 | FultonDistrict 4 | Processing modified soils, HMA resurfacing, aggregate shoulders, pipe culverts and pavement markings on CH 2 from Airport Road to the BSNF Railroad crossing. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,105,754 · | ||
| Jun 14, 2019 | 89750 | PeoriaDistrict 4 | Replace the bridge carrying Streitmattes Road over a Branch of Spoon River, located 1.6 miles Southeast of Duncan. | — | Executed | Stark Excavating, Inc. $823,220 · | ||
| Jul 12, 2019 | 68C97 | TazewellWoodfordDistrict 4 | Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 · | ||
| Jul 12, 2019 | 68D00 | HenryStarkDistrict 4 | 2.93 miles of resurfacing, patching, and partial depth patching from N of IL-17 (W) to just N of the Stark/Henry County Line. | — | Executed | Advanced Asphalt Company $1,709,624 · | ||
| Jul 12, 2019 | 68D68 | MarshallPeoriaDistrict 4 | 7.5 miles of resurfacing on IL-29 from Senachwine Creek in Chilicothe to IL-17 E in Sparland. | — | Executed | Advanced Asphalt Company $3,791,715 · | ||
| Jul 12, 2019 | 68D88 | PeoriaDistrict 4 | Milling and resurfacing on IL-9 from 0.27 miles E of US 24 to the McNaughton bridge. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,138,535 · | ||
| Jul 12, 2019 | 68E93 | PeoriaDistrict 4 | Resurfacing on IL-40 from Ravinswood Rd. to N of Timber Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,243,611 · | ||
| Jul 12, 2019 | 68F10 | HendersonDistrict 4 | Resurfacing Gulfport Interchange US 34 ramp EB to US 4, US 34 EB to Chinn Ave, US 34 WB to US 34 ramp WB. and Chinn Ave to US 34. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,415,327 · | ||
| Aug 2, 2019 | 68E92 | TazewellDistrict 4 | Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $316,579 · | ||
| Aug 2, 2019 | 68E96 | PeoriaDistrict 4 | 1.7 miles of patching and joint repair on IL 40 (Knoxville Avenue) from Timber Lane to Bethany Way in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $276,562 · | ||
| Aug 2, 2019 | 68F06 | VariousDistrict 4 | Rout and seal at various locations within the western ha;f of district four. | — | Executed | Freehill Asphalt, Inc. $523,664 · | ||
| Aug 2, 2019 | 68F07 | VariousDistrict 4 | Rout and seal various locations within the eastern half of District 4 | — | Rejected | Complete Asphalt Service Co. $572,132 · | ||
| Sep 20, 2019 | 68758 | KnoxDistrict 4 | Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. | — | Executed | Otto Baum Company, Inc. $2,245,718 · | ||
| Sep 20, 2019 | 68C57 | PeoriaDistrict 4 | SUPERSTRUCTURE REPLACEMENT TO SN 072-0073 CARRYING BELL SCHOOL RD OVER I-74 AND RESURFACE IL 78 FROM I-74 N 0.13 MI AND 0.2 MI S. | — | Executed | Stark Excavating, Inc. $2,937,974 · | ||
| Sep 20, 2019 | 68C65 | KnoxDistrict 4 | CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. | — | Executed | Valley Construction Co. $1,513,546 · | ||
| Sep 20, 2019 | 68E16 | PeoriaTazewellDistrict 4 | CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. | — | Executed | Hoerr Construction, Inc. $769,350 · | ||
| Sep 20, 2019 | 68E27 | TazewellDistrict 4 | BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. | — | Executed | Halverson Construction Co., Inc. $853,648 · | ||
| Sep 20, 2019 | 68E53 | PeoriaTazewellDistrict 4 | CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. | — | Executed | Otto Baum Company, Inc. $537,618 · | ||
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. | — | Executed | Otto Baum Company, Inc. $6,378,025 · | ||
