Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 14, 2024 | 62U21 | CookDistrict 1 | Pavement marking and traffic signal modernization (1,356-Ft) This project consists of pavement marking and traffic signal modernization. The project is located in the Village of Western Springs and unincorporated Proviso Township, Cook County. | — | Active | John Burns Construction Company $2,249,775 · | ||
| Jun 14, 2024 | 62U83 | CookKaneDistrict 1 | 6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties. | — | Executed | Dunnet Bay Construction Company $27,446,572 · | ||
| Jun 14, 2024 | 62V20 | CookDistrict 1 | Pavement patching, hot-mix asphalt pavement resurfacing and overlay, pavement marking, electrical detection ra The length of the project is 1,269-Ft (0.24-Miles) This project consists of pavement patching, hot-mix asphalt pavement resurfacing and overlay, pavement marking, electrical detection ramp improvements at various locations along I-55 The project is in the City of Chicago and Hodgkins, Cook County. | — | Executed | Gallagher Asphalt Corporation $1,216,839 · | ||
| Jun 14, 2024 | 62V24 | CookDistrict 1 | Cleaning and painting existing steel structures at 2 locations This improvement consists of cleaning and painting existing steel structures at 2 locations. Location 1 is at the structure carrying Metra RR over I-57 (SN 016 -0068) in the Village of Calumet Park. Location 2 is at the structure carrying a Bike Path over I-57 (SN 016-0070) in the City of Chicago. All are located within Cook County. | — | Executed | Capital Industrial Services, LLC $1,483,300 · | ||
| Jun 14, 2024 | 62W18 | CookDistrict 1 | Trombone Mast Arm replacement and APS push button installation at various locations in District 1. | — | Executed | H & H Electric Co. $1,032,783 · | ||
| Jun 14, 2024 | 62W48 | CookDistrict 1 | (4,823-feet) Bridge Rehabilitation / Bikeway: rehabilitation and modification of SN 016-0194 and SN 016-0195. Widening of the existing west side concrete sidewalk for bikeway, bridge joints replacement/ repair, deck hydroscarification, repair and overlay with latex modified concrete, approach slabs and substructure repairs, median removal, guardrail, pavement markings and all incidental and collateral work necessary to complete the project. Located on IL 1 (Halsted Street) over IHB Railroad and | — | Executed | ICC Group Inc. $8,563,500 · | ||
| Jun 14, 2024 | 62W74 | CookDistrict 1 | Resurfacing and patching, pavement marking at various locations along I-290 The length of the project is 695 ft (0.131 miles). This project consists of resurfacing and patching, pavement marking at various locations along I-290. The project is located in the Village of Schaumburg, Cook County. | — | Executed | Mosley Construction 1, LLC $528,136 · | ||
| Aug 2, 2024 | 61K50 | CookDistrict 1 | Sidewalk construction, signage and parkway restoration on various routes in Country Club Hills. | — | Executed | |||
| Aug 2, 2024 | 61K55 | CookDistrict 1 | Resurfacing Hampton Avenue from Ogden Avenue to Hillgrove Avenue in Western Springs. | — | Executed | K-Five Construction Corporation $964,319 · | ||
| Aug 2, 2024 | 62K73 | CookDistrict 1 | (7.2-Mile) Bridge repair project on the outbound lanes of I-90 (Kennedy Expressway) from I-94 (Edens Expressway) to Hubbard Street in the City of Chicago in Cook County. The scope of work includes bridge deck overlay, joint repair, pavement patching, overhead sign replacement and ITS work. | — | Executed | Lorig Construction Company $45,726,357 · | ||
| Aug 2, 2024 | 62R82 | CookDistrict 1 | Installation of new fiber optic cable, conduit, PTZ cameras, network switches along four different corridors. Located within Village of Northlake, Broadview, Berwyn, Justice, Bridgeview, Westchester, and Burbank in Cook County. | — | Executed | H & H Electric Co. $2,236,800 · | ||
