21-00633-01-BT
- Let date
- Friday, June 16, 2023
- Contract
- 85741 · job page
- District
- District 2
- County
- Winnebago
- Highway
- Limits
- Construction of an HMA shared-use path with storm sewer, curb and gutter, PCC pavement, sidewalk and landscaping along Perryville Road from Anjel Way to Willowbrook Lane in the Village of Machesney Park.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | N-Trak Group LLC Low bidder | $920,853 | ||
| 2 | Fischer Excavating, Inc. | $948,657 | +3.0% | |
| 3 | Stenstrom Excavation & Blacktop, Inc. | $995,443 | +8.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 N-Trak Group LLC | #2 Fischer Excavat… | #3 Stenstrom Excav… |
|---|---|---|---|---|---|---|---|---|
| 1 | A2002916 | T-CELTIS OCCID 2 | 5 | EACH | $500.00 | $503.00 | $507.50 | |
| 2 | A2006416 | T-QUERCUS ALBA 2 | 8 | EACH | $500.00 | $440.00 | $507.50 | |
| 3 | A2007116 | T-QUERCUS RUBRA 2 | 8 | EACH | $500.00 | $450.00 | $507.50 | |
| 4 | X2111100 | TOPSOIL EXC & PLAC SP | 1,877 | CU YD | $15.00 | $20.00 | $19.55 | |
| 5 | X3112900 | SUB GRAN MAT SPL | 2,074 | CU YD | $44.00 | $43.00 | $34.15 | |
| 6 | X4402020 | CONC MEDIAN SURF REM | 180 | SQ FT | $7.00 | $2.00 | $3.70 | |
| 7 | X5427602 | REMOV EX FLAR END SEC | 5 | EACH | $500.00 | $300.00 | $314.00 | |
| 8 | X6013600 | PIPE UNDERDRAIN 4 MOD | 2,035 | FOOT | $25.00 | $22.00 | $25.60 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $10,000.00 | $3,800.00 | $4,060.00 | |
| 10 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $10,000.00 | $5,750.00 | $6,145.00 | |
| 11 | Z0033039 | DISCON/RECON ELEC SER | 4 | EACH | $2,800.00 | $2,620.00 | $2,800.00 | |
| 12 | 20101700 | SUPPLE WATERING | 10 | UNIT | $100.00 | $357.00 | $107.00 | |
| 13 | 20200100 | EARTH EXCAVATION | 6,294 | CU YD | $20.00 | $0.0100 | $27.40 | |
| 14 | 20201200 | REM & DISP UNS MATL | 500 | CU YD | $30.00 | $31.00 | $25.95 | |
| 15 | 20800150 | TRENCH BACKFILL | 84 | CU YD | $25.00 | $23.00 | $0.0100 | |
| 16 | 21001000 | GEOTECH FAB F/GR STAB | 1,500 | SQ YD | $5.00 | $3.50 | $4.95 | |
| 17 | 25000210 | SEEDING CL 2A | 3.49 | ACRE | $2,000.00 | $940.00 | $2,030.00 | |
| 18 | 25000400 | NITROGEN FERT NUTR | 314 | POUND | $1.55 | $2.00 | $1.60 | |
| 19 | 25000500 | PHOSPHORUS FERT NUTR | 314 | POUND | $1.55 | $2.00 | $1.60 | |
| 20 | 25000600 | POTASSIUM FERT NUTR | 314 | POUND | $1.55 | $2.00 | $1.60 | |
| 21 | 25100125 | MULCH METHOD 3 | 2.7 | ACRE | $2,300.00 | $4,272.00 | $2,350.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 1,872 | SQ YD | $1.30 | $2.05 | $1.35 | |
| 23 | 25100635 | HD EROS CONTR BLANKET | 208 | SQ YD | $3.00 | $4.50 | $3.20 | |
| 24 | 28000200 | EARTH EXC - EROS CONT | 50 | CU YD | $40.00 | $22.00 | $54.70 | |
| 25 | 28000250 | TEMP EROS CONTR SEED | 349 | POUND | $1.00 | $3.55 | $1.05 | |
| 26 | 28000305 | TEMP DITCH CHECKS | 448 | FOOT | $12.00 | $5.75 | $12.80 | |
| 27 | 28000315 | AGG DITCH CHECKS | 9 | TON | $210.00 | $250.00 | $225.00 | |
| 28 | 28000400 | PERIMETER EROS BAR | 3,508 | FOOT | $2.85 | $1.65 | $3.05 | |
| 29 | 28000500 | INLET & PIPE PROTECT | 11 | EACH | $110.00 | $150.00 | $117.50 | |
| 30 | 28100705 | STONE DUMP RIP CL A3 | 88 | SQ YD | $63.00 | $20.00 | $69.35 | |
| 31 | 28200200 | FILTER FABRIC | 88 | SQ YD | $4.00 | $3.50 | $23.20 | |
| 32 | 35101600 | AGG BASE CSE B 4 | 8,333 | SQ YD | $5.00 | $26.00 | $11.00 | |
| 33 | 40600275 | BIT MATLS PR CT | 20,263 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 34 | 40600290 | BIT MATLS TACK CT | 591 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 35 | 40600990 | TEMPORARY RAMP | 246 | SQ YD | $13.00 | $12.75 | $25.20 | |
