| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 61E36 | McHenryDistrict 1 | Resurfacing Ringwood Road from Spring Grove Road to IL 120, and Barnard Mill Road from Ringwood Road to Illinois Route 31 in the Village of Ringwood. | — | Executed | Curran Contracting Company $1,610,135 · | ||
| Jan 19, 2018 | 62C34 | McHenryDistrict 1 | Intersection improvement on IL 47 at O'Brien/Vanderkarr Road and Thayer Road between the City of Woodstock and the village of Hebron. | — | Executed | Curran Contracting Company $2,047,474 · | ||
| Mar 9, 2018 | 61D29 | McHenryDistrict 1 | Remove two bridges, and the construction of a single bridge to carry Deerpass Road over the north branch of the Kishwaukee River, 0.7 miles north of Illinois Route 176. | — | Executed | Dunnet Bay Construction Company $3,789,351 · | ||
| Mar 9, 2018 | 61E23 | McHenryDistrict 1 | Replace bridge carrying Oak Grove Road over drainage ditch, .7 mile southwest of US 14. | — | Executed | Alliance Contractors, Inc. $491,679 · | ||
| Mar 9, 2018 | 61E49 | McHenryDistrict 1 | Replace the bridge carrying Main Street over Crystal Creek in the Village of Algonquin. | — | Executed | Martam Construction Incorporated $2,482,796 · | ||
| Apr 27, 2018 | 61E34 | McHenryDistrict 1 | Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry. | — | Executed | Lorig Construction Company $2,551,352 · | ||
| Apr 27, 2018 | 62B94 | McHenryDistrict 1 | Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland. | — | Executed | Phoenix Corporation of the Quad Cities $188,777 · | ||
| Apr 27, 2018 | 62D74 | McHenryDistrict 1 | HMA resurfacing along IL 176 in the city of Marengo. | — | Executed | Peter Baker & Son Co. $2,367,298 · | ||
| Apr 27, 2018 | 62D75 | McHenryDistrict 1 | Resurfacing and pedestrian ramps on IL 47 in the City of Woodstock. | — | Executed | Peter Baker & Son Co. $927,057 · | ||
| Jun 15, 2018 | 60T01 | McHenryDistrict 1 | Convert intersection of US 20 and Harmony Road to a roundabout. | — | Executed | Berger Excavating Contractors, Inc. $5,110,204 · | ||
| Jun 15, 2018 | 61E53 | McHenryDistrict 1 | Pavement widening, reconstruction and resurfacing, storm sewers, ADA sidewalks, curb and gutter, box culvert construction, pedestrian underpass and path, retaining walls, traffic signal installation and modernization, lighting, and pavement markings on FAP 336 (Randall Road) from Harnish Drive to north of Polaris Drive/Alcorn Lane and on Algonquin Road from Harvest Gate/Talaga Drive easterly to east of Crystal Lake Avenue. Project is located in the villages of Lake in the Hills and Algonquin. | — | Executed | Plote Construction, Inc. $45,891,419 · | ||
| Jun 15, 2018 | 62C35 | CookMcHenryDistrict 1 | Light tower removal and replacement, and installation of new light towers at various locations. | — | Rejected | Hecker and Company, Inc. $2,125,740 · | ||
| Jun 15, 2018 | 62C84 | McHenryDistrict 1 | Resurfacing and pedestrian improvements on IL 23 in the City of Marengo. | — | Executed | Peter Baker & Son Co. $7,663,587 · | ||
| Aug 3, 2018 | 60Y22 | LakeMcHenryDistrict 1 | Intersection improvement with retaining wall and traffic signal modernization on IL 176 at Roberts Road in Island Lake. | — | Executed | Alliance Contractors, Inc. $1,138,109 · | ||
| Nov 9, 2018 | 60T13 | McHenryDistrict 1 | Channelization and traffic signal installation at the intersection of IL Route 173 and Wilmot Road. | — | Executed | Campanella and Sons, Inc. $1,983,425 · | ||
| Jan 18, 2019 | 61F08 | McHenryDistrict 1 | Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176. | — | Executed | Civil Constructors, Inc. $1,671,611 · | ||
| Jan 18, 2019 | 61F23 | McHenryDistrict 1 | Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake. | — | Executed | Curran Contracting Company $1,193,351 · | ||
| Jan 18, 2019 | 61F27 | McHenryDistrict 1 | Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47. | — | Executed | Dunnet Bay Construction Company $717,499 · | ||