| Nov 8, 2019 | 68B62 | WoodfordDistrict 4 | Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 · | ||
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. | — | Executed | ICC Group Inc. $42,221,000 · | ||
| Nov 8, 2019 | 68F17 | VariousDistrict 4 | Inspection, maintenance, and repair of existing lighting and electrical facilities at various locations. | — | Executed | Bodine Electric of Decatur $459,726 · | ||
| Nov 8, 2019 | 89744 | PeoriaDistrict 4 | Replace bridge carrying Smithville Road over Copperas Creek, located 0.6 miles west of Trivoli Road. | — | Executed | Stark Excavating, Inc. $1,238,874 · | ||
| Nov 8, 2019 | 89748 | PeoriaDistrict 4 | Replace bridge carrying Kickapoo Creek Road over an unnamed tributary to Kickapoo Creek, located 0.10 miles north of Adams Street. | — | Active | |||
| Nov 8, 2019 | 89762 | WarrenDistrict 4 | Full Depth reclamation with emulsified asphalt and cement and surface profiling and 2" HMA from IL 164 to 300th Avenue in Alexis. | — | Executed | Dunn Company $1,289,284 · | ||
| Jan 17, 2020 | 68C64 | FultonDistrict 4 | 0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City. | — | Rejected | Gunther Construction, a div of UCM, Inc. $2,986,769 · | ||
| Jan 17, 2020 | 68D86 | WarrenDistrict 4 | Rehabilitation to SN 094-0041 carrying US 34 over US 67 and SN 094-0033 carrying US 34 over the BNSF Railroad, Southwest of Monmouth. | — | Executed | Brandt Construction Co. $1,525,000 · | ||
| Jan 17, 2020 | 68E34 | WoodfordDistrict 4 | Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116. | — | Executed | Advanced Asphalt Company $9,680,201 · | ||
| Jan 17, 2020 | 68F13 | VariousDistrict 4 | District-wide weed spraying (off road). | — | Executed | ALLEN CHASE ENTERPRISES INC. $117,868 · | ||
| Jan 17, 2020 | 68F14 | VariousDistrict 4 | Dead tree removal at various locations within District 4. | — | Executed | Yeagle's Forestry Mulching & Land Management $164,022 · | ||
| Jan 17, 2020 | 68F18 | MarshallMasonDistrict 4 | Bridge washing of 3 bridges over the Illinois River. | — | Executed | M & M Concrete, Inc. $94,950 · | ||
| Jan 17, 2020 | 89708 | PutnamDistrict 4 | Replace the bridge carrying CH16 over Illinois River tributary, includes roadway and channel realignment. Project is located 3.0 miles northeast of Granville. | — | Executed | Stark Excavating, Inc. $2,278,900 · | ||
| Jan 17, 2020 | 89753 | McDonoughDistrict 4 | Replace the bridge carrying CH 9 over Sugar Creek, 2 miles west of Vermont. | — | Executed | County Contractors, Inc. $1,627,348 · | ||
| Mar 6, 2020 | 68656 | KnoxDistrict 4 | Resurfacing on I-74 from 0.3 miles N of US Rte 34 to 0.4 miles N of Main St in Galesburg. | — | Executed | Gunther Construction, a div of UCM, Inc. $8,250,984 · | ||
| Mar 6, 2020 | 68805 | WoodfordDistrict 4 | Rehabilitation of the superstructure that carries IL Rte 116 over the west branch of Panther Creek in Roanoke. | — | Executed | Stark Excavating, Inc. $976,351 · | ||
| Mar 6, 2020 | 68814 | WarrenDistrict 4 | Resurfacing on IL 116 from TR 154 to the Knox County Line. | — | Executed | Gunther Construction, a div of UCM, Inc. $3,872,911 · | ||
| Mar 6, 2020 | 68A76 | PeoriaDistrict 4 | Resurfacing on IL Rte 91 from the IL Rte 90E junction to S of Parks School Rd in Dunlap. | — | Executed | Advanced Asphalt Company $1,656,535 · | ||
