146BidsSep 11, 2013 to Feb 5, 2026
16Wins (low bidder)
11.0%Win rate
$278,869,803Total won
Competitor scorecard
Last 5 years in Texas12.5%Win rate7 of 56 bids
+14.0%Average bid vs estimate
-7.0%Winning bids vs estimate
+25.1%Over the low bid when they loseAverage field: 4.7 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| RK HALL, LLC | 29 | 9 | 20 | 31% |
| DUININCK, INC. | 24 | 2 | 22 | 8% |
| A. L. HELMCAMP, INC. | 23 | 3 | 20 | 13% |
| J. LEE MILLIGAN, INC. | 20 | 4 | 16 | 20% |
| FNF CONSTRUCTION, INC. | 14 | 3 | 11 | 21% |
| JONES BROS. DIRT & PAVING CONTRACTORS, INC. | 11 | 1 | 10 | 9% |
| GILVIN-TERRILL, LTD. | 10 | 5 | 5 | 50% |
| JAMES HAMILTON CONSTRUCTION CO. | 9 | 2 | 7 | 22% |
| CK NEWBERRY, LLC | 9 | 3 | 6 | 33% |
| WEBBER, LLC | 6 | 2 | 4 | 33% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Feb 5, 2026 | 0140-03-052 | IH10_W_OF_WFM11_TO_FM2886Pecos · Odessa | 7 of 7 | $22,010,190 | $14,714,263FNF CONSTRUCTION, INC. | +49.6% |
| Nov 6, 2025 | 0042-12-096 | US 287 Hall C/L to 2102' W of FM 164Childress · Childress | 8 of 8 | $7,548,471 | $5,183,756RK HALL, LLC | +45.6% |
| Oct 9, 2025 | 0380-04-025 | SH 137-US 62 to Dawson CoLn SP2Terry · Lubbock | 5 of 5 | $28,823,132 | $22,303,962A. L. HELMCAMP, INC. | +29.2% |
| Sep 5, 2025 | 0355-05-046 | SH 207 OVHansford · Amarillo | 4 of 5 | $15,475,567 | $12,484,683DUININCK, INC. | +24.0% |
| Sep 4, 2025 | 0425-01-021 | US 87 4-LANE FROM US 385 TO MOOREHartley · Amarillo | 6 of 6 | $182,077,390 | $99,678,127FNF CONSTRUCTION, INC. | +82.7% |
| Jul 2, 2025 | 6484-76-001 | FY 2025 - MMC Hot Mix ParkerParker · Fort Worth | 1 of 6 | $598,000 | $598,000 | Won |
| Jul 2, 2025 | 0292-04-063 | SH18_S_OF_IH20_S_OF_FM1776Ward · Odessa | 5 of 7 | $22,147,361 | $17,279,720JONES BROS. DIRT & PAVING C… | +28.2% |
| Jun 5, 2025 | 0005-04-083 | IH20_E_StantonInterchange_HowardCL_RehabMartin · Odessa | 4 of 5 | $15,431,504 | $11,318,569JONES BROS. DIRT & PAVING C… | +36.3% |
| Jun 4, 2025 | 1158-05-002 | FM 2185 ExtensionCulberson · El Paso | 4 of 4 | $149,255,443 | $123,682,484A. L. HELMCAMP, INC. | +20.7% |
| May 1, 2025 | 0052-01-043 | OV-US 70 Farwell to Bailey CCSJParmer · Lubbock | 7 of 8 | $37,257,716 | $29,652,485A. L. HELMCAMP, INC. | +25.6% |
| Apr 3, 2025 | 0139-08-040 | US285_0.7MI_N_GOMEZ_RD_1.8 MI N IH 10Pecos · Odessa | 6 of 6 | $38,593,350 | $26,858,499JONES BROS. DIRT & PAVING C… | +43.7% |
| Mar 5, 2025 | 0397-02-041 | SH 152 Super 2Wheeler · Childress | 6 of 6 | $18,125,883 | $14,172,579RK HALL, LLC | +27.9% |
| Mar 5, 2025 | 0139-03-053 | US285_OverlayCR232_SH302Reeves · Odessa | 6 of 6 | $14,351,803 | $10,373,162FNF CONSTRUCTION, INC. | +38.4% |
