IDOT Jobs

All dates · 165 jobs · — Sign up free
★ My Jobs

Filtered by: County: Peoria Clear all

165 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 10, 2023 68H56 PeoriaDistrict 4 Replace traffic signal mast arm at IL 8/ IL 116 (MacArthur Hwy.) and Washington St. in Peoria. — Rejected Nov 26 New Laser Electric, Inc. $369,353 ·
Apr 28, 2023 68F26 PeoriaDistrict 4 Shoulder reconstruction and slope stabilization along US 24, 0.7 mile North of IL 9 in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $323,800 ·
Apr 28, 2023 68F79 PeoriaDistrict 4 1.3 miles of resurfacing with ADA improvements on IL 29 from N. of Truitt Avenue to S. of Cloverdale Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $2,972,756 ·
Apr 28, 2023 68H57 PeoriaDistrict 4 Installation of fiber optic cable within existing conduit along US 150 (War Memorial Drive) from IL 29 interchange to Koerner/Trigger Road in Peoria. — Executed Nov 26 New Oberlander Electric Co. $437,500 ·
Jun 16, 2023 68862 PeoriaDistrict 4 This is a bridge replacement project on IL 8 over the West Fork of Kickapoo Creek, 0.5 mile East of Oak Hill in Peoria County. — Executed Nov 26 New Stark Excavating, Inc. $3,713,452 ·
Jun 16, 2023 68H11 PeoriaDistrict 4 Pavement widening for WB left-turn lane, resurfacing, and drainage improvements at the intersection of IL 116 and Cameron Lane in Peoria County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,488,251 ·
Jun 16, 2023 68H36 PeoriaDistrict 4 Riprap for scour countermeasures at 1-74 over Kickapoo Creek and Swab Run; IL 91 over Kickapoo Creek. — Executed Nov 26 New Stark Excavating, Inc. $448,580 ·
Jun 16, 2023 68H55 FultonPeoriaDistrict 4 Remove and replace traffic signal mast arms and posts at Ash and Vine Streets along North Main Street in Canton and at Adams and Spring Streets in Peoria in Fulton and Peoria Counties. — Executed Nov 26 New Oberlander Electric Co. $672,500 ·
Jun 16, 2023 68H63 PeoriaDistrict 4 Expansion joints, patching, and, substructure repairs to S.N. 072-0149, IL 6 ramp overpass, west of IL 29. — Executed Nov 26 New Stark Excavating, Inc. $559,300 ·
Jun 16, 2023 68H64 PeoriaDistrict 4 Longitudinal Joint Repair on IL 116 from Route 9 to Kingston Mines. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $496,645 ·
Jun 16, 2023 68H67 PeoriaDistrict 4 PCC and HMA Pavement Resurfacing of D4 Traffic Maintenance Yard. — Executed Nov 26 New Knapp Concrete Contractors, Inc. $408,258 ·
Jun 16, 2023 68H70 PeoriaDistrict 4 3.75 miles, HMA Partial Depth Patching. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $411,540 ·
Aug 4, 2023 68H72 PeoriaDistrict 4 Partial depth HMA patching and longitudinal joint repair. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $570,899 ·
Sep 22, 2023 68886 PeoriaDistrict 4 Replace structure 072-0126 carrying Airport Road over 1-474, 0.5 miles NE of the Greater Peoria Airport. — Executed Nov 26 New Stark Excavating, Inc. $9,467,746 ·
Sep 22, 2023 68H76 PeoriaDistrict 4 Replacement of pedestrian push buttons with APS push buttons at various locations in Peoria County. — Executed Nov 26 New Laser Electric, Inc. $1,708,934 ·
Sep 22, 2023 89767 PeoriaDistrict 4 Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic, from Walnumt Street to Fayette Street in Peoria. — Executed Nov 26 New Otto Baum Company, Inc. $14,887,600 ·
Nov 17, 2023 89815 PeoriaDistrict 4 Structure rehabilitation with replacement of approach slabs, bridge deck, parapets, beams, expansion joints, bearings, concrete slope walls. Also included will be PCC pavement with curb and gutter, and storm sewers on Maxwell Road over the Union Pacific Railroad, 0.2 miles south of IL 116. — Executed Nov 26 New Stark Excavating, Inc. $4,569,990 ·
Jan 19, 2024 68D48 KnoxPeoriaDistrict 4 New bridge deck on SN 072-0032 carrying IL 78 over I-74, 4.5 miles west of Brimfield, deck replacement and miscellaneous repairs to SN 048-0035 carrying CH 18 over I-74, 3 miles east of Spoon River. — Executed Nov 26 New Stark Excavating, Inc. $4,407,159 ·
Jan 19, 2024 68H68 PeoriaDistrict 4 2.8 Miles of resurfacing and chip seal on Lincoln Ave. and Howett St. from Griswold St. to Adams St. in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,098,547 ·