| Mar 6, 2020 | 68C98 | PeoriaDistrict 4 | Approximately 4.4 miles of ramp pavement and approximately 3.0 miles of Class A and B patching, resurfacing the concrete pavement, drainage improvements, guardrail replacement, pavement markings, aggregate shoulders, construction of detour route turnaround, electrical improvements, and structural repairs. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $13,768,359 · | ||
| Mar 6, 2020 | 68E24 | WoodfordDistrict 4 | Resurfacing I-39 from N of El Paso to 3.1 miles S of Il 116. | — | Executed | Rowe Construction, a div of UCM, Inc. $11,997,953 · | ||
| Mar 6, 2020 | 68E58 | PeoriaDistrict 4 | 1.0 mile milling and resurfacing along US 150 from W of Northland Ave to W of Brandywine Dr. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,379,094 · | ||
| Mar 6, 2020 | 68E72 | PeoriaTazewellDistrict 4 | Installation of dynamic message signs and associated work at four locations along I-74. | — | Executed | Western Remac, Inc. $1,157,885 · | ||
| Mar 6, 2020 | 68E79 | TazewellDistrict 4 | Bridge rehabilitation, joint replacement, and deck repairs to SN 090-0114 over the Illinois River at Pekin. | — | Rejected | ICC Group Inc. $4,871,500 · | ||
| Mar 6, 2020 | 68F00 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tension cable barrier) at various locations. | — | Executed | Northern Contracting, Inc. $559,200 · | ||
| Mar 6, 2020 | 68F05 | PeoriaDistrict 4 | Landscaping along I-74 from Ellis St in Peoria to the Illinois River. | — | Executed | Central Landscaping, LP $181,242 · | ||
| Mar 6, 2020 | 68F23 | FultonSchuylerDistrict 4 | 10.5 miles of patching, cold-in-place recycling, and resurfacing from US 136 to 0.4 mile S of the Schuyler County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,653,611 · | ||
| Mar 6, 2020 | 89674 | McDonoughDistrict 4 | Streetscape project including curb and gutter, sidewalks, lighting, and resurfacing on various street in and around the downtown square in Macomb. | — | Rejected | McCarthy Improvement Company $2,422,211 · | ||
| Mar 6, 2020 | 89778 | PeoriaDistrict 4 | Resurfacing Allen Road from Walton Road to 0.2 mile south of Altorfer Drive in the City of Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,067,381 · | ||
| Apr 24, 2020 | 68953 | FultonDistrict 4 | 2.88 miles of HMA cold-in-place, milling and resurfacing along US Rte 24 in Lewistown with minor drainage work and ADA requirements. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,661,940 · | ||
| Apr 24, 2020 | 68A81 | PeoriaDistrict 4 | Resurfacing on IL 29 from 0.2 mile S of Cloverdale Rd in Chillicothe to Dickison Run Creek, N of IL 6 in Peoria County. | — | Executed | Advanced Asphalt Company $9,418,655 · | ||
| Apr 24, 2020 | 68C92 | PeoriaDistrict 4 | Intersection improvement at IL Rte 40 and Lake Ave in Peoria. (Offset left turn lanes.) | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $915,345 · | ||
| Apr 24, 2020 | 68D41 | KnoxDistrict 4 | Replacement of both structures carrying I-74 over French Creek, Class B patching, variable depth milling, placement of HMA, HMA shoulders, and placement of pavement markings in Knox County. | — | Executed | Stark Excavating, Inc. $4,105,900 · | ||
| Apr 24, 2020 | 68E88 | PeoriaDistrict 4 | Repair to ramps on I-474 at Airport Rd and US Rte 24 interchanges in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $476,329 · | ||
| Apr 24, 2020 | 68E90 | VariousDistrict 4 | Bridge deck sealing on various bridges. | — | Executed | M & M Concrete, Inc. $236,989 · | ||
| Apr 24, 2020 | 68F01 | FultonDistrict 4 | 4 miles of microsurfacing on US 24 from the eastern city limits of Astoria to west of Izaak Walton Rd. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $272,635 · | ||