| Aug 2, 2024 | 62T49 | CookDistrict 1 | Bridge overlay and joint repair of Michigan Ave (276- Ft) The proposed improvement consists of bridge overlay and joint repair of Michigan Ave. located over I-55 (Steven-s Expressway) (SN 016-0184). The project is located in the City of Chicago. Cook County. | — | Executed | Martam Construction Incorporated $985,515 · | ||
| Aug 2, 2024 | 62U90 | CookDistrict 1 | Toll Plaza 31 Relocation Kennedy Express (I-90) to I-190 WB Ramp to Airport in Rosemont, Illinois | — | Executed | K-Five Construction Corporation $5,397,102 · | ||
| Sep 20, 2024 | 61K60 | CookDistrict 1 | HMA Resurfacing with ADA Ramps, lighting, streetscape improvements, and traffic signal modernization on Green Bay Road from Prairie Avenue to Poplar Avenue in Evanston. | — | Executed | Capitol Cement Co., Inc. $9,942,695 · | ||
| Sep 20, 2024 | 61K63 | CookDistrict 1 | Full Depth HMA reconstruction with storm sewers, box culvert replacement, curb and gutter, PCC sidewalks, multi-use path, ADA ramps, pavement markings, utility adjustments, and parkway restoration on Bernard Drive from Alington Heights Road to Lincoln Terrace in Buffalo Grove. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $8,284,395 · | ||
| Sep 20, 2024 | 61K70 | CookDistrict 1 | Resurfacing, shared-use path construction, storm sewers, lighting, traffic signals, and pavement markings on Shermer Road from Walters Avenue to Willow Road in Northbrook. | — | Executed | A Lamp Concrete Contractors, Inc. $4,974,255 · | ||
| Sep 20, 2024 | 61K72 | CookDistrict 1 | Construction of a shared-use path on 25th Avenue from 14th Street to Salt Creek Trail in Broadview. | — | Executed | R. W. Dunteman Company $2,917,399 · | ||
| Sep 20, 2024 | 62T06 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course and sidewalk ram This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Rosemont and City of Des Plaines in Cook County. (Project Length 7429 Foot, 1.4 Miles). | — | Executed | Builders Paving, LLC $2,415,595 · | ||
| Sep 20, 2024 | 62T11 | CookDistrict 1 | A SMART Overlay of the existing FAP 339 (IL-58 - Golf Road) from I-294 (Tri-State Tollway) to Lincoln Street a This improvement consists of a SMART Overlay of the existing FAP 339 (IL-58 - Golf Road) from I-294 (Tri-State Tollway) to Lincoln Street and a Designed Overlay of OR 1320 (Elk Blvd) from US 12/45 (Lee St/Mannheim Road) to Us 12 (Rand Road) in the City of Des Plaines and Villages of Morton and Niles in Cook County approximately 13,627 Feet (2.58 Mile) in length. | — | Executed | Builders Paving, LLC $3,867,808 · | ||
| Sep 20, 2024 | 62T37 | CookDistrict 1 | (335-Ft) Bridge Preservation Project. Work includes bridge deck scarification, repair, overlay, joints repair replacement and incidental and collateral work. Located on Oakton Street at Des Plaines River, just East of River Road, within the City of Des Plaines, in Cook County. | — | Executed | Martam Construction Incorporated $832,246 · | ||
| Sep 20, 2024 | 62T38 | CookDistrict 1 | (231-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at Devon Ave over North Branch Chicago River. This project is in the City of Chicago in Cook County. | — | Executed | Martam Construction Incorporated $668,421 · | ||
| Sep 20, 2024 | 62T94 | CookDistrict 1 | Culvert replacement at two locations, construction of a retaining wall, guardrail replacement, and constructio The proposed improvement consists of culvert replacement at two locations, construction of a retaining wall, guardrail replacement, and construction of paved shoulder located at 123rd Street over Mill Creek and West Branch of Mill Creek, Cook County. Gross length: 1130 Ft (0.214 Mi), Net length: 385 Ft (0.073 Mi) | — | Executed | D. Construction, Inc. $1,450,818 · | ||