Mar 8, 2024 68H80 PeoriaDistrict 4 Replace bearings at abutment and slope wall repairs on Thousand Dollar Road bridge over I-74. — Executed Nov 26 New William Charles Construction Company, LLC $115,791 ·
Mar 8, 2024 68H87 PeoriaDistrict 4 1.1 miles partial depth patching and longitudinal repair. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $698,034 ·
Mar 8, 2024 68H89 PeoriaDistrict 4 Landscaping along I-74 from Ellis St in Peoria to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $302,120 ·
Mar 8, 2024 89814 PeoriaDistrict 4 HMA resurfacing with pavement markings on Adams Street from US 24 to Franklin Avenue in Bartonville. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $694,399 ·
Mar 8, 2024 89836 PeoriaDistrict 4 Replace PPC deck beams, HMA overlay of approach, shoulder and guardrail replacement on Duncan Road over a tributary to the Spoon River, 2.5 miles north of IL 90 — Executed Nov 26 New Stark Excavating, Inc. $1,002,171 ·
Apr 26, 2024 68880 PeoriaDistrict 4 Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR. — Executed Nov 26 New Stark Excavating, Inc. $22,989,697 ·
Apr 26, 2024 68H83 PeoriaDistrict 4 Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd. — Executed Nov 26 New Illinois Civil Contractors, Inc. $138,627 ·
Apr 26, 2024 68H85 PeoriaDistrict 4 Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $324,600 ·
Apr 26, 2024 68H86 KnoxPeoriaDistrict 4 Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. — Executed Nov 26 New Stark Excavating, Inc. $834,893 ·
Apr 26, 2024 68J05 PeoriaDistrict 4 Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County. — Executed Nov 26 New Oberlander Electric Co. $291,000 ·
Apr 26, 2024 89831 PeoriaDistrict 4 Construct 4" wide HMA Shoulders with Rumble Strips and pavement markings on Smithville Road to Lancaster Road. — Executed Nov 26 New Advanced Asphalt Company $873,700 ·
Apr 26, 2024 89835 PeoriaDistrict 4 Reconstruct the intersecton of Pioneer Parkway and University Street in Peoria. — Executed Nov 26 New Gensini Excavating, Inc. $7,079,330 ·
Jun 14, 2024 68J07 PeoriaDistrict 4 PCC island and median replacement, 1/4 mile HMA mill and overlay. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $766,039 ·
Jun 14, 2024 68J24 PeoriaTazewellDistrict 4 D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. — Executed Nov 26 New Laser Electric, Inc. $516,745 ·
Nov 8, 2024 68D84 PeoriaDistrict 4 Bridge replacements to SN 072-0259 (EB) and SN 072-0258 (WB) carrying Interstate 74 (I-74) over County Highway 69 (CH 69) in Peoria County. — Executed Nov 26 New Stark Excavating, Inc. $10,741,237 ·
Nov 8, 2024 89816 PeoriaDistrict 4 Pavement reconstruction, and the construction of a multi-use path on Maxwell Road from Middle Road to south of Fauber Road. — Executed Nov 26 New Gensini Excavating, Inc. $7,099,475 ·
Jan 17, 2025 68J38 PeoriaDistrict 4 Landscaping maintenance and installation along I-74 from Ellis St. to Illinois River in Peoria. Net length 7,286 ft. — Executed Nov 25 New JIMAX Landscape LLC $307,381 ·
Jan 17, 2025 89865 PeoriaDistrict 4 Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe. — Executed Nov 25 New Advanced Asphalt Company $473,305 ·
Mar 7, 2025 68J19 MarshallPeoriaWoodfordDistrict 4 Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties. — Executed Nov 25 New Denler, Inc. $858,085 ·
Apr 25, 2025 68J18 PeoriaDistrict 4 Resurfacing of US24/IL 9 from Kingston Mines to W of IL 9 (E). 5.78 miles. — Executed Nov 25 New Advanced Asphalt Company $9,772,668 ·
Apr 25, 2025 68K08 PeoriaDistrict 4 Replacing natural gas to electric generator along with concrete pad at Operations Peoria West Yard. — Executed Nov 25 New Laser Electric, Inc. $189,900 ·
Jun 13, 2025 68J80 PeoriaDistrict 4 Removal and replacement of traffic signal mast arms at US 150 (War Memorial Drive) and Allen Rd/Charter Oak Rd in Peoria. — Executed Nov 25 New Oberlander Electric Co. $239,436 ·
Jun 13, 2025 89869 PeoriaDistrict 4 Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $405,578 ·
