Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2026 | 61M16 | CookDistrict 1 | Resurfacing and channelization on Gannon Drive from Golf Road to Higgins Road in the Village of Hoffman Estates. | — | Executed | A Lamp Concrete Contractors, Inc. $838,719 · | ||
| Feb 27, 2026 | 61M18 | CookDistrict 1 | Resurfacing 171st Street from California Avenue to I-80/294 and from Western Avenue to I-80/294 in the Village of Hazel Crest. | — | Executed | Gallagher Asphalt Corporation $399,778 · | ||
| Feb 27, 2026 | 61M20 | CookDistrict 1 | Lighting improvements on IL 50 from 87th Street to 111th Street in the Village of Oak Lawn. | — | Executed | H & H Electric Co. $318,848 · | ||
| Feb 27, 2026 | 61M21 | CookDistrict 1 | Lighting improvements on US 20 from 69th Avenue to 54th Avenue and from IL 50 to Pulaski Road in the Village of Oak Lawn. | — | Executed | H & H Electric Co. $326,553 · | ||
| Feb 27, 2026 | 61M26 | CookDistrict 1 | HMA resurfacing of Braintree Drive from Wise Road to Weathersfield Way in the village of Schaumburg. Work also includes construction of a roundabout intersection at Weathersfield Way, curb and gutter, PCC shared-use path, ADA ramps, lighting and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $12,659,993 · | ||
| Feb 27, 2026 | 61M27 | CookDistrict 1 | HMA resurfacing of Braintree Road from Weathersfield Way to Schaumburg Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, lighting relocation and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $3,554,124 · | ||
| Feb 27, 2026 | 61M28 | CookDistrict 1 | HMA resurfacing of Braintree Drive from Schaumburg Road to Bode Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, traffic signal modification, lighting relocation and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $3,964,130 · | ||
| Feb 27, 2026 | 61M31 | CookDistrict 1 | Resurfacing Jones Road from Highland Boulevard to IL 72 in the village of Hoffman Estates. | — | Executed | A Lamp Concrete Contractors, Inc. $631,786 · | ||
| Feb 27, 2026 | 61M32 | CookDistrict 1 | Resurfacing Montrose Avenue from Sayre Avenue to Forest Preserve Drive in the village of Harwood Heights. | — | Executed | A Lamp Concrete Contractors, Inc. $839,740 · | ||
| Feb 27, 2026 | 62V09 | CookDistrict 1 | (1621-Ft) Intersection Improvements and Traffic Modernization will involve right-turn lane Pavement Reconstruction, Pavement widening, Intersection Resurfacing, Traffic Signal Modification, and ADA improvements. Located at IL 72 (Higgins Road) and Huntington Boulevard in the Village of Hoffman Estates in Cook County. | — | Executed | Plote Construction, Inc. $2,129,000 · | ||
| Feb 27, 2026 | 62X53 | CookDistrict 1 | (185-ft) Proposed Culvert Repairs improvements is located at the intersection of IL 59 and IL 68 (Dundee Road) SN 016-2212, Village of Barrington Hills in Cook County. | — | Executed | MYS, Incorporated $899,287 · | ||
| Feb 27, 2026 | 62X88 | CookDistrict 1 | (6,935-Ft) Designed and Standard Overlays, ADA sidewalk ramp Improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, placement of pavement markings, installation of sidewalk ramp improvements, located on IL Route 43 (Waukegan Rd.) from Henley Street to Emerson Street in the Villages of Glenview and Morton Grove in Cook County. | — | Executed | Peter Baker & Son Co. $2,806,275 · | ||
| Feb 27, 2026 | 62Y17 | CookDistrict 1 | Joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak (460-Ft) Bridge Deck Overlay (SN 016-0634) consist of joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak Road at Des Plaines River in the Village of North Riverside Cook County. | — | Executed | MYS, Incorporated $1,272,505 · | ||
| Feb 27, 2026 | 80B56 | CookDistrict 1 | Cleaning and painting designated steel surfaces Bridge Painting project consists of cleaning and painting designated steel surfaces. Location 1: IL-21 (FAU 1332A) over US-14 (SN: 016-2572) Location 2: Oakton St. (FAP 374) over Des Plaines River 14 (SN: 016-2601) | — | Executed | Eagle Painting & Maintenance Company, Inc. $401,758 · | ||
| Feb 27, 2026 | 80B83 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $160,313 · | ||
| Feb 27, 2026 | 80B84 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $211,275 · | ||