| Mar 4, 2025 | 1337-01-026 | FY 26 BSSP-HR SH 23 Gilaloo Creek BridgeLipscomb · Amarillo | 4 of 5 | $23,149,076 | $18,726,656EARTH BUILDERS, L.P. | +23.6% |
| Mar 4, 2025 | 0053-05-050 | US 84-FM 2458 to CR 386 CCSJGarza · Lubbock | 5 of 5 | $18,368,117 | $13,312,185A. L. HELMCAMP, INC. | +38.0% |
| Feb 6, 2025 | 0140-13-020 | 0140-13-020 IH 10 ACP OVERLAYCrockett · San Angelo | 1 of 6 | $24,564,337 | $24,564,337 | Won |
| Jan 8, 2025 | 0461-04-026 | SH 214 Sup 2 Morton to YoakumCochran · Lubbock | 5 of 5 | $34,825,666 | $28,894,124JAMES HAMILTON CONSTRUCTION… | +20.5% |
| Dec 4, 2024 | 0052-05-046 | OV-US 84 Ltlfld to HockleyLamb · Lubbock | 5 of 6 | $31,163,966 | $25,868,924A. L. HELMCAMP, INC. | +20.5% |
| Nov 7, 2024 | 0003-06-103 | IH20_W_OF_FM2903_W_CR210_OVERLAYReeves · Odessa | 4 of 6 | $35,470,904 | $31,497,131FNF CONSTRUCTION, INC. | +12.6% |
| Nov 6, 2024 | 0003-06-101 | IH20_0.35 MI W of CR 210_0.15MI_W_CR209Reeves · Odessa | 3 of 6 | $36,005,378 | $27,943,635FNF CONSTRUCTION, INC. | +28.9% |
| Nov 6, 2024 | 0042-03-047 | FY 25 US 287 OV ARMSTRONG COArmstrong · Amarillo | 4 of 5 | $20,958,037 | $19,891,474DUININCK, INC. | +5.4% |
| Aug 2, 2024 | 0077-05-031 | PREVENTIVE MAINTENANCEIrion · San Angelo | 2 of 5 | $52,793,315 | $52,231,941RK HALL, LLC | +1.1% |
| Jun 6, 2024 | 0006-03-121 | CONSTRUCT REST AREANolan · Abilene | 2 of 2 | $79,817,932 | $74,808,808WEBBER, LLC | +6.7% |
| Jun 6, 2024 | 0043-02-080 | BRIDGE REPLACEMENTHardeman · Childress | 2 of 4 | $32,210,206 | $28,987,860MORTMARA CONSTRUCTION, INC. | +11.1% |
| Jun 6, 2024 | 1155-01-017 | HIGHWAY IMPROVEMENTMartin · Odessa | 4 of 4 | $37,415,775 | $26,967,769JONES BROS. DIRT & PAVING C… | +38.7% |
| Jun 5, 2024 | 0137-03-085 | WIDEN ROAD - ADD SHOULDERSWichita · Wichita Falls | 3 of 4 | $27,699,121 | $20,570,032A. L. HELMCAMP, INC. | +34.7% |
| Jun 5, 2024 | 0090-02-055 | HIGHWAY IMPROVEMENTOldham · Amarillo | 1 of 4 | $15,078,258 | $15,078,258 | Won |
| May 3, 2024 | 6462-50-001 | HOT MIXTarrant · Fort Worth | 3 of 4 | $1,113,250 | $1,033,100TEXAS MATERIALS GROUP, INC. | +7.8% |
| May 2, 2024 | 0455-03-038 | HIGHWAY IMPROVEMENTGray · Amarillo | 3 of 3 | $18,105,003 | $17,457,097RK HALL, LLC | +3.7% |
| May 2, 2024 | 0179-04-104 | BRIDGE REPLACEMENTMatagorda · Yoakum | 2 of 2 | $35,337,094 | $33,183,610MORTMARA CONSTRUCTION, INC. | +6.5% |
| Apr 4, 2024 | 0170-02-023 | PREVENTIVE MAINTENANCELipscomb · Amarillo | 3 of 4 | $21,600,858 | $19,475,601DUININCK, INC. | +10.9% |
| Apr 4, 2024 | 0068-05-040 | WIDEN ROAD - ADD LANES AND SHOULDERSDawson · Lubbock | 3 of 4 | $18,552,413 | $14,793,665A. L. HELMCAMP, INC. | +25.4% |
| Apr 4, 2024 | 6462-02-001 | HOT MIXParker · Fort Worth | 2 of 3 | $622,000 | $600,500AUSTIN ASPHALT, INC. | +3.6% |