| Sep 20, 2024 | 62V17 | CookLakeDistrict 1 | Project covers 14 miles along I-94 from Montrose Ave to Lake Cook Rd and 3 mile along US Route 41 from Lake Cook Rd to Park Ave. Improvements are within 8 separate cities and villages within Cook and Lake counties from Chicago to Highland Park. Project involves replacing the surveillance vehicle detection system, ramp metering system, 6 sign structures and installing wrong way detection system. Connection to fiberoptic system and network integration is also included. | — | Executed | Meade Inc. $9,281,773 · | ||
| Sep 20, 2024 | 62V99 | CookDistrict 1 | Maintenance Yard Resurfacing, Reconstruction, Curb and Gutter Replacement, and Parking Improvement in the Rodenburg Maintenance Yard located at 1480 Rodenburg Rd , Schaumburg IL in Cook County. | — | Executed | R. W. Dunteman Company $1,427,900 · | ||
| Sep 20, 2024 | 62W88 | CookDistrict 1 | A intersection improvement with pavement widening and resurfacing The length of the project is 2,203 ft (0.417 miles). This project consists of a intersection improvement with pavement widening and resurfacing. The project is in Unincorporated Cook County, Orland Park, Oak Forest and Palos Heights. | — | Executed | D. Construction, Inc. $743,320 · | ||
| Nov 8, 2024 | 60R50 | CookDistrict 1 | 5,158-Ft. (0.98 miles), This project includes intersection improvements, ADA improvements, pavement widening and resurfacing, drainage improvements, traffic signal work, lighting, street scape improvements, and sidewalk and shared-use path construction, at the intersection with US 12/20/45 (La Grange Road), City of Countryside, Cook County, IL. | — | Executed | |||
| Nov 8, 2024 | 61J90 | CookDistrict 1 | Pavement widening, resurfacing and traffic signal improvements on Irving Park Road at Old River Road in Schiller Park. | — | Executed | A Lamp Concrete Contractors, Inc. $4,279,092 · | ||
| Nov 8, 2024 | 61K21 | CookDistrict 1 | Replace existing culverts with two three-side precast concrete structures with HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, and storm sewers on Wellington Avenue and Leicester Road over Lake Cosman in Elk Grove Village. | — | Executed | Martam Construction Incorporated $4,310,271 · | ||
| Nov 8, 2024 | 61K48 | CookDistrict 1 | Full Depth HMA pavement with aggregate subgrade improvement, median construction, driveways, curb and gutter, sidewalks, ADA Ramps, drainage improvements, and traffic signal installation on 187th Streeyt from Science Road to Pleasant Drive in Glenwood. | — | Executed | D. Construction, Inc. $3,094,447 · | ||
| Nov 8, 2024 | 61K54 | CookDistrict 1 | Constrution of a shared-use path from the north side of Irvign Park Road to Lawrence Avenue in the City of Chicago and Schiller Park. | — | Executed | Martam Construction Incorporated $3,447,132 · | ||
| Nov 8, 2024 | 61K56 | CookDistrict 1 | Resurface Burlington Avenue from Central Avenue to Wolf Rd. in Western Springs. | — | Executed | A Lamp Concrete Contractors, Inc. $554,455 · | ||
| Nov 8, 2024 | 61K58 | CookDistrict 1 | Sidewalk construction on McDermott Drive from Wolf Road to the end of St. Charles road and on Morris Avenue from McDermott Dr. to St. Charles Rd. in Berkeley. | — | Executed | Triggi Construction, Inc. $341,626 · | ||
| Nov 8, 2024 | 61K59 | CookDistrict 1 | Sidewalk construction at various locations in Berkeley. | — | Executed | A Lamp Concrete Contractors, Inc. $1,464,176 · | ||
| Nov 8, 2024 | 61K69 | CookDistrict 1 | HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, pavement striping, parkway restoration, on 46th Street from Harlem Avenue to Oak Park Avenue in Forest View. | — | Executed | K-Five Construction Corporation $670,114 · | ||
| Nov 8, 2024 | 61K83 | CookDistrict 1 | Reconstruct Salem Drive from Schaumburg road to Weathersfield Way in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $2,379,003 · | ||
| Nov 8, 2024 | 62G18 | CookDistrict 1 | (3.11-Mile) Standard Overlay, ADA improvements, traffic signal modernization, shoulder widening, roadway pavement marking. The project is in the cities of Des Plaines and Park Ridge, Cook County. | — | Executed | K-Five Construction Corporation $5,291,877 · | ||