| Apr 24, 2026 | 61L54 | CookDistrict 1 | HMA resurfacing of FAU 1447 (16th St.) from Harlem Ave. to Lombard Ave. in the City of Berwyn. Additional work includes traffic signal improvements, curb and gutter repair, pavement markings and other required work. | — | Executed | Martam Construction Incorporated $10,340,904 · | ||
| Apr 24, 2026 | 61M15 | CookDistrict 1 | Construct a prefabricated truss bridge with approach spans to carry a shared-use path over US 14 and Union Pacific Railroad. Includes; MSE walls, HMA path, sidewalk, pavement patching, landscaping, and drainage improvements from Melas Park to Meadows Park in Mount Prospect. | — | Executed | Dunnet Bay Construction Company $10,744,243 · | ||
| Apr 24, 2026 | 62K33 | CookDistrict 1 | (2.03-Mile) The project includes widening and reconstruction of Barrington Road to provide two lanes in each direction separated by a median from Mundhank Road to IL 62, replacing the Poplar Creek box culvert, modernizing and replacing traffic signals, interconnection, sidewalk and shared-use paths, ADA improvements, landscaping. The project is located on Barrington Road from Central Road to IL 62 (Algonquin Road). | — | Executed | Plote Construction, Inc. $31,680,000 · | ||
| Apr 24, 2026 | 62L85 | CookDistrict 1 | Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (1,525-Ft) Standard Overlay consists of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Located in the Village of Forest Park, Cook County. | — | Executed | K-Five Construction Corporation $852,460 · | ||
| Apr 24, 2026 | 62P51 | CookDistrict 1 | Earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter (3,935-Ft) Traffic Signal Modernization and lighting installation project consists of earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter removal, pavement patching, installation of aggregate and (HMA) shoulders, widening with (HMA) base course, resurfacing with polymerized (HMA) binder and polymerized (HMA) surface courses, structure adjustments, installation of storm sewer, drainage structures, sidewalk, shared-use path, driveways, lig | — | Executed | Martam Construction Incorporated $6,339,172 · | ||
| Apr 24, 2026 | 62X31 | CookWillDistrict 1 | (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) | — | Executed | D. Construction, Inc. $135,363 · | ||
| Apr 24, 2026 | 62X44 | CookDistrict 1 | Bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical This improvement consists of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the faces of curbs/raised medians, and inside and outside of dividing walls along walkways of the structure, roadway faces of parapets. (41) SN locations along I-90/94 (Edens and Kennedy Expressways) in the City of Chicago, Villages of Skokie and Wilmette, Cook County. | — | Executed | Mosley Construction 1, LLC $459,265 · | ||
| Apr 24, 2026 | 62X57 | CookDistrict 1 | Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement (1.27-Mile) Design Overlay consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Wilmette, Kenilworth and Winnetka. | — | Executed | Schroeder Asphalt Services, Inc. $1,529,254 · | ||
| Apr 24, 2026 | 62Y28 | CookDistrict 1 | Furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS equipment to run on cellular communications. This work also consists of installing temporary fiber optic cable. Improvements associated with this project are located with the Villages of Hillside, Bellwood, Westchester, Broadview, Maywood, Forest Park, and Oak Park, as well as the City of Chicago in Cook County, on I-290 between Wolf Road and Racine Avenue. | — | Executed | Meade Inc. $9,649,148 · | ||
| Apr 24, 2026 | 62Y30 | CookDistrict 1 | Scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk (190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. This project is in the City of Chicago in Cook County. | — | Executed | Martam Construction Incorporated $786,723 · | ||
| Apr 24, 2026 | 80B09 | CookDistrict 1 | (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerize (9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerized (HMA) binder course, thermoplastic pavement markings and preformed plastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement The project is located within the Village of Elk Grove in Elk Grove Township in Cook County. | — | Executed | Builders Paving, LLC $4,440,808 · | ||