| Mar 6, 2024 | 0003-08-065 | HIGHWAY IMPROVEMENTReeves · Odessa | 2 of 3 | $23,434,429 | $17,782,450A. L. HELMCAMP, INC. | +31.8% |
| Mar 5, 2024 | 0441-07-074 | ROADWAY REHABILITATIONPecos · Odessa | 3 of 4 | $15,245,108 | $12,743,573FNF CONSTRUCTION, INC. | +19.6% |
| Feb 2, 2024 | 1727-02-024 | REHABILITATE EXISTING ROADWAYMoore · Amarillo | 2 of 3 | $53,171,995 | $41,097,397J. LEE MILLIGAN, INC. | +29.4% |
| Jan 5, 2024 | 0043-04-083 | HIGHWAY IMPROVEMENTHardeman · Childress | 3 of 7 | $8,782,507 | $8,059,391DUININCK, INC. | +9.0% |
| Dec 6, 2023 | 0228-01-062 | REHABILITATE EXISTING ROADWAYTerry · Lubbock | 4 of 4 | $15,197,371 | $11,408,519JAMES HAMILTON CONSTRUCTION… | +33.2% |
| Dec 5, 2023 | 0132-01-055 | OVERLAYDickens · Childress | 5 of 5 | $12,702,579 | $11,319,018A. L. HELMCAMP, INC. | +12.2% |
| Nov 1, 2023 | 0184-01-070 | SURFACING/ROADWAY RESTORATIONCoryell · Waco | 4 of 4 | $15,002,219 | $8,907,042BIG CREEK CONSTRUCTION, LTD. | +68.4% |
| Sep 7, 2023 | 0168-08-075 | REHABILITATE EXISTING ROADWAYRandall · Amarillo | 4 of 4 | $39,952,585 | $34,924,134DUININCK, INC. | +14.4% |
| Sep 6, 2023 | 0042-06-076 | HIGHWAY IMPROVEMENTDonley · Childress | 5 of 5 | $7,735,503 | $6,446,301J. LEE MILLIGAN, INC. | +20.0% |
| Aug 2, 2023 | 0086-14-075 | RECONSTRUCT EXISTING ROADWAYWebb · Laredo | 4 of 4 | $506,017,012 | $344,030,535JAMES CONSTRUCTION GROUP, L… | +47.1% |
| Feb 1, 2023 | 0003-05-055 | HIGHWAY IMPROVEMENTReeves · Odessa | 2 of 3 | $63,521,091 | $56,142,249FNF CONSTRUCTION, INC. | +13.1% |
| Jan 6, 2023 | 0168-07-050 | REHABILITATE EXISTING ROADWAYDeaf Smith · Amarillo | 4 of 4 | $28,801,225 | $23,784,486RK HALL, LLC | +21.1% |
| Jan 5, 2023 | 0003-07-061 | HIGHWAY IMPROVEMENTReeves · Odessa | 1 of 3 | $18,857,194 | $18,857,194 | Won |
| Oct 6, 2022 | 0557-02-019 | SURFACING/ROADWAY RESTORATIONHutchinson · Amarillo | 5 of 5 | $8,687,767 | $7,081,620DUININCK, INC. | +22.7% |
| Sep 8, 2022 | 1245-02-050 | PREVENTIVE MAINTENANCEPotter · Amarillo | 5 of 5 | $9,652,784 | $7,909,237RK HALL, LLC | +22.0% |
| Mar 4, 2022 | 1189-01-020 | HIGHWAY IMPROVEMENTWinkler · Odessa | 3 of 3 | $21,698,936 | $14,858,747JONES BROS. DIRT & PAVING C… | +46.0% |
| Feb 8, 2022 | 6389-83-001 | DENSE GRADED HOT MIXReeves · Odessa | 1 of 3 | $296,475 | $296,475 | Won |
| Feb 4, 2022 | 1245-02-049 | HIGHWAY IMPROVEMENTPotter · Amarillo | 1 of 5 | $12,755,021 | $12,755,021 | Won |
| Feb 3, 2022 | 1245-01-019 | HIGHWAY IMPROVEMENTOldham · Amarillo | 1 of 4 | $18,084,714 | $18,084,714 | Won |
| Jan 7, 2022 | 0379-01-046 | REHABILITATE EXISTING ROADWAYHutchinson · Amarillo | 4 of 5 | $10,066,785 | $9,504,385DUININCK, INC. | +5.9% |