| Apr 24, 2020 | 68F04 | VariousDistrict 4 | Pavement markings on various routes in various counties. | — | Executed | Varsity Striping & Construction Co. $245,934 · | ||
| Apr 24, 2020 | 68F16 | McDonoughWarrenDistrict 4 | 8 miles of microsurfacing on IL 110/US 67 from 0.4 mile S of N 2100 Rd to N of 40th Ave in Warren and McDonough Counties. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $826,923 · | ||
| Apr 24, 2020 | 68F20 | PeoriaTazewellDistrict 4 | Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties. | — | Executed | Oberlander Electric Co. $374,200 · | ||
| Apr 24, 2020 | 68F22 | McDonoughDistrict 4 | Resurfacing on IL 61 from IL 336 to CH 24 in Colmar. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,345,362 · | ||
| Apr 24, 2020 | 68F25 | McDonoughDistrict 4 | 10.5 miles of microsurfacing on US 136/IL 336 from the Hancock County Line to IL 336; IL 110/IL 336 from US 136 W to 0.5 mile S of US 136, W of Macomb. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $1,210,945 · | ||
| Apr 24, 2020 | 68F42 | PeoriaDistrict 4 | Ramp metering along the entrance ramp from Fayette St to Eastbound I-74 in Peoria. | — | Executed | Laser Electric, Inc. $174,042 · | ||
| Apr 24, 2020 | 68F48 | WoodfordDistrict 4 | Bridge painting along the I-39 corridor in Woodford County on SNs 102-0058, 102-0059, 102-0060, 1020061, and 1020062. | — | Executed | ERA-Valdivia Contractors, Inc. $1,367,875 · | ||
| Apr 24, 2020 | 68F56 | VariousDistrict 4 | Light pole replacement, luminaire replacement, and miscellaneous electrical work at various locations. | — | Executed | Laser Electric, Inc. $191,438 · | ||
| Apr 24, 2020 | 89771 | McDonoughDistrict 4 | Sidewalk replacement, construction of a segmental block wall and pavement markings on Grant Street at McArthur School in Macomb. | — | Executed | Laverdiere Construction, Inc. $235,207 · | ||
| Apr 24, 2020 | 89772 | McDonoughDistrict 4 | Sidewalk remmoval and replacement including ADA ramps on various routes in the City of Colchester. | — | Executed | Laverdiere Construction, Inc. $196,378 · | ||
| Apr 24, 2020 | 89773 | PeoriaDistrict 4 | Construction of new sidewalks and a refuge island, signing and lighting improvements on IL 91, located south of Copperfield Drive in the Village of Dunlap. | — | Executed | Illinois Civil Contractors, Inc. $179,736 · | ||
| Apr 24, 2020 | 89774 | HendersonDistrict 4 | Sidewalk replacement, new sidewalks, solar signing and pavement markings on South Street from Dixon Street to Jones Street, and Dixon Street at South Street in Stronghurst. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $135,864 · | ||
| Jun 12, 2020 | 46542 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols , and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $967,978 · | ||
| Jun 12, 2020 | 46546 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers within the limits shown. | — | Executed | P & P Construction Co. $610,661 · | ||
| Jun 12, 2020 | 68894 | TazewellDistrict 4 | Replacement of SN 090-0091 carrying Pinecrest Dr over I-74, 2 miles E of the IL 8 interchange. | — | Executed | Otto Baum Company, Inc. $9,626,406 · | ||
| Jun 12, 2020 | 68A83 | PeoriaDistrict 4 | Resurfacing on I-74 from E of Il 78 to W of Kickapoo/Edwards Rd including joint replacement and slope wall repair to SN-s 072-0077 and 072-0078 over Schlink Rd and joint replacement to SN-s 072-0078 and 072-0080 on I-74 over Kickapoo Creek. | — | Executed | Advanced Asphalt Company $16,030,666 · | ||