| Jan 18, 2019 | 61F42 | McHenryDistrict 1 | Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary. | — | Executed | Curran Contracting Company $1,758,945 · | ||
| Jan 18, 2019 | 62G87 | CookLakeMcHenryDistrict 1 | Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. | — | Executed | Eagle Painting & Maintenance Company, Inc. $302,850 · | ||
| Mar 8, 2019 | 62F35 | McHenryDistrict 1 | Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. | — | Executed | Sjostrom & Sons, Inc. $1,257,790 · | ||
| Mar 8, 2019 | 62G48 | McHenryDistrict 1 | Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. | — | Executed | Alliance Contractors, Inc. $1,033,397 · | ||
| Apr 26, 2019 | 62H75 | McHenryDistrict 1 | 5.7 miles of ultra-thin bonded wearing surface on IL 31 from US 31 from US 12 to Johnsburg Road in the villages of Johnsburg, Richmond and Ringwood. | — | Executed | Curran Contracting Company $1,236,049 · | ||
| Apr 26, 2019 | 62H76 | McHenryDistrict 1 | 3 miles of ultra-thin bonded wearing course overlay on IL 176 from east of Smith Road to the Fox River in the City of Crystal Lake and Village of Prarie Grove. | — | Executed | Curran Contracting Company $702,491 · | ||
| Jun 14, 2019 | 46505 | DuPageMcHenryDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,500 · | ||
| Jun 14, 2019 | 61F78 | McHenryDistrict 1 | Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry. | — | Executed | Sumit Construction Co., Inc. $530,035 · | ||
| Jun 14, 2019 | 61F80 | McHenryDistrict 1 | Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry. | — | Executed | Curran Contracting Company $525,561 · | ||
| Jun 14, 2019 | 62C06 | McHenryDistrict 1 | Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake. | — | Executed | Plote Construction, Inc. $3,852,700 · | ||
| Jun 14, 2019 | 62D39 | McHenryDistrict 1 | Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township. | — | Executed | Alliance Contractors, Inc. $243,993 · | ||
| Jun 14, 2019 | 62H10 | LakeMcHenryDistrict 1 | Guardrail improvements at varous locations in McHenry and Lake Counties. | — | Executed | Kujo, Inc. $655,072 · | ||
| Jun 14, 2019 | 62J11 | CookKaneMcHenryDistrict 1 | Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. | — | Executed | J. A. Johnson Paving Company $1,797,700 · | ||
| Jun 14, 2019 | 62J14 | LakeMcHenryDistrict 1 | Intermittent resurfacing on various routes in Lake and McHenry counties. | — | Executed | J. A. Johnson Paving Company $1,964,700 · | ||
| Jul 12, 2019 | 62G29 | McHenryDistrict 1 | 1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron. | — | Executed | Curran Contracting Company $1,266,714 · | ||
| Jul 12, 2019 | 62H83 | McHenryDistrict 1 | 1.3 miles of standard overlay and ADA improvements on IL 31 from James R. Rakow Road to north of US 14 in Crystal Lake. | — | Executed | Arrow Road Construction Co. $1,542,056 · | ||
| Sep 20, 2019 | 61F58 | McHenryDistrict 1 | Reconstruct the intersection of Main Street at Crystal Lake Avenue in the city of Crystal Lake. | — | Executed | Copenhaver Construction, Inc. $4,028,645 · | ||
| Sep 20, 2019 | 61F98 | McHenryDistrict 1 | Sidewalk construction and culvert replacement on Main Street from Winn Road to West of Bilvin Street in the Village of Spring Grove. | — | Executed | Alliance Contractors, Inc. $443,926 · | ||
| Sep 20, 2019 | 62G56 | McHenryDistrict 1 | OVERLAY, NEW SHOULDERS AND MILLED RUMBLE STRIPS ON IL 31 FROM SHAMROCK LANE TO NORTH OF EDGEWOOD ROAD IN THE CITY OF MCHENRY AND VILLAGE OF PRAIRIE GROVE. | — | Executed | Peter Baker & Son Co. $988,722 · | ||
| Nov 8, 2019 | 61F99 | McHenryDistrict 1 | Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. | — | Rejected | Curran Contracting Company $1,294,604 · | ||
| Nov 8, 2019 | 62J37 | McHenryDistrict 1 | Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) | — | Executed | Alliance Contractors, Inc. $148,753 · | ||
| Jan 17, 2020 | 62G27 | McHenryDistrict 1 | 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. | — | Executed | Payne & Dolan, Inc. $1,469,929 · | ||