| Jan 6, 2022 | 0070-02-091 | PREVENTIVE MAINTENANCETom Green · San Angelo | 2 of 4 | $11,693,117 | $9,737,926REECE ALBERT, INC. | +20.1% |
| Jan 6, 2022 | 0133-01-049 | REHABILITATIONKing · Childress | 4 of 5 | $6,549,418 | $5,768,976A. L. HELMCAMP, INC. | +13.5% |
| Dec 1, 2021 | 0133-04-042 | UPGRADE TO SUPER 2Baylor · Wichita Falls | 4 of 5 | $20,666,069 | $15,938,381A. L. HELMCAMP, INC. | +29.7% |
| Oct 8, 2021 | 0168-05-041 | PREVENTIVE MAINTENANCEDeaf Smith · Amarillo | 4 of 5 | $6,238,623 | $5,275,867RK HALL, LLC | +18.2% |
| Sep 1, 2021 | 0052-02-036 | SURFACING/ROADWAY RESTORATIONBailey · Lubbock | 3 of 4 | $21,384,949 | $18,113,896DUININCK, INC. | +18.1% |
| Aug 4, 2021 | 0169-07-053 | HIGHWAY IMPROVEMENTGray · Amarillo | 2 of 5 | $17,638,977 | $16,536,379RK HALL, LLC | +6.7% |
| Aug 4, 2021 | 0699-01-052 | WIDEN ROAD - ADD LANESTaylor · Abilene | 2 of 2 | $33,782,320 | $28,944,555A. L. HELMCAMP, INC. | +16.7% |
| Jul 1, 2021 | 0139-06-021 | WIDEN ROAD - ADD LANESReeves · Odessa | 1 of 5 | $58,528,501 | $58,528,501 | Won |
| Jun 4, 2021 | 0075-02-026 | WIDEN ROAD - ADD LANES AND SHOULDERSPecos · Odessa | 4 of 7 | $40,718,946 | $35,754,470JONES BROS. DIRT & PAVING C… | +13.9% |
| Apr 8, 2021 | 0041-02-016 | REHABILITATE EXISTING ROADWAYHartley · Amarillo | 2 of 3 | $10,082,624 | $9,656,579J. LEE MILLIGAN, INC. | +4.4% |
| Mar 4, 2021 | 0916-38-014 | REPLACE BRIDGE AND APPROACHESAransas · Corpus Christi | 5 of 5 | $6,903,099 | $4,582,972LUCANIA CONSTRUCTION LLC | +50.6% |
| Feb 4, 2021 | 0160-02-025 | ADD PASSING LANESSutton · San Angelo | 12 of 12 | $25,886,120 | $19,351,497ALLEN KELLER COMPANY | +33.8% |
| Dec 3, 2020 | 0902-39-035 | STATE PARK IMPROVEMENTSPalo Pinto · Fort Worth | 6 of 6 | $5,434,601 | $3,292,351JAY MILLS CONTRACTING, INCO… | +65.1% |
| Nov 5, 2020 | 0034-03-019 | ADD PASSING LANESRunnels · San Angelo | 7 of 8 | $34,475,793 | $24,497,111J. H. STRAIN & SONS, INC. | +40.7% |
| Nov 5, 2020 | 0146-04-029 | ACP OVERLAYFoard · Childress | 6 of 7 | $5,838,639 | $5,097,897DUININCK, INC. | +14.5% |
| Nov 4, 2020 | 0397-01-045 | HIGHWAY IMPROVEMENTGray · Amarillo | 3 of 6 | $17,289,295 | $15,464,360RK HALL, LLC | +11.8% |
| Oct 2, 2020 | 0294-02-023 | SUPER 2 PASSING LANESGaines · Lubbock | 7 of 8 | $59,076,291 | $48,813,790JAMES HAMILTON CONSTRUCTION… | +21.0% |
| Sep 4, 2020 | 0957-09-018 | REPLACE FOUR NARROW BRIDGESPresidio · El Paso | 5 of 6 | $11,278,607 | $8,137,042RELMCO, INC. | +38.6% |
| Sep 3, 2020 | 0479-04-038 | ROADWAY REHABILITATIONWinkler · Odessa | 4 of 6 | $46,709,736 | $43,485,105JOHNSON BROS. CORPORATION, … | +7.4% |