Aug 1, 2025 68898 PeoriaDistrict 4 Bridge replacement of structure carrying IL 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek. — Executed Nov 25 New ICC Group Inc. $23,160,000 ·
Aug 1, 2025 68B70 PeoriaDistrict 4 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria. — Executed Nov 25 New Otto Baum Company, Inc. $1,750,000 ·
Sep 19, 2025 68J62 PeoriaDistrict 4 Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,699,505 ·
Sep 19, 2025 68K24 PeoriaDistrict 4 Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. — Executed Nov 25 New Laser Electric, Inc. $1,766,478 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Nov 7, 2025 89872 PeoriaDistrict 4 Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer. — Executed Nov 25 New Otto Baum Company, Inc. $5,897,500 ·
Jan 16, 2026 68K52 PeoriaDistrict 4 1.38 miles of landscaping maintenance and installation along I-74 from Ellis St to the Illinois River. — Executed Nov 25 New JIMAX Landscape LLC $271,496 ·
Jan 16, 2026 89873 PeoriaDistrict 4 Construct a cast-in-place double barrel 10.5' x 10' PCC box culvert to carry Akron Road over a branch of Kickapoo Creek. Includes HMA paving, and landscape. — Executed Nov 25 New Otto Baum Company, Inc. $898,500 ·
Feb 27, 2026 68474 PeoriaDistrict 4 Resurfacing IL 6 from 0.7 mile north of Hoerr's Pond to south of I-74 in Peoria County. 4.2 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $25,863,073 ·
Feb 27, 2026 68J46 PeoriaDistrict 4 0.24 mile intersection improvement, Extended EP US 150 left-turn lane, widening for addition of SB right-turn lane, and change left-turn signal phasing from protected/permissive to protected only at the US 150 and West Willow Knolls Dr. intersection in Peoria County. — Executed Nov 25 New Otto Baum Company, Inc. $749,500 ·
Feb 27, 2026 68J51 PeoriaDistrict 4 316' bridge preservation project at SN 072-0169 carrying IL 8 (Southport Rd) over UPRR, 0.2 miles east of Reservoir Blvd in Peoria County. — Executed Nov 25 New Stark Excavating, Inc. $878,313 ·
Feb 27, 2026 68J57 PeoriaDistrict 4 7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S), north of Dunlap; and on IL 90 from the IL Rte 90/IL Rte 91 Junction (E) to IL Rte 40; and on SN 072-0035 carrying IL 90 over Kickapoo Creek Tributary. — Executed Nov 25 New Advanced Asphalt Company $5,129,210 ·
Feb 27, 2026 68K15 PeoriaDistrict 4 6.47 miles of resurfacing on IL 78 from west of US 150 to south of IL 8 in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,624,569 ·
Feb 27, 2026 68K16 PeoriaDistrict 4 3.53 miles of milling and resurfacing and all related collateral work along US Route 150 and IL Route 78 from 0.1 mile north of North Junction Illinois Route 78/US Route 150 to 0.1 mile north of Interstate 74 in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,332,964 ·
Apr 24, 2026 68J88 PeoriaDistrict 4 3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor Rd to I-474 in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $1,996,962 ·
Apr 24, 2026 68J89 PeoriaDistrict 4 6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Taylor Rd in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $4,472,093 ·
Jun 12, 2026 68C93 PeoriaDistrict 4 Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $10,996,119 ·
Jun 12, 2026 68J56 PeoriaDistrict 4 Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,771,058 ·
Jun 12, 2026 68K85 PeoriaTazewellWarrenDistrict 4 Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. — Executed Nov 25 New Oberlander Electric Co. $790,676 ·
Jun 12, 2026 68K93 PeoriaTazewellDistrict 4 Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. — Executed Nov 25 New Oberlander Electric Co. $1,451,503 ·
Jul 31, 2026 68L01 PeoriaDistrict 4 HMA patching and resurfacing of the intersection at_ IL91/Alta Rd in Peoria. Approximately 0.303 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $892,489 ·
Jul 31, 2026 68L02 PeoriaDistrict 4 HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $253,825 ·
Sep 18, 2026 68E86 PeoriaDistrict 4 Bridge replacement to SN 072-0123 at Closen Rd over I-474 in Bellevue. — Executed Nov 25 New Stark Excavating, Inc. $4,389,144 ·
101–165 of 165‹ Prev

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.