| Jun 12, 2020 | 68F24 | WoodfordDistrict 4 | 9 miles of surface maintenance on IL 26 from the Marshall County line to the north city limits of Spring Bay (Zimmerman Rd). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,995,170 · | ||
| Jun 12, 2020 | 68F40 | VariousDistrict 4 | Replace river clearance gauge signage on the Illinois River Bridges in District 4. SN-s 062-0003, 090-0001, 090-0122, 090-0108, and 090-0109. | — | Executed | Western Remac, Inc. $217,000 · | ||
| Jun 12, 2020 | 68F52 | MarshallWoodfordDistrict 4 | 10 miles of pavement patching on I-39 from N of IL 116 to S of IL 17.. | — | Executed | Kinney Contractors, Inc. $434,438 · | ||
| Jun 12, 2020 | 68F53 | KnoxDistrict 4 | Beam straightening and strengthening on SN 048-0022 carrying US 34/IL 110 over US 150. | — | Executed | Halverson Construction Co., Inc. $49,336 · | ||
| Jun 12, 2020 | 68F55 | HenryDistrict 4 | Culvert repair to SN 037-2010 on I-74/IL 110, 0.1 mile N of the Knox County line. | — | Executed | Phoenix Corporation of the Quad Cities $79,729 · | ||
| Jun 12, 2020 | 68F58 | PeoriaDistrict 4 | 2.42 miles of longitudinal joint repair and pavement marking maintenance along US 150 (War Memorial Dr) from N Frostwood Pkwy to W Northbound Ave. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $591,671 · | ||
| Jun 12, 2020 | 68F59 | HendersonDistrict 4 | Placement of riprap and grout around piers of SN 036-0037 carrying IL 164 over Henderson Creek 1.5 miles E of Oquawka. | — | Executed | Brandt Construction Co. $108,000 · | ||
| Jun 12, 2020 | 68F60 | HendersonDistrict 4 | Repair to North abutment with structural fa«ade to SN 036-0010 over Honey Creek, 1.5 miles S of Stronghurst. | — | Executed | Brandt Construction Co. $100,853 · | ||
| Jun 12, 2020 | 68F62 | PeoriaDistrict 4 | Shoulder repair along IL 6 from the IL 29 interchange to E of IL 40 (Knoxville Ave) in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $629,048 · | ||
| Jun 12, 2020 | 89738 | KnoxDistrict 4 | Reconstruct South Seminary Street from East Berrien Street to Fifth Steet in Galesburg. | — | Executed | Brandt Construction Co. $3,385,000 · | ||
| Jun 12, 2020 | 89782 | MercerDistrict 4 | Full-depth pavement reclamation followed by an A-3 bituminous surface treatment and aggregate wedge shoulders on CH 9 from 0.36 mile south of 155th Avenue to 110th Street. | — | Executed | Tri-City Blacktop, Inc. $600,700 · | ||
| Jul 31, 2020 | 68E18 | KnoxDistrict 4 | Culvert repair to culvert east side of IL Rte 41, approximately 0.57 mi S of IL 116 in Knox County. | — | Executed | Brandt Construction Co. $199,999 · | ||
| Jul 31, 2020 | 68F15 | PeoriaDistrict 4 | 5.75 miles of resurfacing on I-74 from W of Kickapoo/Edwards Rd to 0.7 mile E of I-474. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $10,969,411 · | ||
| Jul 31, 2020 | 68F21 | HendersonDistrict 4 | Resurface IL 164 from 8th St in Oquaka to the Warren County line in Henderson county. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,175,199 · | ||
| Jul 31, 2020 | 68F61 | PeoriaDistrict 4 | Substructure repair to SN 072-0138 carrying IL 6 over Charter Oak Rd in Peoria. | — | Executed | Halverson Construction Co., Inc. $190,984 · | ||
| Jul 31, 2020 | 68F66 | PeoriaDistrict 4 | Bridge beam replacement on SN 072-0056 at Dry Run Creek E of Sterling Ave in West Peoria. | — | Executed | Otto Baum Company, Inc. $132,756 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.