| Nov 8, 2024 | 62P92 | CookDistrict 1 | Curb ramps (ADA) improvements consists of sidewalk removal, combination concrete curb and gutter removal and r This project consists of curb ramps (ADA) improvements consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, pavement markings on Various Routes, at Various Locations in North Cook County in the Villages of Elk Grove, Mount Prospect, Wheeling, Arlington Heights, and the City of Prospect Heights in Cook County. | — | Executed | Acura Inc. $1,217,181 · | ||
| Nov 8, 2024 | 62P94 | CookDistrict 1 | Sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectab This is an ADA curb ramp installation project consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, accessible pedestrian signals and roadway signs, drainage structure adjustments, pavement markings. Located along various State routes in the City of Evanston and the Villages of Glencoe, Kenilworth, and Wilmette in Cook County. | — | Executed | Acura Inc. $979,267 · | ||
| Nov 8, 2024 | 62P98 | CookDistrict 1 | ADA Improvements: Removal and replacement of sidewalk, curb and gutter, minor traffic signal (APS) improvements. Located in southeast Leyden Township within the City of Northlake and the Villages of Franklin Park, Melrose Park and Schiller Park. | — | Executed | Acura Inc. $1,498,868 · | ||
| Nov 8, 2024 | 62R00 | CookDistrict 1 | Hot-mix asphalt surface removal and resurfacing, pavement patching, concrete curb and gutter removal and repla The project consists of hot-mix asphalt surface removal and resurfacing, pavement patching, concrete curb and gutter removal and replacement, ADA pedestrian ramp improvements, detector loop replacement and pavement marking. Improvements at various locations on IL 58 (Golf Rd.), Rand Rd., US 12 / 45 (Lee St. / Graceland Ave. / Mannheim Rd.) and Touhy Ave. in the city of Des Plaines. | — | Executed | Alliance Contractors, Inc. $1,688,085 · | ||
| Nov 8, 2024 | 62W03 | CookDistrict 1 | Parking Improvement, work includes existing HMA removal, installation of aggregate base, installation of new HMA surface course and minor collateral and incidental work. Location: Located at the District Bridge Maintenance Yard (1101 Biesterfield Rd), Elk Grove Village, in Cook County. | — | Executed | A Lamp Concrete Contractors, Inc. $1,055,604 · | ||
| Nov 8, 2024 | 62W30 | CookDistrict 1 | Improvements on this project include full superstructure replacement with galvanized steel beams and semi-integral abutment conversions of Structure No. (SN) 016-1018 carrying Euclid Avenue over IL 53. This project begins at a point on the centerline of FAU 1292 (Euclid Avenue) east of Hicks Road and extends west of Rohlwing Road. | — | Executed | Dunnet Bay Construction Company $10,802,029 · | ||
| Nov 8, 2024 | 62W38 | CookDistrict 1 | (6.41-Mile) Bridge Rehabilitation and Roadway Improvement along IL 53 in Cook County. | — | Executed | Judlau Contracting, Inc. $82,838,696 · | ||
| Nov 8, 2024 | 62X03 | CookDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-190; I-90/94 expressways from W. of US 12/45 Mannheim Road to Congress Parkway in Cook County. | — | Executed | The Final Connection, Inc. $266,663 · | ||
| Nov 8, 2024 | 62X04 | CookDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-290/IL 110 (Eisenhower) expressway from Austin Blvd. to Wells Street in Cook County. | — | Executed | The Final Connection, Inc. $279,374 · | ||
| Nov 8, 2024 | 62X05 | CookDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to I-57 / I-94 (Bishop Ford Expwy) in Cook County. | — | Executed | The Final Connection, Inc. $331,356 · | ||
| Nov 8, 2024 | 62X06 | CookDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Lake Shore Dr. to IL 43 (Harlem Ave) in Cook County. | — | Executed | The Final Connection, Inc. $200,700 · | ||
