IDOT Jobs

All dates · 1,037 jobs · $1,971,468,000 Sign up free
★ My Jobs

Filtered by: District: District 2 Clear all

1,037 jobs · $1,971,468,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 18, 2022 64R83 HenryRock IslandDistrict 2 Washing five bridges over the Rock River in Henry and Rock Island Counties. — Executed Nov 26 New All States Painting, Inc. $68,000 ·
Nov 18, 2022 64R84 VariousDistrict 2 Washing eight bridges at various locations in Henry, Lee, Ogle, Stephenson, and Whiteside Counties. — Executed Nov 26 New All States Painting, Inc. $81,900 ·
Nov 18, 2022 64R98 StephensonDistrict 2 0.8 mile Class B patching from North of Fairgrounds Road to South Street in Freeport. — Executed Nov 26 New Triggi Construction, Inc. $558,348 ·
Nov 18, 2022 64S06 WhitesideDistrict 2 Pavement patching from Rock lsland/Whiteside County line to 3.10 mile North East. — Executed Nov 26 New G. M. Sipes Construction, Inc. $638,966 ·
Nov 18, 2022 85728 Rock IslandDistrict 2 Removal of existing steel pile retaining walk and construction of a 330' drilled shaft foundation retaining wall supporting concrete columns and web walls with HMA pavement removal and replacement, aggregate shoulders, reshaping of ditches, and grading along county highway 11 in Rock Island County . — Executed Nov 26 New General Constructors Inc. of the Quad Cities $988,253 ·
Jan 20, 2023 64N68 Rock IslandDistrict 2 Replace highway lighting at the interchange of 1-280 with IL 92. — Executed Nov 26 New Tri-City Electric Company of Iowa $288,884 ·
Jan 20, 2023 64N69 Rock IslandDistrict 2 Replace highway lighting at the interchange of IL 92/IL 5 with IL 84, near Carbon Cliff. — Executed Nov 26 New Tri-City Electric Company of Iowa $229,250 ·
Jan 20, 2023 64P43 Rock IslandDistrict 2 Pavement patching, cold milling, HMA resurfacing on IL 5 and expansion joint replacement, deck patching, HMA wearing surface with waterproofing membrane system and misc. other bridge repairs on: SN 081-0095 and 081-0096 carrying IL 5 over 27th Street, and SN 081-0097 and 081-0098 carrying IL 5 over I-74. — Executed Nov 26 New Valley Construction Co. $7,037,577 ·
Jan 20, 2023 64R48 CarrollDistrict 2 Deck repair, and installation of deck concrete wearing surface including approaches on SN 008-0042 carrying IL 78 over East Plum River, 3.4 miles South of JoDaviess County line. — Executed Nov 26 New Sjostrom & Sons, Inc. $606,592 ·
Jan 20, 2023 64R49 BooneDistrict 2 Deck repair, slope wall repair and microsilica overlay on SN 004-0016 carrying IL 76 over Beaver Creek, 2.5 mi South of IL 173. — Executed Nov 26 New Sjostrom & Sons, Inc. $586,034 ·
Jan 20, 2023 64R54 LeeDistrict 2 Expansion joint replacement, miscellaneous repairs and deck concrete wearing surface on SN 052-0031 carrying US 30 over UP RR, 0.9 miles East of Whiteside County line. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $699,832 ·
Jan 20, 2023 64R78 VariousDistrict 2 Guardrail and fence repairs along State maintained route in District 2. — Executed Nov 26 New
Jan 20, 2023 64R79 VariousDistrict 2 Roadside restoration of Right-of-Way turf damage caused by motorists along State maintained routes within District 2. — Executed Nov 26 New O'Brien Civil Works, Inc. $68,120 ·
Jan 20, 2023 64S17 BooneCarrollDistrict 2 Bridge deck sealing of 3 structures in Boone County and 11 structures in Carroll County. — Executed Nov 26 New M & M Concrete, Inc. $14,531 ·