| Aug 6, 2020 | 0479-04-050 | CONSTRUCT GRADE SEPARATIONSWinkler · Odessa | 1 of 4 | $54,467,579 | $54,467,579 | Won |
| Aug 6, 2020 | 0379-02-032 | REHABILITATE EXISTING ROADWAYPotter · Amarillo | 1 of 4 | $9,215,103 | $9,215,103 | Won |
| Aug 6, 2020 | 6363-67-001 | FENDER SYSTEM CONSTRUCTIONHarris · Houston | 9 of 9 | $27,374,653 | $12,567,752BO-MAC CONTRACTORS, LTD. | +117.8% |
| Jul 8, 2020 | 0133-03-038 | SUPER 2Knox · Childress | 2 of 6 | $13,999,706 | $12,684,228A. L. HELMCAMP, INC. | +10.4% |
| Jun 5, 2020 | 3559-02-007 | CONSTRUCT NEW ROADWAY LANESTarrant · Fort Worth | 8 of 8 | $128,376,830 | $98,999,997ZACHRY CONSTRUCTION CORPORA… | +29.7% |
| Jun 5, 2020 | 0139-03-047 | ROADWAY REHABILITATIONReeves · Odessa | 4 of 11 | $5,440,824 | $5,198,387JOHNSON BROS. CORPORATION, … | +4.7% |
| May 8, 2020 | 0157-05-064 | SPOT REPAIR, OVERLAYJones · Abilene | 5 of 9 | $17,079,176 | $15,184,947ZACK BURKETT CO. | +12.5% |
| May 8, 2020 | 0275-01-205 | BRIDGE MAINTENANCE AND REPAIRPotter · Amarillo | 4 of 4 | $27,694,990 | $15,820,659GIBSON & ASSOCIATES, INC. | +75.1% |
| May 8, 2020 | 1183-01-014 | ROADWAY REHABILITATIONReeves · Odessa | 2 of 7 | $62,440,431 | $62,350,992JONES BROS. DIRT & PAVING C… | +0.1% |
| May 7, 2020 | 0924-06-601 | FY 2020 BRIDGE MAINTENANCE (EL PASO COUNTY)El Paso · El Paso | 9 of 10 | $5,983,995 | $2,570,503J.D. ABRAMS, L.P. | +132.8% |
| Mar 5, 2020 | 0030-05-069 | REPLACE EXISTING BRIDGESHemphill · Amarillo | 5 of 5 | $36,867,745 | $16,941,870WEBBER, LLC | +117.6% |
| Mar 4, 2020 | 0076-08-027 | ADD PASSING LANESReagan · San Angelo | 2 of 3 | $29,637,788 | $23,698,271REECE ALBERT, INC. | +25.1% |
| Mar 4, 2020 | 0031-04-054 | SUPER 2 - SUBGRADE WIDENING, STRUCTURES & ACPCollingsworth · Childress | 2 of 6 | $11,502,134 | $11,250,761DUININCK, INC. | +2.2% |
| Feb 7, 2020 | 0463-06-028 | ROADWAY REHABILITATIONWinkler · Odessa | 3 of 4 | $85,517,216 | $63,338,505FNF CONSTRUCTION, INC. | +35.0% |
| Dec 4, 2019 | 0042-04-043 | 2" ACP OVERLAY, PAVEMENT REPAIRArmstrong · Amarillo | 1 of 5 | $8,973,976 | $8,973,976 | Won |
| Dec 3, 2019 | 0380-09-092 | MILL,INLAY,SUBGRADE WIDENING,SIGNS,&PAVEMENT MARKMidland · Odessa | 3 of 5 | $38,352,237 | $27,958,084JONES BROS. DIRT & PAVING C… | +37.2% |
| Dec 3, 2019 | 0275-11-083 | CRCP REPAIR, OVERLAY AND BRIDGE RAIL REPLACEMENT FGray · Amarillo | 4 of 6 | $12,071,065 | $10,924,180GILVIN-TERRILL, LTD. | +10.5% |
| Nov 5, 2019 | 0066-01-021 | OVERLAY AND PAVEMENT REPAIRDallam · Amarillo | 5 of 5 | $13,389,434 | $11,978,030RK HALL, LLC | +11.8% |
| Oct 2, 2019 | 2635-01-038 | OVERLAYPotter · Amarillo | 4 of 4 | $12,169,203 | $10,715,637RK HALL, LLC | +13.6% |
| Oct 2, 2019 | 0139-05-048 | ROADWAY REHABILITATIONReeves · Odessa | 4 of 4 | $9,618,717 | $6,540,325DAN WILLIAMS COMPANY | +47.1% |