| Apr 24, 2026 | 80B21 | CookDistrict 1 | (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace (3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace), sidewalk removal, thermoplastic pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. This project is in the Village of Schaumburg in Cook County. | — | Executed | K-Five Construction Corporation $4,582,944 · | ||
| Apr 24, 2026 | 80B26 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers located in the City of Blue Island and Village of Calumet Park in Cook County. | — | Executed | Gallagher Asphalt Corporation $2,940,592 · | ||
| Apr 24, 2026 | 80B27 | CookDistrict 1 | (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (HMA) binder course, thermoplastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement and median repair. The project is located within the City of Des Plaines in Maine Township in Cook County. | — | Executed | Plote Construction, Inc. $5,915,339 · | ||
| Apr 24, 2026 | 80B30 | CookDistrict 1 | (2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, earth excavation, pavement patching, resurfacing with HMA, full depth HMA shoulder, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Located on IL 171 (Archer Avenue) in the Village of Lemont, Cook County. | — | Executed | K-Five Construction Corporation $4,118,431 · | ||
| Apr 24, 2026 | 80B39 | CookDistrict 1 | Resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sid (4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sidewalks. Location along US 34 (Ogden Ave) in the Cities of Brookfield, LaGrange, Lyons, and Riverside in Cook County. | — | Executed | K-Five Construction Corporation $6,442,571 · | ||
| Apr 24, 2026 | 80B48 | CookDistrict 1 | (1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing bridge deck, concrete patching. The existing guardrail and bridge rails will be updated to meet standards. Pavement marking will be reestablished at the end of the construction. Project is in the city of Chicago, Cook County, Illinois, along Central Avenue over the North Branch of the Chicago River. | — | Executed | Martam Construction Incorporated $1,108,954 · | ||
| Apr 24, 2026 | 80B55 | CookDistrict 1 | Bridge painting of the structures (Roosevelt Rd This improvement consists of bridge painting of the structures (Roosevelt Rd. over I-90/94 (Dan Ryan Expwy) SN: 016-0478, and Wilson Ave. over I-94 (Edens Expwy) SN: 016-2038. All structures are located at City of Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,123,158 · | ||
| Apr 24, 2026 | 80B62 | CookDistrict 1 | (373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarification, full and partial depth repairs to bridge slab and approach slab, HMA overlay on approach slabs, bridge deck grooving, concrete repair, maintenance of traffic, pavement marking, ADA ramps located on the Chicago Avenue bridge over I-90/94 in the City of Chicago in Cook County. | — | Executed | Martam Construction Incorporated $1,446,233 · | ||
| Apr 24, 2026 | 80B79 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Charles & Charlie Janitorial Landscaping LLC $628,506 · | ||
| Apr 24, 2026 | 80B80 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | Orlando Lawn Service, Inc. $150,790 · | ||
| Apr 24, 2026 | 80C49 | CookDistrict 1 | Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder (2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavem | — | Executed | K-Five Construction Corporation $4,164,775 · | ||
| Jun 12, 2026 | 46952 | CookDistrict 1 | Resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in | — | Executed | K-Five Construction Corporation $3,153,771 · | ||
| Jun 12, 2026 | 61M46 | CookDistrict 1 | HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook. | — | Executed | Builders Paving, LLC $2,247,439 · | ||
| Jun 12, 2026 | 61M49 | CookDistrict 1 | Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood. | — | Executed | Sjostrom & Sons, Inc. $1,709,017 · | ||
| Jun 12, 2026 | 61M51 | CookDistrict 1 | Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn. | — | Executed | Martam Construction Incorporated $3,179,237 · | ||
| Jun 12, 2026 | 61M53 | CookDistrict 1 | Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling. | — | Executed | Builders Paving, LLC $478,613 · | ||