Jan 20, 2023 64S18 HenryDistrict 2 Bridge deck sealing of 30 structures in Henry County. — Executed Nov 26 New All States Painting, Inc. $34,199 ·
Jan 20, 2023 64S19 VariousDistrict 2 Bridge deck sealing of 10 structures in Lee County, 5 structures in Ogle County and 4 structures in Winnebago County. — Executed Nov 26 New All States Painting, Inc. $28,999 ·
Jan 20, 2023 85700 LeeDistrict 2 Construction of a shared-use path, concrete curb and gutter, driveways, drainage adjustments, boardwalk structures, retaining walls, lighting, and landscaping along an abandoned railroad from South Peoria Avenue to Depot Avenue in Dixon. — Executed Nov 26 New Martin & Company Excavating $4,313,104 ·
Jan 20, 2023 85730 LeeDistrict 2 Resurfacing, sidewalks, curb and guttr, segmantal block wall, signing and pavement markings on various routes in Dixon. — Executed Nov 26 New Martin & Company Excavating $2,010,320 ·
Jan 20, 2023 85731 OgleDistrict 2 Remove 3 span steel girder bridge and replace with 3-span I-beam bridge with HMA approach, and raised roadway profile on Milledgeville Road over Buffalo Creek. — Executed Nov 26 New Sjostrom & Sons, Inc. $2,993,599 ·
Jan 20, 2023 85732 BooneDistrict 2 Removal of a three-span concrete slab bridge and construction of a two-span PPC I-Beam bridge with integral abutments and approach roadway construction on Poplar Grove Road over Beaver Creek in Boone County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,640,467 ·
Mar 10, 2023 46611 VariousDistrict 2 Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. — Executed Nov 26 New O'Brien Civil Works, Inc. $144,456 ·
Mar 10, 2023 46612 VariousDistrict 2 Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. — Executed Nov 26 New A. C. Pavement Striping Co. $1,999,000 ·
Mar 10, 2023 64M40 WinnebagoDistrict 2 2.7 miles of Cold Milling and Hot Mix Asphalt Resurfacing on US 20 from Rock River to 0.7 miles West of Alpine Rd in Rockford. — Executed Nov 26 New Rock Road Companies, Inc. $9,575,729 ·
Mar 10, 2023 64N66 Rock IslandDistrict 2 2.61 Miles - Cold Milling, Pavement Patching, and HMA Resurfacing - US 150 from US 6 to East 3rd Street in Coal Valley. — Executed Nov 26 New Advanced Asphalt Company $1,458,298 ·
Mar 10, 2023 64S12 WhitesideDistrict 2 Bridge painting on SN's 098-0059 and 098-0060. — Executed Nov 26 New Civil Coatings and Construction Inc. $367,125 ·
Mar 10, 2023 64S15 Rock IslandDistrict 2 Bridge deck overlay, misc bridge repairs on carrying SN 081-0131 over I-88. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $421,357 ·
Mar 10, 2023 64S20 WinnebagoDistrict 2 1.07 mile, Standard Overlay from Charles St to Harrison Ave. — Executed Nov 26 New Rock Road Companies, Inc. $1,034,117 ·
Mar 10, 2023 64S21 Rock IslandDistrict 2 Milling and resurfacing the Silvis Maintenance Yard. — Executed Nov 26 New Advanced Asphalt Company $166,800 ·
Mar 10, 2023 64S22 LeeDistrict 2 Milling and resurfacing the Amboy Maintenance yard. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $219,492 ·
Mar 10, 2023 64S24 Rock IslandDistrict 2 Bridge joint repair, misc bridge repairs carrying SN 081-0125 over I-88. — Executed Nov 26 New General Constructors Inc. of the Quad Cities $533,147 ·
Mar 10, 2023 85733 OgleDistrict 2 Resurfacing on Lowell Park Road from Pines Road to the Lee County Line — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $940,932 ·
Mar 10, 2023 85735 StephensonDistrict 2 Cold in Place recycling with HMA overlay on Red Oak Road from the east city limits of Red Oak City to the west city limits of Cedarville, and on Scioto Mills Road from 0.1 mile west of Iris Hill Road to IL 26. — Executed Nov 26 New Dunn Company $684,583 ·