| Jan 17, 2020 | 62K14 | McHenryDistrict 1 | Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. | — | Executed | Martam Construction Incorporated $1,184,616 · | ||
| Mar 6, 2020 | 62F91 | McHenryDistrict 1 | Overlay Smart, ADA improvements, and milled rumble strips on IL 120 from IL 47 to Martin Rd. | — | Executed | Curran Contracting Company $3,512,337 · | ||
| Apr 24, 2020 | 61G43 | McHenryDistrict 1 | Construction of a multi-use path adjacent to Reed Road from Vine Street to IL 47 in the Village of Huntley. | — | Executed | Martam Construction Incorporated $239,749 · | ||
| Apr 24, 2020 | 62D36 | McHenryDistrict 1 | Project 14,023 LF. Pavement widening, pavement reconstruction, construction of a turnabout, curb and gutter, sidewalk, proposed drainage. replacement of a box culvert with three box culverts and two retaining walls. | — | Executed | Curran Contracting Company $9,727,727 · | ||
| Apr 24, 2020 | 62K57 | McHenryDistrict 1 | Light tower and foundation removal, install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at US 14 at IL 31 in Crystal Lake. | — | Executed | Hecker and Company, Inc. $679,721 · | ||
| Jun 12, 2020 | 61G63 | McHenryDistrict 1 | Sidewalk and pedestrian crossing improvements on West Main Street from Cary-Algonquin Road to Wulff street in Cary | — | Executed | A Lamp Concrete Contractors, Inc. $162,319 · | ||
| Jul 31, 2020 | 46552 | McHenryDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $308,371 · | ||
| Sep 18, 2020 | 62M66 | McHenryDistrict 1 | Building Demolition at 3 locations. Location No. 1: 2103 N. Woodlawn Parkway; Location No. 2 2107 N. Woodlawn Parkway; Locaton No. 3 W. side of IL 31, approximately 2,250-ft N. of McCullom Lake. | — | Executed | MYS, Incorporated $360,168 · | ||
| Nov 6, 2020 | 61G72 | McHenryDistrict 1 | Sidewalk improvements including ADA ramp installation along Chapel Hill Road from Reed Avenue to Fairview Avenue in Johnsburg. | — | Executed | A Lamp Concrete Contractors, Inc. $149,541 · | ||
| Nov 6, 2020 | 62A80 | McHenryDistrict 1 | (0.45 miles) the type of work is Bridge Replacement in McHenry County, over Kishwaukee River: SN 056-0025. | — | Executed | Plote Construction, Inc. $7,441,279 · | ||
| Nov 6, 2020 | 62J35 | McHenryDistrict 1 | Bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary (0.09-Mile) Improvement of US 14 over Fox River consists of bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary. | — | Executed | Martam Construction Incorporated $813,564 · | ||
| Nov 6, 2020 | 62N02 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Active | Illinois Central Sweeping LLC $495,000 · | ||
| Jan 15, 2021 | 62K93 | LakeMcHenryDistrict 1 | ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake. | — | Executed | Triggi Construction, Inc. $414,718 · | ||
| Jan 15, 2021 | 62L38 | LakeMcHenryDistrict 1 | ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda. | — | Executed | Triggi Construction, Inc. $315,664 · | ||
| Jan 15, 2021 | 62M91 | LakeMcHenryDistrict 1 | Cleaning and painting existing steel structures at 5 locations. 1st location, US 12 over Pistakee Lake (SN 049-0019). 2nd location, IL 43 over IL 120 (SN 049-0111). 3rd location, Metra RR over Person Rd. (SN 049-0127). 4th location, US 12 over Nippersink Lake (SN 049-0167). 5th location, US 14 over UP RR and McComb St. (SN 056-0007). | — | Executed | ERA-Valdivia Contractors, Inc. $949,114 · | ||
| Mar 5, 2021 | 61G60 | McHenryDistrict 1 | Construction of bicycle facilities, pavement reconstruction, traffic signal improvements, roadway lighting, streetscape items, construction of a roundabout, and pavement markings. Improvement begins on Harrison Street at the McHenry County Conservation District Prairie Trail and extends north to Park Street, westerly to Riverview Drive, south to Main Street, then north to the existing multi-use path at IL 31 in Algonquin. | — | Executed | Martam Construction Incorporated $6,342,937 · | ||
| Mar 5, 2021 | 61G93 | McHenryDistrict 1 | Construction of a bike path from east of Illinois Route 31 into the park, in the Village of Cary. | — | Executed | Campanella and Sons, Inc. $800,037 · | ||