| Nov 8, 2024 | 62X19 | CookDistrict 1 | Bridge Painting of the structures (Foster Ave over North Branch Chicago River SN: 016-0249, Foster Ave over No This improvement consists of Bridge Painting of the structures (Foster Ave over North Branch Chicago River SN: 016-0249, Foster Ave over North Branch Chicago River SN: 016-0250, Foster Ave over North Shore Channel SN: 016-0251, and Pulaski Rd over North Branch Chicago River SN: 016-2612) all structures are located at City of Chicago. The project length is 0.1 miles. | — | Executed | Eagle Painting & Maintenance Company, Inc. $700,460 · | ||
| Jan 17, 2025 | 61J63 | CookDistrict 1 | Construction of a multi-use path on Euclid Avenue from Vermon Street to Hicks Street and continuing on Hicks too Kirchoff Road in Rolling Meadows. | — | Executed | Martam Construction Incorporated $1,051,893 · | ||
| Jan 17, 2025 | 61K07 | CookDistrict 1 | Resurfacing and pavement widening at the IL 62/New Wilke Road intersection in Rolling Meadows. | — | Executed | Schroeder Asphalt Services, Inc. $2,851,746 · | ||
| Jan 17, 2025 | 61K53 | CookDistrict 1 | Install decorative street and pedestrian lighting on Des Plaines Avenue from Cermak Road to 26th Street in North Riverside. | — | Executed | Utility Dynamics Corporation $1,103,396 · | ||
| Jan 17, 2025 | 61K86 | CookDistrict 1 | Resurfacing Grand Boulevard from Grant Avenue to Prairie; Brookfield Avenue from Prairie Avenue to Woodside Ave., and Woodside Avenue from Golf Road to Brookfield Avenue in Brookfield. | — | Executed | Schroeder Asphalt Services, Inc. $4,534,006 · | ||
| Jan 17, 2025 | 61K87 | CookDistrict 1 | Reconstruction of 19th Avenue from Oak Street to Madison Street in Maywood. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,773,174 · | ||
| Jan 17, 2025 | 61K94 | CookDistrict 1 | Traffic signal modernization, sidewalk replacemnt, curb and gutter replacement, and pavement markings at the intersection of Wolf Road and Wiltse Drive in Northlake. | — | Executed | R. W. Dunteman Company $711,000 · | ||
| Jan 17, 2025 | 61L07 | CookDistrict 1 | HMA Resurfacing, pavement patching, curb and gutter, sidewalk, pedestrian signals , ADA improvements, and pavement markings on Devon Avenue between Bristol Lane and Arthur Avenue in Elk Grove Village. | — | Executed | Plote Construction, Inc. $1,405,063 · | ||
| Jan 17, 2025 | 61L08 | CookDistrict 1 | HMA resurfacing, pavement patching, ADA Ramps, traffic signal modifications, street lightin, pavement markings, and signage on Devon Avenue and Arlington Heights Road in Elk Grove Village. | — | Executed | Plote Construction, Inc. $1,585,102 · | ||
| Jan 17, 2025 | 62R99 | CookDistrict 1 | Bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located o (1576.49-Ft) The proposed improvement consists of bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located on US/ Ogden Avenue over IHB RR in the Village of LaGrange, Cook County | — | Executed | Martam Construction Incorporated $1,945,196 · | ||
| Jan 17, 2025 | 62T41 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook C (921-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook County. (SN-016-0669) | — | Executed | Martam Construction Incorporated $1,234,765 · | ||
| Jan 17, 2025 | 62V90 | CookDistrict 1 | HMA overlay, ADA sidewalk and curb ramp improvements, drainage improvements, APS improvements, HMA surface rem (1.88-Mile) Standard Overlay, Drainage and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. The project also includes - Pavement markings/ striping improvements at 17th Avenue and Salt Creek Trail crossing. - New sidewalk and curb ramps for sidewalks (ADA) improvements on Roosevelt Road and Frontage Road, just W | — | Rejected | K-Five Construction Corporation $2,943,344 · | ||
| Jan 17, 2025 | 62W71 | CookDistrict 1 | (3139.11-Ft) This project is a Standard Overlay and ADA Improvements. Located on Addison Street from IL. Route 171 (Cumberland Avenue) to Forest Preserve Drive within the City of Chicago. | — | Executed | A Lamp Concrete Contractors, Inc. $1,098,089 · | ||