Mar 10, 2023 85736 HenryDistrict 2 Cold in Place recycling with seal coat overlay on CH 14 from CH 5 to IL 78. — Executed Nov 26 New Dunn Company $1,072,851 ·
Mar 10, 2023 85737 WhitesideDistrict 2 4 inch Cold in Place recycling and HMA resurfacing on Albany Road from Sand Road to Burns Road and on Cordova Road from I-88 to 6th Avenue. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,297,131 ·
Mar 10, 2023 85738 Rock IslandDistrict 2 HMA resurfacing with patching, curb and sidewalk repair on Avenue of the Cities from 24th Street to 41st Street in Moline. — Executed Nov 26 New Brandt Construction Co. $522,000 ·
Apr 28, 2023 46613 VariousDistrict 2 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,215,175 ·
Apr 28, 2023 64P59 Rock IslandDistrict 2 ADA Improvements from 2nd Avenue to 5th Avenue in Rock Island. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $1,016,771 ·
Apr 28, 2023 64P85 Rock IslandDistrict 2 Bridge deck overlay and repairs on SN's 081-0122, 081-0123, 081-0128, 081-0129, 081-0134 and 081-0135. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,922,476 ·
Apr 28, 2023 64P93 WhitesideDistrict 2 Intersection Reconstruction of IL 40 at Science Ridge Road North of Sterling into a modern roundabout. — Executed Nov 26 New McCarthy Improvement Company $3,267,000 ·
Apr 28, 2023 64S01 OgleWinnebagoDistrict 2 10.6miles pavement patching from IL 72 (E) in Byron to Beltline Road South of Rockford. — Executed Nov 26 New Martin & Company Excavating $1,472,257 ·
Apr 28, 2023 64S13 Rock IslandDistrict 2 Bridge painting on SN's 081-0121, 081-0007 and 081-0008. — Executed Nov 26 New Civil Coatings and Construction Inc. $553,400 ·
Apr 28, 2023 64S14 StephensonDistrict 2 Bridge painting on SN's 089-0050, 089-0061 and 089-0044. — Executed Nov 26 New Venus Painting Co. $807,968 ·
Apr 28, 2023 64S23 WhitesideDistrict 2 SN 098-0034 Bridge Deck Grinding over the Rock River 1.5 MI W of Rock Falls. — Executed Nov 26 New Quality Saw & Seal, Inc. $93,368 ·
Apr 28, 2023 64S48 Rock IslandDistrict 2 Intermittent Resurfacing on IL 92 from Turkey Hollow Rd. to IL 192. — Executed Nov 26 New Langman Construction, Inc. $1,334,652 ·
Apr 28, 2023 85734 WhitesideDistrict 2 Replace the bridge carrying Dixon Avenue over Howland Creek, 2/6 miles east of Rock Falls. — Executed Nov 26 New Martin & Company Excavating $2,072,031 ·
Apr 28, 2023 85739 WinnebagoDistrict 2 Resurfacing, guardrail replacement, grading and shaping ditches, centerline and shoulder rumble strips, streetlighting on Belvidere Road from Main Street in Roscoe to IL 173 — Executed Nov 26 New Curran Contracting Company $1,943,251 ·
Apr 28, 2023 85740 Rock IslandDistrict 2 Resurfacing 7th Street from 12th Avenue to 16th Avenue in Moline. — Executed Nov 26 New Brandt Construction Co. $344,065 ·
Apr 28, 2023 85742 StephensonDistrict 2 Remove existing structure and replace with a single span PPC deck beam bridge with HMA approach, and traffic barrier terminals on Cedarville Road over a Branch of Brown Creek, 3 miles southeast of Dakota. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $554,922 ·
Jun 16, 2023 64B13 WinnebagoDistrict 2 Reconstruction of the I-39/US 20 Interchange. — Executed Nov 26 New Curran Contracting Company and Civil Constructors, Inc. d/b/a Helm Civil Joint Venture $98,823,286 ·