| Mar 5, 2021 | 62L53 | McHenryDistrict 1 | (1.1-Mile) SMART resurfacing and ADA improvements on US 12 (Main Street) from Wisconsin Street to IL 173 (Kenosha Street) in the Village of Richmond. | — | Executed | J. A. Johnson Paving Company $493,301 · | ||
| Apr 23, 2021 | 61G94 | McHenryDistrict 1 | Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road. | — | Executed | Lorig Construction Company $1,545,703 · | ||
| Apr 23, 2021 | 61H03 | McHenryDistrict 1 | Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood. | — | Executed | Geske and Sons, Inc. $510,590 · | ||
| Apr 23, 2021 | 61H04 | McHenryDistrict 1 | Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove | — | Executed | Geske and Sons, Inc. $367,518 · | ||
| Jun 11, 2021 | 46571 | McHenryDistrict 1 | Removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, an This work shall consist of removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limit shown. | — | Executed | Superior Road Striping, Inc. $282,443 · | ||
| Jun 11, 2021 | 46574 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $423,000 · | ||
| Jun 11, 2021 | 60T15 | McHenryDistrict 1 | Intersection Improvement (channelization, traffic signal installation). Includes left and right turn lanes, re-alignment of Wright Rd, re-alignment of leg of Nish Rd and building demolition. Location: Intersection of IL 176 and Nish Road in unincorporated Nunda Township in McHenry County. | — | Executed | Campanella and Sons, Inc. $2,737,521 · | ||
| Jun 11, 2021 | 62L65 | McHenryDistrict 1 | Smart Overlay, Class D patching. This improvement of IL 47 begins 800 ft north of Ware Rd. and proceeds approximately 47350.5 ft (8.96 miles) in a northerly direction to IL Rte. 173 in the Village of Hebron and Township of Greenwood and Hebron. | — | Executed | Peter Baker & Son Co. $2,128,510 · | ||
| Jun 11, 2021 | 62N90 | CookMcHenryDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships. | — | Executed | Capital Industrial Services $683,300 · | ||
| Sep 17, 2021 | 61H21 | McHenryDistrict 1 | Resurfacing Reed Road from the west village limits to Lakewood Road in the Village of Lake in the Hills. | — | Executed | Plote Construction, Inc. $125,400 · | ||
| Sep 17, 2021 | 62G35 | McHenryDistrict 1 | (7.74-Mile) Pavement widening and resurfacing to provide left turn lanes at 8 intersections, replacement of 3 culverts, 5 culverts repair, widening 5 culverts to accommodate proposed intersections, guardrails, regrading, shoulder improvements and rumblestrips along IL 176 from Deerpass Rd -Dean St in the City of Marengo. | — | Executed | William Charles Construction Company, LLC $8,277,010 · | ||
| Sep 17, 2021 | 62P26 | McHenryDistrict 1 | (16.3-Mile) Pavement surface patching (2-in mill and fill / intermittent resurfacing) improvement. Includes affected PMKs restoration. Location: IL 173 (Maple Ave) from Alden Rd to Lake Co Line in the Villages Alden Hebron and Richmond in McHenry County. | — | Executed | Payne & Dolan, Inc. $597,319 · | ||
| Nov 5, 2021 | 61H27 | McHenryDistrict 1 | Pavement widening and construction, curb and gutter, sidewalks, lighting, traffic signals, storm sewer and water main improvements on Main Street from IL 176 to the UP Railroad tracks, and on IL 176 from 2nd Street to Illinois Street in Crystal Lake. | — | Executed | Pir Tano Construction Company, Inc. $4,564,372 · | ||
| Nov 5, 2021 | 62N46 | McHenryDistrict 1 | (1.11-mile) ultra-thin bonded wearing course along US 14 from Crowley Road to Oak Grove Road. Located in the City of Harvard and unincorporated McHenry Co. | — | Executed | Peter Baker & Son Co. $322,358 · | ||
| Jan 21, 2022 | 61G01 | McHenryDistrict 1 | Reconstruct the intersection of Madison Street, South Street, and Lake Avenue into a roundabout in the City of Woodstock. | — | Executed | H. Linden & Sons Sewer and Water, Inc. $2,755,454 · | ||
| Jan 21, 2022 | 61H53 | McHenryDistrict 1 | Resurfacing Mason Hill Road from 650' west of Cherry Valley Road to Crystl Lake Road in Bull Valley. | — | Executed | Peter Baker & Son Co. $935,194 · | ||