| Jan 17, 2025 | 62X15 | CookDistrict 1 | (4,921-Ft) Designed Overlay, SMART Overlay, Curb Ramps (ADA) and Pedestrian Signals (APS) improvements on 5th Avenue from North River Road to IL 64 (North Avenue). This project is in the Villages of River Grove and Melrose Park in Cook County. | — | Executed | K-Five Construction Corporation $1,483,000 · | ||
| Jan 17, 2025 | 62X24 | CookDistrict 1 | Bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd This improvement consists of bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd. (55th St.) for project length of 546.8 ft (.103 miles) in the City of Chicago in Cook County. | — | Executed | Rausch Infrastructure, LLC $747,244 · | ||
| Jan 17, 2025 | 62X75 | CookDuPageDistrict 1 | Expressway Cleaning (Litter/Debris Removal) on various routes in D1. | — | Executed | Orlando Lawn Service, Inc. $276,000 · | ||
| Jan 17, 2025 | 62X78 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | Orlando Lawn Service, Inc. $227,238 · | ||
| Jan 17, 2025 | 62X81 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | Thor General Contracting LLC $210,330 · | ||
| Mar 7, 2025 | 61K89 | CookDistrict 1 | Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements. | — | Executed | D. Construction, Inc. $9,722,683 · | ||
| Mar 7, 2025 | 61L01 | CookDistrict 1 | Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest. | — | Executed | D. Construction, Inc. $341,757 · | ||
| Mar 7, 2025 | 61L09 | CookDistrict 1 | Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake. | — | Executed | Home Towne Electric, Inc. $674,695 · | ||
| Mar 7, 2025 | 61L12 | CookDistrict 1 | Resurface Main Street from US 30 to 216th Street in Matteson. | — | Executed | Gallagher Asphalt Corporation $824,771 · | ||
| Mar 7, 2025 | 61L14 | CookDistrict 1 | HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings. | — | Executed | D. Construction, Inc. $927,996 · | ||
| Mar 7, 2025 | 61L15 | CookDistrict 1 | Resurface 207th Street from IL 50 to Crawford Avenue in Matteson. | — | Executed | P. T. Ferro Construction Co. $899,917 · | ||
| Mar 7, 2025 | 61L20 | CookDistrict 1 | Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland. | — | Executed | D. Construction, Inc. $413,449 · | ||
| Mar 7, 2025 | 61L23 | CookDistrict 1 | HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage. | — | Executed | A Lamp Concrete Contractors, Inc. $1,163,964 · | ||
| Mar 7, 2025 | 61L25 | CookDistrict 1 | Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor. | — | Executed | D. Construction, Inc. $1,920,303 · | ||
| Mar 7, 2025 | 61L27 | CookDistrict 1 | HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage. | — | Executed | Gallagher Asphalt Corporation $592,913 · | ||
| Mar 7, 2025 | 62L58 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County. | — | Rejected | Builders Paving, LLC $4,247,496 · | ||
| Mar 7, 2025 | 62N91 | CookDistrict 1 | (3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County. | — | Executed | Dunnet Bay Construction Company & K-Five Construction Corporation $105,964,527 · | ||
| Mar 7, 2025 | 62P43 | CookDistrict 1 | (533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street. | — | Executed | Lorig Construction Company $13,975,161 · | ||
| Mar 7, 2025 | 62R58 | CookDuPageDistrict 1 | This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. | — | Executed | R. W. Dunteman Company $4,792,444 · | ||
| Mar 7, 2025 | 62R73 | CookDistrict 1 | Culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile) | — | Executed | Martam Construction Incorporated $2,946,729 · | ||
| Mar 7, 2025 | 62T48 | CookDistrict 1 | (1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest. | — | Executed | D. Construction, Inc. $589,859 · | ||
| Mar 7, 2025 | 62T50 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County (292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County. | — | Executed | D. Construction, Inc. $1,094,671 · | ||