Jun 16, 2023 64F57 OgleWhitesideDistrict 2 Removal and Replacment of two structures carrying Freeport Rd. over Jordan Creek: SN 071-1001 located 0.5M (N) of Pilgrim Rd. in Ogle Co. and SN 098-0049 located 0.2M (S) of Pilgrim Rd. in Whiteside Co., Jordan Creek 6 Mi N of Sterling and Sterling and Jordan Creek 0.4 Mi N of Lee/Whiteside Co Line. — Executed Nov 26 New Martin & Company Excavating $2,530,997 ·
Jun 16, 2023 64P63 WhitesideDistrict 2 Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,610,549 ·
Jun 16, 2023 64R55 CarrollDistrict 2 Expansion joint replacement, miscellaneous repairs and deck concrete wearing surface on SN 008-0028 carrying IL 84 over Plum River, 1.0 miles South of US 52/IL 64 South of Savanna and SN 008-0040 carrying IL 84 over BNSF RR, 0.3 miles South of US 52/IL 64 in Savanna. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,495,293 ·
Jun 16, 2023 64R57 WinnebagoDistrict 2 Lighting on US 20 at Alpine Rd interchange. — Executed Nov 26 New William Charles Construction Co, LLC $428,323 ·
Jun 16, 2023 64R58 LeeDistrict 2 Lighting at I-39 AT US 30. — Executed Nov 26 New William Charles Construction Co, LLC $335,994 ·
Jun 16, 2023 64S03 Rock IslandDistrict 2 Bridge joint replacement, misc bridge repair carrying SN 081-0121 over I-88. — Executed Nov 26 New Path Construction Company, Inc. $42,950 ·
Jun 16, 2023 64S04 WhitesideDistrict 2 Bridge joint replacement and misc bridge repairs carrying SN 098-0065 over I-88. — Executed Nov 26 New Martin & Company Excavating $925,041 ·
Jun 16, 2023 64S08 Rock IslandDistrict 2 Bridge joint replacement, misc bridge repair carrying SN 081-0126 over I-88. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $125,695 ·
Jun 16, 2023 64S09 Rock IslandDistrict 2 Bridge joint replacement, misc bridge repair carrying SN 081-0133 over I-88. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $187,707 ·
Jun 16, 2023 64S16 Jo DaviessDistrict 2 House and Garage Demolition of 420 Wall St. in East Dubuque. — Executed Nov 26 New Fischer Excavating, Inc. $57,911 ·
Jun 16, 2023 85741 WinnebagoDistrict 2 Construction of an HMA shared-use path with storm sewer, curb and gutter, PCC pavement, sidewalk and landscaping along Perryville Road from Anjel Way to Willowbrook Lane in the Village of Machesney Park. — Executed Nov 26 New N-Trak Group LLC $920,853 ·
Jun 16, 2023 85745 StephensonDistrict 2 Replace the bridge carrying TR 222 over Crane Grove Creek, 4.5 miles west of German Valley. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $309,936 ·
Aug 4, 2023 64K08 WhitesideDistrict 2 Reconstruction of IL 78 from 0.1 mile S. of US 30 to 0.1 mile S. of Academic Drive in Morrison. — Executed Nov 26 New Fischer Excavating, Inc. $5,087,535 ·
Aug 4, 2023 85744 Rock IslandDistrict 2 PCC Shared-Use path on 19th Street from Avenue of the Cities to 18th Avenue, and reduction of lanes on 19th street from 7th Avenue to River Drive in Moline. — Executed Nov 26 New Valley Construction Co. $3,136,598 ·
Sep 22, 2023 64S50 Rock IslandDistrict 2 Bridge deck repairs carrying SN 081-0011 over Mississippi River. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $953,837 ·
Sep 22, 2023 64S56 Rock IslandDistrict 2 1.2 miles of pavement patching. U.S. 67: Airport Rd to 3rd Ave in Milan and Airport Rd: I-280 ramp to US 67. — Executed Nov 26 New G. M. Sipes Construction, Inc. $378,959 ·
Sep 22, 2023 64S60 Rock IslandDistrict 2 1 mile of pavement patching from 52nd St. to 64th St. — Executed Nov 26 New G. M. Sipes Construction, Inc. $357,679 ·