| 36 | 40604000 | HMA SC IL-9.5FG C N50 | 1,082 | TON | $112.00 | $109.75 | $133.40 | |
| 37 | 40800050 | INCIDENTAL HMA SURF | 85 | TON | $142.00 | $138.75 | $188.65 | |
| 38 | 42000400 | PCC PVT 9 | 347 | SQ YD | $93.00 | $95.00 | $101.40 | |
| 39 | 42400200 | PC CONC SIDEWALK 5 | 648 | SQ FT | $18.00 | $11.50 | $10.40 | |
| 40 | 42400800 | DETECTABLE WARNINGS | 131.2 | SQ FT | $30.00 | $27.00 | $35.15 | |
| 41 | 44000100 | PAVEMENT REM | 315 | SQ YD | $4.00 | $23.00 | $16.05 | |
| 42 | 44000157 | HMA SURF REM 2 | 704 | SQ YD | $14.00 | $11.50 | $16.55 | |
| 43 | 44000500 | COMB CURB GUTTER REM | 236 | FOOT | $8.00 | $6.00 | $26.82 | |
| 44 | 54213669 | PRC FLAR END SEC 24 | 1 | EACH | $1,700.00 | $1,350.00 | $1,260.00 | |
| 45 | 54213675 | PRC FLAR END SEC 30 | 1 | EACH | $2,000.00 | $1,665.00 | $1,515.00 | |
| 46 | 54214515 | PRC FL END S EQ RS 30 | 3 | EACH | $2,300.00 | $1,540.00 | $1,995.00 | |
| 47 | 54248510 | CONCRETE COLLAR | 4 | CU YD | $500.00 | $875.00 | $497.00 | |
| 48 | 550A0120 | STORM SEW CL A 1 24 | 72 | FOOT | $130.00 | $108.00 | $110.00 | |
| 49 | 550A0140 | STORM SEW CL A 1 30 | 80 | FOOT | $145.00 | $120.00 | $155.00 | |
| 50 | 550A4300 | SS CL A 1 EQRS 30 | 436 | FOOT | $180.00 | $195.00 | $153.00 | |
| 51 | 55100900 | STORM SEWER REM 18 | 8 | FOOT | $30.00 | $9.00 | $69.50 | |
| 52 | 55101200 | STORM SEWER REM 24 | 74 | FOOT | $30.00 | $11.00 | $34.60 | |
| 53 | 55101400 | STORM SEWER REM 30 | 48 | FOOT | $30.00 | $12.00 | $38.75 | |
| 54 | 60100060 | CONC HDWL FOR P DRAIN | 6 | EACH | $650.00 | $450.00 | $615.00 | |
| 55 | 60224005 | MAN TA 6 DIA T8G | 2 | EACH | $6,600.00 | $6,200.00 | $6,465.00 | |
| 56 | 60260100 | INLETS ADJUST | 1 | EACH | $1,000.00 | $1,050.00 | $652.00 | |
| 57 | 60262700 | INLETS RECONST | 2 | EACH | $1,500.00 | $2,000.00 | $1,755.00 | |
| 58 | 60605000 | COMB CC&G TB6.24 | 173 | FOOT | $50.00 | $43.50 | $50.75 | |
| 59 | 60920012 | PIPE CULV CLEANED 12 | 365 | FOOT | $12.00 | $4.00 | $4.25 | |
| 60 | 60920018 | PIPE CULV CLEANED 18 | 76 | FOOT | $14.00 | $6.00 | $6.40 | |
| 61 | 60920030 | PIPE CULV CLEANED 30 | 470 | FOOT | $18.00 | $10.00 | $10.70 | |
| 62 | 63500105 | DELINEATORS | 22 | EACH | $86.00 | $85.00 | $90.80 | |
| 63 | 64200116 | SHOULDER RUM STRIP 16 | 1,750 | FOOT | $8.00 | $6.00 | $1.40 | |
| 64 | 67100100 | MOBILIZATION | 1 | L SUM | $40,000.00 | $56,500.00 | $31,310.00 | |
| 65 | 72000100 | SIGN PANEL T1 | 61 | SQ FT | $35.00 | $35.00 | $37.40 | |
| 66 | 72900100 | METAL POST TY A | 154 | FOOT | $16.00 | $16.00 | $17.10 | |
| 67 | 72900200 | METAL POST TY B | 44 | FOOT | $17.00 | $17.00 | $18.15 | |
| 68 | 78000200 | THPL PVT MK LINE 4 | 1,552 | FOOT | $2.00 | $2.00 | $2.15 | |
| 69 | 78000600 | THPL PVT MK LINE 12 | 20 | FOOT | $6.00 | $6.00 | $6.40 | |
| 70 | 78001100 | PT PVT MK LTRS & SYMB | 15.6 | SQ FT | $5.50 | $5.40 | $5.75 | |
| 71 | 78001110 | PAINT PVT MK LINE 4 | 171 | FOOT | $1.00 | $0.9000 | $0.9500 | |
| 72 | 78001130 | PAINT PVT MK LINE 6 | 511 | FOOT | $1.40 | $1.35 | $1.45 | |
| 73 | 78001140 | PAINT PVT MK LINE 8 | 37 | FOOT | $2.00 | $1.80 | $1.90 | |
| 74 | 78001150 | PAINT PVT MK LINE 12 | 1,351 | FOOT | $3.00 | $2.70 | $2.90 | |
| 75 | 78001180 | PAINT PVT MK LINE 24 | 128 | FOOT | $5.50 | $5.40 | $5.75 | |
| 76 | 78300201 | PAVMT MRKG REM GRIND | 100 | SQ FT | $5.00 | $5.00 | $5.35 | |
| 77 | 81028360 | UNDRGRD C PVC 2 1/2 | 120 | FOOT | $37.00 | $35.00 | $37.05 | |
| 78 | 81400700 | HANDHOLE PCC | 8 | EACH | $4,400.00 | $4,145.00 | $4,430.00 |