| Aug 7, 2019 | 0004-02-060 | INSTALL MEDIAN BARRIERSWard · Odessa | 4 of 4 | $41,033,301 | $28,675,420DAN WILLIAMS COMPANY | +43.1% |
| Aug 6, 2019 | 0003-05-054 | INSTALL MEDIAN BARRIERSReeves · Odessa | 4 of 5 | $42,293,841 | $27,958,749DAN WILLIAMS COMPANY | +51.3% |
| Aug 6, 2019 | 0238-03-064 | THICK OVERLAY AND PAVEMENT REPAIRDallam · Amarillo | 3 of 4 | $15,966,790 | $14,364,734RK HALL, LLC | +11.2% |
| Jun 5, 2019 | 0461-05-011 | SUPER 2 PASSING LANESYoakum · | 4 of 4 | $27,588,479 | $24,052,608DUININCK, INC. | +14.7% |
| May 7, 2019 | 0006-07-080 | MILL & SMA OVRLAYCallahan · Abilene | 5 of 6 | $13,647,536 | $10,684,705A. L. HELMCAMP, INC. | +27.7% |
| Apr 3, 2019 | 0133-02-025 | SUPER 2Knox · Childress | 3 of 3 | $12,867,636 | $11,182,988A. L. HELMCAMP, INC. | +15.1% |
| Apr 2, 2019 | 0490-04-045 | OVERLAYRoberts · | 4 of 5 | $26,464,117 | $23,349,234J. LEE MILLIGAN, INC. | +13.3% |
| Apr 2, 2019 | 0040-03-064 | OVERLAYDallam · Amarillo | 2 of 4 | $17,526,979 | $17,114,342RK HALL, LLC | +2.4% |
| Apr 2, 2019 | 0068-03-033 | THIN OVERLAY MIXLynn · Lubbock | 4 of 4 | $16,154,500 | $13,819,501DUININCK, INC. | +16.9% |
| Mar 5, 2019 | 0030-02-052 | OVERLAYOchiltree · | 6 of 7 | $16,833,932 | $13,814,377J. LEE MILLIGAN, INC. | +21.9% |
| Feb 6, 2019 | 0158-01-082 | ACP OVERLAYRunnels · San Angelo | 1 of 3 | $16,352,620 | $16,352,620 | Won |
| Jan 9, 2019 | 0139-05-043 | ROADWAY REHABILITATIONReeves · Odessa | 3 of 4 | $24,531,067 | $18,885,091FNF CONSTRUCTION, INC. | +29.9% |
| Jan 9, 2019 | 0275-04-052 | ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING.Carson · Amarillo | 1 of 5 | $8,012,745 | $8,012,745 | Won |
| Jan 8, 2019 | 0238-02-038 | CONVERT TO SUPER 2 HIGHWAYHartley · Amarillo | 3 of 5 | $39,131,012 | $35,223,787J. LEE MILLIGAN, INC. | +11.1% |
| Nov 6, 2018 | 0490-03-028 | BASE REPAIR AND OVERLAYOchiltree · | 4 of 5 | $14,788,188 | $13,090,322J. LEE MILLIGAN, INC. | +13.0% |
| Oct 3, 2018 | 0169-03-036 | EBL - FULL DEPTH REPAIR, MILL AND FILLCarson · Amarillo | 4 of 6 | $17,738,936 | $16,196,034RK HALL, LLC | +9.5% |
| Oct 2, 2018 | 0004-02-058 | RECONSTRUCT PAVEMENTWard · Odessa | 4 of 5 | $27,794,811 | $24,141,875JONES BROS. DIRT & PAVING C… | +15.1% |
| Oct 2, 2018 | 0275-05-044 | OVERLAYGray · Amarillo | 1 of 5 | $16,401,397 | $16,401,397 | Won |
| Sep 7, 2018 | 0275-03-066 | EBL - MILL, REHAB AND OVERLAYCarson · Amarillo | 2 of 5 | $16,019,662 | $15,103,094GILVIN-TERRILL, LTD. | +6.1% |
| Sep 7, 2018 | 0042-03-042 | OVERLAYArmstrong · Amarillo | 1 of 6 | $6,591,548 | $6,591,548 | Won |