Sep 22, 2023 64S83 VariousDistrict 2 Upgrade and installation of horizontal alignment signing along curves at various locations. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $429,400 ·
Nov 17, 2023 46636 VariousDistrict 2 Placing various widths of Preformed Plastic and Modified_Urethane pavement marking lines, letters and symbols within the limits specified on each individual work order. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $3,497,990 ·
Nov 17, 2023 64918 CarrollDistrict 2 Patching, Resurfacing and ADA improvements on IL 78 from 0.2 mile N. of US 52/IL 64 to Carroll Creek in Mt. Carroll. — Executed Nov 26 New Martin & Company Excavating $1,429,025 ·
Nov 17, 2023 64K73 WinnebagoDistrict 2 Removal and replacement of twin structures carrying IL Route 2 over the Rock River in Rockton. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $25,360,046 ·
Nov 17, 2023 64S39 WhitesideDistrict 2 Bridge deck overlay, joint replacement and miscellaneous repairs on SN 098-0086, carrying IL 40 over I-88, 1 mile south of US 30. — Executed Nov 26 New Martin & Company Excavating $1,375,082 ·
Nov 17, 2023 64S40 WhitesideDistrict 2 Bridge deck overlay, joint replacement, and miscellaneous repairs on SN 098-0091, carrying US 30 over I-88, 3 miles east of Rock Falls. — Executed Nov 26 New Martin & Company Excavating $1,248,487 ·
Nov 17, 2023 64S43 Rock IslandDistrict 2 Bridge washing of SN 081-0011 over the Mississippi River in Rock Island County. — Executed Nov 26 New Interstate Maintenance, Incorporated $149,550 ·
Nov 17, 2023 64S44 Rock IslandDistrict 2 Bridge washing of SN 081-0106 over the Mississippi River in Rock Island County. — Executed Nov 26 New Interstate Maintenance, Incorporated $59,340 ·
Nov 17, 2023 64S45 VariousDistrict 2 Bridge washing of SN 008-0052, 098-6003 and 081-9905 over the Mississippi River in various counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $123,440 ·
Nov 17, 2023 85727 WinnebagoDistrict 2 Sidewalk construction along Parkview Avenue from Spring Creek Road to Birchwood Drive in Rockford. — Executed Nov 26 New N-Trak Group LLC $489,794 ·
Jan 19, 2024 46640 VariousDistrict 2 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work consists of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order. — Executed Nov 26 New P & P Construction Co. $1,104,220 ·
Jan 19, 2024 64P11 Jo DaviessDistrict 2 Patching,Resurf. and ADA improvements on IL 84 from Duke Creek North of Hanover to Southeast of Garfield Street in Hanover. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,414,665 ·
Jan 19, 2024 64P41 BureauWhitesideDistrict 2 Cold Milling, Pavement Patching, and Hot-Mix Asphalt Resurfacing on IL 40 from 0.4 mile north of I-88 to IL 92. — Rejected Nov 26 New Martin & Company Excavating $6,978,085 ·
Jan 19, 2024 64R56 OgleDistrict 2 Lighting at I-88 SE of Rochelle. — Executed Nov 26 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $609,204 ·
Jan 19, 2024 64R71 WinnebagoDistrict 2 2.504 Miles, Reconstruction, I-39: Harrison Ave to 0.4 miles north of Harrison Ave (Including interchange ramps) and US 20: I-39 to Mill Road; and Harrison Ave: Bell School Road to I-39. — Executed Nov 26 New Plote Construction, Inc. $44,321,000 ·
Jan 19, 2024 64S31 WhitesideDistrict 2 Deck repair, joint replacement, deck overlay and other miscellaneous repairs carrying SN's 098-0092, 098-0093 and 098-0094 over Elkhorn Creek, 0.3 mile south of Moline Road and SN's 098-0077 and 098-0078 over I-88, 5.1 miles west of IL 40. — Executed Nov 26 New Martin & Company Excavating $1,822,997 ·