| Jan 21, 2022 | 61H54 | McHenryDistrict 1 | Resurfacing Ringwood Road from the village limits north of McCullom Lake Road to a point 2,066 feet north of the village limits of Ringwood. | — | Executed | Curran Contracting Company $147,450 · | ||
| Jan 21, 2022 | 62N44 | McHenryDistrict 1 | (3.00-Mile) SMART overlay and ADA improvements on Virginia St/Northwest Hwy from Crystal Lake Av to Pingree Rd. located in the City of Crystal Lake. | — | Executed | Curran Contracting Company $3,474,967 · | ||
| Jan 21, 2022 | 62N56 | McHenryDistrict 1 | (1.79-Mile) SMART overlay along IL 31 from S of McCullom Lake Road to Johnsburg Road located in the City of McHenry and the Village of Johnsburg. | — | Executed | Peter Baker & Son Co. $1,824,329 · | ||
| Mar 11, 2022 | 61H50 | McHenryDistrict 1 | Modifications at eight intersections in Algonquin, Huntley, Lake in the Hills, Lakewood, and Spring Grove. | — | Executed | Home Towne Electric, Inc. $3,300,000 · | ||
| Mar 11, 2022 | 61H58 | McHenryDistrict 1 | Construction of a multi-use path adjacent to Winn Road, from English Prarie Road to North of Brentwood Drive in Spring Grove. | — | Executed | Maneval Construction Company, Inc. $164,150 · | ||
| Mar 11, 2022 | 62N45 | McHenryDistrict 1 | (5.91-Mile) SMART overlay along US 14 from Hughes/Hartland Rd to IL 47 including the installation of 2 dry wells at the intersection of Hughes/ Hartland Road and US 14 located in the City of Woodstock in McHenry County. | — | Executed | Plote Construction, Inc. $3,492,367 · | ||
| Apr 29, 2022 | 62P47 | CookLakeMcHenryDistrict 1 | Designed overlay resurfacing on County-Line Rd., beginning at E. of Haegers Bend Rd. and continuing in the easterly direction for approximately 23483 feet (4.44 miles) to 300 ft west of Hart Rd. located in the Village of Barrington Hills. | — | Executed | Plote Construction, Inc. $2,590,116 · | ||
| Apr 29, 2022 | 62R46 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties (299.5-Mile) The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Executed | Elgin Sweeping Services, Inc. $1,249,890 · | ||
| Jun 17, 2022 | 61H80 | McHenryDistrict 1 | Reconstruct Souwanas Trail from Oceola Street to Sanbloom Road, and the reconstruction of Schuett Street from Scott Street to Hubbard Street in Algonquin. | — | Rejected | Benchmark Construction Co., Inc. $8,448,000 · | ||
| Jul 15, 2022 | 62P74 | McHenryDistrict 1 | (2,260-Ft) Standard Overlay and ADA Improvements: HMA removal and resurfacing, Class D patching, curb ramps (ADA) improvements, PMK of FAP 525: U.S. 20 from Page Street to Locust Street, located in the City of Marengo in McHenry County. | — | Executed | Peter Baker & Son Co. $638,758 · | ||
| Nov 18, 2022 | 61J03 | McHenryDistrict 1 | Resurfacing and sidewalk construction on Green Street from IL 120 to Municipal Drive in McHenry | — | Executed | Peter Baker & Son Co. $1,163,337 · | ||
| Mar 10, 2023 | 61J29 | McHenryDistrict 1 | HMA surface removal and resurfacing, pavement patching, aggregate shoulders, and pavement markings along Pingree Road in Lake in the Hills. | — | Executed | Geske and Sons, Inc. $283,920 · | ||
| Mar 10, 2023 | 62R50 | McHenryDistrict 1 | Removal and replacement of culvert culvert at US 14 over Ditch (3 Miles South of State Line) located in the un (345-Ft) Proposed improvement consists of removal and replacement of culvert culvert at US 14 over Ditch (3 Miles South of State Line) located in the unincorporated Chemung Township in McHenry County. | — | Executed | Sjostrom & Sons, Inc. $1,004,302 · | ||
| Apr 28, 2023 | 61J51 | McHenryDistrict 1 | Traffic signal modernization, ADA improvements, and pavement markings on Walkup Road/Crystal Lake Road from Bull Valley to Hillside. | — | Executed | Home Towne Electric, Inc. $1,574,634 · | ||
| Jun 16, 2023 | 46622 | DuPageMcHenryDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | Precision Pavement Markings Inc. $787,650 · | ||