| Sep 6, 2018 | 0441-07-071 | RECONSTRUCT PAVEMENTPecos · Odessa | 2 of 5 | $7,791,633 | $6,847,259FNF CONSTRUCTION, INC. | +13.8% |
| Aug 7, 2018 | 0493-02-015 | ROADWAY RESTORATIONLoving · | 4 of 4 | $23,259,623 | $19,243,862JOHNSON BROS. CORPORATION, … | +20.9% |
| Jul 11, 2018 | 0463-04-026 | ACP OVERLAYGlasscock · San Angelo | 3 of 5 | $21,415,157 | $20,119,919RK HALL, LLC | +6.4% |
| Jun 6, 2018 | 0169-08-024 | THICK OVERLAY,JOINT REPAIR,MBGF,RUMBLE STRIPSRoberts · | 4 of 5 | $15,877,959 | $13,340,742J. LEE MILLIGAN, INC. | +19.0% |
| Jun 6, 2018 | 0124-05-029 | ADD SHOULDERSBaylor · Wichita Falls | 2 of 4 | $6,594,749 | $6,427,096A. L. HELMCAMP, INC. | +2.6% |
| Jun 6, 2018 | 0043-09-135 | MILL & OVERLAYWichita · Wichita Falls | 3 of 3 | $10,445,062 | $8,831,585ZACK BURKETT CO. | +18.3% |
| Jun 5, 2018 | 0461-08-023 | REHABILITATIONYoakum · | 4 of 7 | $46,093,075 | $39,748,231JAMES HAMILTON CONSTRUCTION… | +16.0% |
| Jun 5, 2018 | 0227-06-026 | REHABILITATIONHockley · Lubbock | 5 of 6 | $30,552,821 | $27,611,674A. L. HELMCAMP, INC. | +10.7% |
| May 2, 2018 | 0229-03-035 | WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAYCrane · Odessa | 6 of 6 | $29,852,104 | $20,285,449DELHUR INDUSTRIES, INC. | +47.2% |
| May 2, 2018 | 0626-01-007 | REHAB PARK ROADS,PARKING LOTS AND CAMPSITEReeves · Odessa | 4 of 4 | $838,356 | $560,740FNH CONSTRUCTION, LLC | +49.5% |
| May 2, 2018 | 1639-01-014 | ROADWAY REHABILITATIONReeves · Odessa | 5 of 5 | $14,096,783 | $10,632,822JONES BROS. DIRT & PAVING C… | +32.6% |
| May 2, 2018 | 0040-01-050 | OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPINGDallam · Amarillo | 1 of 6 | $10,092,336 | $10,092,336 | Won |
| May 1, 2018 | 0168-01-029 | REHABILITATION OF EXISTING ROADWAYParmer · Lubbock | 3 of 8 | $18,940,287 | $17,450,676J. LEE MILLIGAN, INC. | +8.5% |
| Apr 4, 2018 | 0226-06-032 | REHABILITATIONCastro · Lubbock | 6 of 6 | $23,918,523 | $15,741,047J. LEE MILLIGAN, INC. | +52.0% |
| Apr 4, 2018 | 0066-05-066 | THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,HSIP IMPROVEMoore · Amarillo | 5 of 6 | $11,404,354 | $11,242,986HIGHWAY CONTRACTORS, INC. | +1.4% |
| Feb 2, 2018 | 0169-05-042 | REHAB EXISTING ROADWAYCarson · Amarillo | 6 of 6 | $12,364,264 | $10,873,603RK HALL, LLC | +13.7% |
| Nov 2, 2017 | 0141-08-047 | HOT RECYCLE AND ACP OVERLAYKimble · San Angelo | 8 of 8 | $8,799,266 | $6,324,554LONE STAR PAVING COMPANY | +39.1% |
| Oct 4, 2017 | 0169-04-036 | FULL DEPTH RECLAMATION,PLANING,HOTMIX&PAV MARKINGSCarson · Amarillo | 3 of 8 | $11,690,427 | $11,057,967RK HALL, LLC | +5.7% |
| Sep 7, 2017 | 0035-06-032 | ADD PASSING LANESMenard · San Angelo | 5 of 7 | $7,933,861 | $5,814,759ALLEN KELLER COMPANY | +36.4% |