Jan 19, 2024 64S42 VariousDistrict 2 Bridge washing of 6 structures over the Rock River in various Counties. — Executed Nov 26 New All States Painting, Inc. $63,880 ·
Jan 19, 2024 64S46 HenryRock IslandDistrict 2 Bridge washing of 5 structures over the Rock River in Henry and Rock Island Counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $59,200 ·
Jan 19, 2024 64S47 VariousDistrict 2 Bridge washing of 8 structures in various counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $74,800 ·
Jan 19, 2024 64S52 VariousDistrict 2 Bridge deck sealer applied to 36 structures in various Counties. — Executed Nov 26 New M & M Concrete, Inc. $39,339 ·
Jan 19, 2024 64S53 Rock IslandDistrict 2 Bridge deck sealer applied to 18 structures in Rock Island County. — Executed Nov 26 New M & M Concrete, Inc. $21,142 ·
Jan 19, 2024 64S54 VariousDistrict 2 Bridge deck sealer applied to 45 structures in JoDaviess, Stephenson and Whiteside Counties. — Executed Nov 26 New M & M Concrete, Inc. $79,085 ·
Jan 19, 2024 64S57 StephensonDistrict 2 1.5 Miles of inlet repairs along IL 26 in Freeport. — Executed Nov 26 New N-Trak Group LLC $195,045 ·
Jan 19, 2024 64S84 WinnebagoDistrict 2 270' OF CULVERT LINING. US 20 UNDER MERIDIAN RD. — Executed Nov 26 New Hoerr Construction, Inc. $101,460 ·
Jan 19, 2024 64S91 Rock IslandDistrict 2 Cleaning and painting of structural steel on 3 structures, SN 081-0125 carrying IL 92 over I-88, 8.0 miles east of Silvis, SN 081-0131 carrying 94th Avenue over I-88, 0.1 mile west of Hillsdale and SN 098-0065 carrying IL 78 over I-88, 2.0 miles west of Lyndon. — Executed Nov 26 New Three Star Painting, Inc. $765,000 ·
Jan 19, 2024 64S96 VariousDistrict 2 Various routes on-call guardrail. — Executed Nov 26 New Northern Contracting, Inc. $920,949 ·
Jan 19, 2024 64S97 BooneDistrict 2 4 Miles of aggregate shoulder improvement. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $79,978 ·
Jan 19, 2024 64S98 VariousDistrict 2 Various routes, turf repair. — Executed Nov 26 New O'Brien Civil Works, Inc. $98,300 ·
Jan 19, 2024 85746 Rock IslandDistrict 2 HMA resurfacing with aggregate and HMA shoulders on CH 14 from 99th Street to 190th Avenue. — Executed Nov 26 New Valley Construction Co. $338,593 ·
Jan 19, 2024 85747 Rock IslandDistrict 2 Resurfacing 31st Avenue from IL 92 to US 67 in Rock Island. — Executed Nov 26 New Valley Construction Co. $1,389,515 ·
Jan 19, 2024 85748 StephensonDistrict 2 Replace existing structure with single span PPC deck beam structure on concrete abutments, with reconstuction of aggregate approaches and riprap placement on Babler Road over a tributary to Brush Creek, 2 miles southeast of Orangeville. — Executed Nov 26 New Sjostrom & Sons, Inc. $474,974 ·
Jan 19, 2024 85749 StephensonDistrict 2 Cold-In-Place Recycling on River Road from IL 75 to Rock City Road. — Executed Nov 26 New W K Construction Company, Inc. $796,419 ·
Mar 8, 2024 64B39 LeeDistrict 2 Structure replacement ditches in US 30 ROW 1 mile and 1.5 mile west of IL 251. — Executed Nov 26 New Martin & Company Excavating $3,724,770 ·
Mar 8, 2024 64P61 WinnebagoDistrict 2 Cold milling, pavement patching, ADA improvement, and hot-mix asphalt resurfacing on IL 2 from 0.2 miles south of Clifton Avenue to Pond Street in Rockford. — Executed Nov 26 New Curran Contracting Company $614,548 ·
401–500 of 1,037‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.