| Jun 12, 2026 | 62L30 | CookDistrict 1 | (2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County. | — | Executed | D. Construction, Inc. $13,940,412 · | ||
| Jun 12, 2026 | 62R61 | CookDistrict 1 | (710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290. | — | Executed | OHLA Central, Inc. $43,537,120 · | ||
| Jun 12, 2026 | 62T46 | CookDistrict 1 | Bridge Joint Replace, bearing and Substructure Repairs (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois. | — | Executed | D. Construction, Inc. $602,552 · | ||
| Jun 12, 2026 | 62V08 | CookDuPageKaneDistrict 1 | Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. | — | Executed | D. Construction, Inc. $1,863,322 · | ||
| Jun 12, 2026 | 62W83 | CookDistrict 1 | This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County. | — | Executed | H & H Electric Co. $2,052,267 · | ||
| Jun 12, 2026 | 62W91 | CookDistrict 1 | Installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to a This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together consists of installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to allow for remote access and monitoring capabilities. The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County. | — | Rejected | H & H Electric Co. $1,753,960 · | ||
| Jun 12, 2026 | 62W99 | CookDistrict 1 | Furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting. Located in the Elk Grove Township and City of Schaumburg, Cook County, on IL 53/I-290 from south I-90 interchange to IL 72 (Higgins Rd). | — | Executed | K-Five Construction Corporation $25,555,133 · | ||
| Jun 12, 2026 | 80B22 | CookDistrict 1 | (3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL. | — | Executed | K-Five Construction Corporation $7,389,202 · | ||
| Jun 12, 2026 | 80B28 | CookDistrict 1 | (4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois. | — | Executed | K-Five Construction Corporation $3,929,710 · | ||
| Jun 12, 2026 | 80B33 | CookDistrict 1 | (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, c (5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. | — | Executed | D. Construction, Inc. $933,943 · | ||
| Jun 12, 2026 | 80B35 | CookDistrict 1 | (1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County. | — | Executed | K-Five Construction Corporation $2,873,926 · | ||
| Jun 12, 2026 | 80B47 | CookDistrict 1 | Reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105) | — | Executed | Areatha Construction Co., Inc. $641,982 · | ||
| Jun 12, 2026 | 80B51 | CookDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental work (0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County. | — | Executed | Capital Industrial Services, LLC $493,330 · | ||
| Jun 12, 2026 | 80B58 | CookDistrict 1 | Drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Vi (3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County. | — | Executed | MYS, Incorporated $652,635 · | ||
| Jun 12, 2026 | 80B66 | CookDistrict 1 | Installation of permanent protective shielding as shown on the plans and any incidental and collateral work ne This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County. | — | Executed | Lorig Construction Company $397,833 · | ||
| Jun 12, 2026 | 80B78 | CookDistrict 1 | Refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from (1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County. | — | Rejected | MYS, Incorporated $1,409,040 · | ||
| Jun 12, 2026 | 80B87 | CookDistrict 1 | A design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement ma (5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County. | — | Executed | Builders Paving, LLC $3,116,448 · | ||
| Jun 12, 2026 | 80C89 | CookLakeDistrict 1 | This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. | — | Executed | H & H Electric Co. $2,718,198 · | ||
| Jun 12, 2026 | 80C90 | CookDistrict 1 | Repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfol (2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County | — | Rejected | F. H. Paschen, S.N. Nielsen & Associates LLC $2,448,235 · | ||
| Jun 12, 2026 | 80C97 | CookDistrict 1 | Advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue (110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County. | — | Executed | Rausch Infrastructure, LLC $727,711 · | ||