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62W63 | CookDistrict 1 | This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL. | — | Executed | A Lamp Concrete Contractors, Inc. $794,968 · | ||
| Mar 7, 2025 | 62W73 | CookDistrict 1 | Standard and Design Overlay and ADA Improvements and all incidental and collateral work (2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County. | — | Rejected | Peter Baker & Son Co. $4,682,472 · | ||
| Mar 7, 2025 | 62W87 | CookDistrict 1 | (9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton. | — | Active | Lorig Construction Company $81,370,819 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Apr 25, 2025 | 61K19 | CookDistrict 1 | HMA resurfacing on Landmeier Road from Lively Boulevard to Cambridge Drive in Grove Village. Includes; patching, curb and gutter, storm sewer, sidewalks, traffic signal relocation, and ADA improvements. | — | Rejected | R. W. Dunteman Company $1,589,589 · | ||
| Apr 25, 2025 | 61L06 | CookDistrict 1 | Construct a shared-use path and roadway reconstruction at various locations in Park Forest. | — | Executed | D. Construction, Inc. $6,160,173 · | ||
| Apr 25, 2025 | 61L22 | CookDistrict 1 | HMA resurfacing on North Avenue from Oak Avenue to Lake Street in Bartlett. Includes patching, sidewalks, and curb and gutter. | — | Executed | Everlast Blacktop Inc. $935,775 · | ||
| Apr 25, 2025 | 61L33 | CookDistrict 1 | Resurfacing on Shermer Road from Golf road to East Lake Avenue in Glenview. Includes; patching, curb and gutter, and ADA improvements. | — | Executed | Peter Baker & Son Co. $2,603,039 · | ||
| Apr 25, 2025 | 61L41 | CookDistrict 1 | Sidewalk removal and replacement on various routes in Evanston. | — | Executed | Triggi Construction, Inc. $396,952 · | ||
| Apr 25, 2025 | 62J79 | CookDistrict 1 | IL 64: Gross Length (5.53 miles), Net Length = (5.05 miles) Frontage Rd: (500 feet) Designed Overlay, Drainage and ADA Improvements. The project is located within the City of Northlake, Villages of Melrose Park, River Forest, Stone Park, River Grove and Elmwood Park in Cook County, Illinois. | — | Executed | Plote Construction, Inc. $17,639,508 · | ||
| Apr 25, 2025 | 62R02 | CookDistrict 1 | This is a curb ramp for sidewalk ADA improvements, HMA surface removal and overlay, sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, placement of pavement markings. This work is located on various State maintained arterial routes within Cook County. | — | Executed | Triggi Construction, Inc. $1,609,615 · | ||
| Apr 25, 2025 | 62R62 | CookDistrict 1 | (1,239-Ft) Bridge Replacement Project for Michigan City Rd., bridge over I-94 (SN 016-1068) and reconstruction of a new bridge (SN 016-8320 and a new concrete retaining wall, underpass lighting at two locations and High Mast Lighting Towers (HMLT) modifications within I-94 corridor in Cook County, Village of Dolton, IL | — | Executed | Areatha Construction Co., Inc. $12,098,192 · | ||
| Apr 25, 2025 | 62T20 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replaceme (1.37-Mile) Smart Overlay and pedestrian ramp (ADA) consists of hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with hot-mix asphalt surface course, thermoplastic pavement markings. Located in the Village of Midlothian and City of Oak Forest in Bremen Township in Cook County. | — | Executed | Iroquois Paving Corporation $2,071,695 · | ||
| Apr 25, 2025 | 62V36 | CookDistrict 1 | Asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage struc (3.59-Mile) Smart Overlay and ADA improvements consists of asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage structures adjustment and cleaning, thermoplastic pavement markings, sidewalk curb ramps, accessible pedestrian signal (APS). Located within the municipal limits of the Village of Oak Lawn, Village of Alsip, and City of Chicago, in Cook County, IL. | — | Executed | Iroquois Paving Corporation $5,393,745 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.