| Jun 16, 2023 | 46627 | McHenryDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed will be performed on various routes throughout McHenry County. | — | Executed | Superior Road Striping, Inc. $510,312 · | ||
| Jun 16, 2023 | 62T99 | McHenryDistrict 1 | Partial removal and extension of the culverts located on IL 173 (328 The proposed improvement consists of partial removal and extension of the culverts located on IL 173 (328.55-Ft) over Ditch (1.43 Mile, East of US 14) in Alden Township, and IL 176 (452.45-Ft) over Ditch (1.9 Mile East of IL 47) in the City of Crystal Lake, McHenry County. | — | Executed | Copenhaver Construction, Inc. $800,774 · | ||
| Aug 4, 2023 | 62T01 | McHenryDistrict 1 | (457-Ft) Bridge rehabilitation project and scope of work includes deck scarification, latex concrete overlay, joint replacement and approach slab and shoulders repair on IL Route 47 over Nippersink Creek in the City of Woodstock in McHenry County. | — | Executed | Areatha Construction Co., Inc. $769,506 · | ||
| Sep 22, 2023 | 61J68 | McHenryDistrict 1 | HMA Resurfacing with culvert replacement, and aggregate shoulders on Riverside Drive from Johnburtg Road to Running Brook Farm Boulevard in Johnsburg. | — | Rejected | Alliance Contractors, Inc. $2,849,871 · | ||
| Sep 22, 2023 | 62T64 | McHenryDistrict 1 | Crack routing, crack filling urethane PMK (7.92-Mile) FAP 324: US 14 / Division Street): Crack and Joint Sealing from North of IL 23 to Brink Street. Type of work consists of crack routing, crack filling urethane PMK. Net Length = 41,805-feet (7.92-miles) located within the City of Harvard and unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $4,282,507 · | ||
| Sep 22, 2023 | 62U22 | McHenryDistrict 1 | The complete removal of all buildings at 4 different sites This is a building demolition and site clean-up project and the work to be performed consists of the complete removal of all buildings at 4 different sites. There are (2) two single family residences, (1) one industrial building and (1) one car-wash. The buildings are located along IL Route 47 and IL Route 31 within McHenry County. | — | Executed | Lima Contractors $289,250 · | ||
| Nov 17, 2023 | 61J79 | McHenryDistrict 1 | Removal and replacement of strutures carrying Milstream Road over the Kishwaukee River and the South Branch of the Kishwaukee River. The proposed structures are three span, 27" PPC IL Beams with an 8" concrete deck on solid wall piers and integral abutments. Also included will be HMA resurfacing, HMA shoulders, guardrail, driveways, pavment markings, landscaping and other necessary work. | — | Executed | Dunnet Bay Construction Company $9,617,881 · | ||
| Nov 17, 2023 | 62H25 | McHenryDistrict 1 | Culvert removal and replacement of the structure located on IL 23 over Drainage Ditch (0 The proposed improvement consists of culvert removal and replacement of the structure located on IL 23 over Drainage Ditch (0.1 Mile N of IL 176) in the City of Marengo in McHenry County. Total gross length and net length = 164 FT ( 0.031 MI) | — | Executed | Herlihy Mid-Continent Company $1,178,350 · | ||
| Jan 19, 2024 | 61J96 | McHenryDistrict 1 | Resurfacing Bull Valley Road from Curran Road to Crystal Lake Road in McHenry. | — | Executed | Geske and Sons, Inc. $255,964 · | ||
| Jan 19, 2024 | 61J98 | McHenryDistrict 1 | HMA resurfacing with aggregate shoulders on Winn Road from IL 173 to Main Street in Spring Grove. | — | Executed | Payne & Dolan, Inc. $1,194,568 · | ||
| Jan 19, 2024 | 62U68 | KaneMcHenryDistrict 1 | Arterial routes sweeping in McHenry and Kane counties This contract consists of arterial routes sweeping in McHenry and Kane counties | — | Rejected | Central Sweeping of Illinois, LLC $1,476,500 · | ||
| Mar 8, 2024 | 61K14 | McHenryDistrict 1 | HMA resurfacing with patching, and aggregate shoulders on Diggins Street from Lawrence Road to Front Street in Harvard. | — | Executed | Geske and Sons, Inc. $521,549 · |
1–100 of 161Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.