| Jun 12, 2026 | 80D00 | CookDistrict 1 | (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Co | — | Executed | Plote Construction, Inc. $2,322,000 · | ||
| Jul 31, 2026 | 61K85 | CookDistrict 1 | Reconstruction of Weber Dr. from Central Rd. to IL 62 in the city of Rolling Meadows. | — | Executed | Plote Construction, Inc. $2,813,311 · | ||
| Jul 31, 2026 | 61M50 | CookDistrict 1 | Construction of a single-lane roundabout at the intersection of Ravina Ave. and 153rd St. in the village of Orland Park. | — | Active | |||
| Jul 31, 2026 | 62J64 | CookDistrict 1 | Hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement p (3,478-Ft) SMART overlay, Traffic Signal Modernization and ADA improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings.Located within the Villages of Glencoe and Northbrook in Cook County. | — | Executed | Peter Baker & Son Co. $2,925,476 · | ||
| Jul 31, 2026 | 62T84 | CookDistrict 1 | Sidewalk and ADA improvements (848.83-Ft) The improvement includes replacement of the existing concrete box culvert (SN 016-0926) with a proposed triple cell concrete box culvert (SN 016-8321) consists of sidewalk and ADA improvements. This improvement is located along FAU 2843 (Dixie Highway) over Thron Creek Tributary (0.4 miles North of IL 1) in the City of Chicago Heights, Cook County, IL. | — | Executed | D. Construction, Inc. $1,552,966 · | ||
| Jul 31, 2026 | 62V29 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3.4-Mile) The improvement consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in villages of Maywood, Forest Park, Melrose Park and River Grove in Cook counties. | — | Executed | Denler, Inc. $334,302 · | ||
| Jul 31, 2026 | 62V45 | CookDistrict 1 | HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudin (3.3-Mile) Designed Overlay consists of HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudinal pavement joints between traffic lanes and curb and gutter, placement of thermoplastic and modified urethane pavement markings. This project is located within the City of Alsip and Blue Island in Cook County. | — | Executed | D. Construction, Inc. $1,062,900 · | ||
| Jul 31, 2026 | 62V64 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3,765-Ft) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane marking lines. Located through the Municipalities of Hanover Park, Bartlett, and Streamwood in Cook County. | — | Executed | Denler, Inc. $85,435 · | ||
| Jul 31, 2026 | 62W20 | CookDistrict 1 | Widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal (1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal and installation of new guardrail, striping ond drainage improvements. The project is in Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, IL. | — | Executed | D. Construction, Inc. $7,166,048 · | ||
| Jul 31, 2026 | 62X43 | CookDistrict 1 | Reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a late (166-Ft) Glenwood Road Bridge (SN 016-0793) over Butterfield Creek project consists of reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a latex concrete overlay (2¼-) with diamond grinding, application of a protective coat, and substructure concrete repairs, installation of HMA on each side of the bridge. Located within Glenwood Road over Butterfield Creek in the Village of Glenwood in Cook County. | — | Executed | D. Construction, Inc. $290,657 · | ||
| Jul 31, 2026 | 62Y20 | CookDistrict 1 | Deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay (262-Ft) Bridge Deck Overlay and Bridge Joint Replacement will involve bridge repairs. These repairs will generally consist of deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay. This proposed Bridge Repair (SN 016-2705) is located on Ogden Avenue over IL 50 Cicero Avenue, located in Cook County, IL. | — | Executed | Martam Construction Incorporated $1,236,716 · | ||
| Jul 31, 2026 | 80B44 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments (2,800-Ft) Bridge Overlay includes HMA resurfacing and patching consists of bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments, concrete pier repair, cleaning and adjusting deck drains, road surface removal, HMA overlay and paving, pavement patching, removal and replacement of combination curb and gutter, removal and replacement of guardrail, pavement markings. Located in the Village of Alsip, Cook County. | — | Executed | D. Construction, Inc. $2,052,202 · | ||