| Aug 9, 2017 | 0104-10-006 | NEW TWO-LANE TWIN BRIDGE STRUCTUREPresidio · El Paso | 4 of 4 | $9,052,159 | $6,854,363EARTH BUILDERS, L.P. | +32.1% |
| Aug 8, 2017 | 0139-03-039 | ROADWAY WIDENING TO A MODIFIED SUPER 2Reeves · Odessa | 5 of 8 | $18,409,128 | $15,005,109FNF CONSTRUCTION, INC. | +22.7% |
| Aug 8, 2017 | 0327-10-057 | CONSTRUCT MAINLANES & OVERPASSWillacy · Pharr | 3 of 3 | $32,343,651 | $22,671,108FOREMOST PAVING, INC. | +42.7% |
| Jul 12, 2017 | 0605-01-060 | REPLACE SWING BRIDGEMatagorda · Yoakum | 7 of 9 | $57,531,361 | $41,231,131AUSTIN BRIDGE & ROAD SERVIC… | +39.5% |
| Jul 12, 2017 | 0266-08-011 | CONSTRUCT NEW BRIDGE AND APPROACHESColorado · Yoakum | 2 of 3 | $13,193,902 | $10,459,589ISI CONTRACTING, INC. | +26.1% |
| Jul 12, 2017 | 0005-13-056 | UPGRADE BRIDGE AND APPROACH RAILINGEctor · Odessa | 2 of 3 | $4,897,142 | $3,958,979SCR CIVIL CONSTRUCTION, LLC | +23.7% |
| Jul 12, 2017 | 0140-11-044 | PLANE, EMULSION TREAT, SURFACE TREATMENT & OVERLAYCrockett · San Angelo | 6 of 6 | $5,646,248 | $4,567,929REECE ALBERT, INC. | +23.6% |
| Dec 1, 2016 | 0043-17-030 | OVERLAYWichita · Wichita Falls | 4 of 4 | $5,573,340 | $3,440,614ZACK BURKETT CO. | +62.0% |
| Dec 1, 2016 | 2451-03-015 | BRIDGE REPLACEMENTReeves · Odessa | 6 of 7 | $6,172,768 | $3,793,865LESNA CONSTRUCTION, INC. | +62.7% |
| Nov 4, 2016 | 0004-04-087 | UPGRADES TO MEET FREEWAY STANDARDSWard · Odessa | 3 of 4 | $14,714,677 | $13,195,417JONES BROS. DIRT & PAVING C… | +11.5% |
| Oct 9, 2013 | 0405-02-024 | WIDEN ROADWAY TO 4-LANE UNDIVIDEDSterling · San Angelo | 3 of 3 | $22,972,320 | $22,606,154PRICE CONSTRUCTION, LTD. | +1.6% |
| Oct 8, 2013 | 2182-02-008 | REHABILITATION OF EXISTING ROADHockley · Lubbock | 3 of 3 | $4,987,087 | $3,762,235ALLEN BUTLER CONSTRUCTION, … | +32.6% |
| Oct 8, 2013 | 0405-01-024 | GRADING, BASE, STRUCTURES, SURFACINGGlasscock · San Angelo | 3 of 4 | $20,660,318 | $19,242,154REECE ALBERT, INC. | +7.4% |
| Oct 8, 2013 | 2444-01-009 | REHABILITATION OF EXISTING ROADParmer · Lubbock | 3 of 3 | $5,257,733 | $3,262,224GILVIN-TERRILL, LTD. | +61.2% |
| Sep 11, 2013 | 0052-03-029 | MILL, CEMENT STABILIZE, TY B HOTMIX, SMABailey · Lubbock | 4 of 5 | $17,699,965 | $15,399,876DUININCK, INC. | +14.9% |
Active prime contracts 2
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6484-76-001Let Jul 2, 2025 | ParkerFort Worth · IH0020 | MAINTENANCE | $934,000 | 48% | |
| 0140-13-020Let Feb 6, 2025 | CrockettSan Angelo · IH 10 | OVERLAY | $23,734,597 | 102% |
Subcontracts on active jobs 1
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0008-03-133Let May 3, 2024 | ZACHRY CONSTRUCTION CORPORATION | ParkerFort Worth | UPGRADE TO STANDARDS FREEWAY | 23.47% | $23,835,572 |