| Jul 31, 2026 | 80C87 | CookDistrict 1 | (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface c (1,538-Ft) Standard Overlay consists of (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface course and (HMA) binder course, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers. This project is located in the Village of Calumet Park, within Cook County. | — | Executed | Gallagher Asphalt Corporation $288,498 · | ||
| Jul 31, 2026 | 80D50 | CookDistrict 1 | Removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer GRAFFITI REMOVAL shall consist of removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer. Located on the Eisenhower (I-290) from Wells St to Mannheim Rd (US 45) in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $2,425,000 · | ||
| Sep 18, 2026 | 61K82 | CookDistrict 1 | HMA resurfacing and widening at the intersection of Waukegan Rd. and East Lake Avenue in the village of Glenview. Additional work includes storm sewers, curb and gutter, traffic signal modernization, lighting, pavement marking and other required work. | — | Executed | |||
| Sep 18, 2026 | 61M29 | CookDistrict 1 | Full depth pavement reconstruction of Willow Rd. from Forestway Dr. to Provident Ave. in the village of Winnetka. Work includes PCC pavement, curb and gutter, sidewalk, drainage improvements, traffic signals, lighting and other required work. | — | Awarded | |||
| Sep 18, 2026 | 61M58 | CookDistrict 1 | Construction of a shared-use path from Strieby Drive to Fullerton Avenue in the River Grove Forest Protection District. Includes aggregate and HMA, precast concrete boardwalk, sidewalk, and traffic signal modernization. | — | Active | |||
| Sep 18, 2026 | 61M63 | CookDistrict 1 | HMA resurfacing on George Street from North Avenue (IL 64 to the north village limit of Melrose Park. Includes curb and gutter, sidewalk, water main installation and pavement markings. | — | Active | |||
| Sep 18, 2026 | 61M64 | CookDistrict 1 | HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb and gutter, sidewalks with ADA ramps, drainage improvements and flashing beacons. | — | Active | |||
| Sep 18, 2026 | 61M66 | CookDistrict 1 | Pedestrian signing and pavement markings to upgrade existing shared-use paths and bicycle routes at various locations in Glenview. | — | Active | |||
| Sep 18, 2026 | 62V55 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course Smart Overlay, ADA and APS improvements consist of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, installation of raised reflective pavement markers, placement of thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. | — | Executed | Gallagher Asphalt Corporation $3,712,308 · | ||
| Sep 18, 2026 | 62X09 | CookDistrict 1 | (1.33-Mile) Drainage Improvements of the Frontage Road Storm Sewers (FRS) in Harrison Street that include Open Cut Trenching and Jacking Sewer Installation for storm sewer size 66-, jacking and receiving chambers, pavement removal, backfilling, roadway reconstruction and patching, resurfacing, relocation of water main and combined sewers along Harrison Street, and jacking water main and combined sewers under I-290. Location is on Harrison Street and Bataan Dr. from West of 21st Ave. to East of 1 | — | Active | |||
| Sep 18, 2026 | 80D33 | CookDistrict 1 | (3.44-Mile) SMART Overlay, bridge latex overlay, and ADA improvement includes (HMA) removal, pavement patching, resurfacing with (HMA), drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, sidewalk replacement, curb and gutter replacement, pedestrian signals, detector loops, hydro-scarification, deck slab repair, diamond grinding, joint replacement with strip seals, replace diaphragms, approach slab repair, concrete sealer, asphalt butt joints, rel | — | Executed | K-Five Construction Corporation $6,437,242 · | ||
| Sep 18, 2026 | 80D39 | CookDistrict 1 | (2.46-Mile) Crack and Joint Sealant improvement consisting of routing, cleaning and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, restriping with modified urethane pavement marking. This improvement is located within the City of Berwyn and the Town of Cicero in Cook County. | — | Executed |
1,001–1,087 of 1,087‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.