| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$100,000.00 |
$275,827.00 |
$398,170.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,470 | CY |
$18.00 |
$75.00 |
$30.00 |
$28.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,554 | CY |
$20.00 |
$75.00 |
$30.00 |
$77.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$16,500.00 |
$5,000.00 |
$10,000.00 |
$17,880.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$9.00 |
$22.00 |
$16.57 |
$50.00 |
| 6 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 240 | CY |
$65.00 |
$200.00 |
$125.00 |
$94.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,782 | SY |
$3.00 |
$5.00 |
$3.87 |
$4.00 |
| 8 | 232(A) 2813 |
SEEDING METHOD A | 1.19 | AC |
$2,500.00 |
$5,200.00 |
$3,866.84 |
$4,130.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.19 | AC |
$500.00 |
$3,000.00 |
$2,209.62 |
$2,360.00 |
| 10 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,200.00 |
$18,000.00 |
$1,794.35 |
$15,050.00 |
| 11 | 509(B) 0321 |
CLASS A CONCRETE | 3,860 | CY |
$500.00 |
$700.00 |
$700.00 |
$659.00 |
| 12 | 511(A) 0332 |
REINFORCING STEEL | 591,000 | LB |
$1.05 |
$1.50 |
$1.14 |
$1.10 |
| 13 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,248 | TON |
$50.00 |
$100.00 |
$61.00 |
$86.00 |
| 14 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 167 | TON |
$45.00 |
$64.00 |
$50.00 |
$55.00 |
| 15 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 16 | LF |
$130.00 |
$240.00 |
$180.00 |
$105.00 |
| 16 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,300 | LF |
$14.00 |
$40.00 |
$15.00 |
$42.00 |
| 17 | 613(I) 1094 |
4" NON-PERF.PIPE UNDERDRAIN RND. | 260 | LF |
$10.00 |
$20.00 |
$35.00 |
$30.00 |
| 18 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 110 | LF |
$18.00 |
$24.00 |
$15.00 |
$46.00 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$5,000.00 |
$75,000.00 |
$109,945.00 |
| 20 | 619(B) 5113 |
REMOVAL OF RIPRAP | 9,694 | SY |
$15.00 |
$15.00 |
$15.00 |
$24.00 |
| 21 | 624(E) 4293 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 678 | LF |
$20.00 |
$39.00 |
$23.00 |
$32.00 |
| 22 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$23,000.00 |
$55,240.63 |
$35,415.00 |
| 23 | 504(A) 1304 |
APPROACH SLAB | 11.6 | SY |
$260.00 |
$430.00 |
$883.85 |
$945.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 54.16 | LF |
$275.00 |
$280.00 |
$497.17 |
$530.00 |
| 25 | 504(E) 1381 |
CONCRETE PARAPET | 16 | LF |
$280.00 |
$280.00 |
$552.41 |
$590.00 |
| 26 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 125 | LF |
$25.00 |
$37.00 |
$36.46 |
$39.00 |
| 27 | 506(A) 1322 |
STRUCTURAL STEEL | 35 | LB |
$3.00 |
$31.00 |
$11.05 |
$12.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,200.00 |
$3,100.00 |
$5,524.06 |
$5,900.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 3 | CY |
$1,500.00 |
$3,700.00 |
$2,405.18 |
$2,570.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 48 | CY |
$800.00 |
$470.00 |
$994.33 |
$1,065.00 |
| 31 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 50 | LB |
$1.20 |
$3.00 |
$1.10 |
$1.20 |
| 32 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 34 | SY |
$400.00 |
$280.00 |
$497.17 |
$415.00 |
| 33 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 11.6 | SY |
$600.00 |
$1,200.00 |
$1,988.66 |
$1,890.00 |
| 34 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 9.5 | SY |
$4.00 |
$18.00 |
$16.57 |
$18.00 |
| 35 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 28 | LF |
$38.00 |
$57.00 |
$23.20 |
$25.00 |
| 36 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$105.00 |
$150.00 |
$88.39 |
$95.00 |
| 37 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$700.00 |
$1,000.00 |
$800.99 |
$855.00 |
| 38 | 523(A) 6550 |
SEALER CRACK PREPARATION | 52.2 | LF |
$4.00 |
$7.50 |
$5.52 |
$6.00 |
| 39 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$150.00 |
$300.00 |
$55.25 |
$59.00 |
| 40 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 24 | SY |
$60.00 |
$45.00 |
$49.72 |
$53.00 |
| 41 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$4,500.00 |
$2,000.00 |
$16,572.19 |
$17,700.00 |
| 42 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$44,192.50 |
$23,610.00 |
| 43 | 619(C) 0924 |
SAWING PAVEMENT | 125 | LF |
$12.00 |
$12.00 |
$7.73 |
$8.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 32.8 | SY |
$260.00 |
$430.00 |
$883.85 |
$945.00 |
| 45 | 504(C) 6250 |
SEALED EXPANSION JOINT | 133.91 | LF |
$275.00 |
$280.00 |
$497.17 |
$530.00 |
| 46 | 504(E) 1381 |
CONCRETE PARAPET | 32 | LF |
$280.00 |
$280.00 |
$524.79 |
$560.00 |
| 47 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 350 | LF |
$25.00 |
$37.00 |
$36.46 |
$39.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 1 | CY |
$1,500.00 |
$3,700.00 |
$2,405.18 |
$2,570.00 |
| 49 | 509(B) 1328 |
CLASS A CONCRETE | 375 | CY |
$600.00 |
$470.00 |
$994.33 |
$1,065.00 |
| 50 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 50 | LB |
$1.20 |
$2.00 |
$1.10 |
$1.20 |
| 51 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 81 | SY |
$400.00 |
$280.00 |
$497.17 |
$415.00 |
| 52 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 98.8 | SY |
$600.00 |
$1,200.00 |
$1,988.66 |
$1,890.00 |
| 53 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 22.4 | SY |
$4.00 |
$18.00 |
$16.57 |
$18.00 |
| 54 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 60 | LF |
$38.00 |
$57.00 |
$23.20 |
$25.00 |
| 55 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$105.00 |
$150.00 |
$88.39 |
$95.00 |
| 56 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$700.00 |
$1,000.00 |
$800.99 |
$855.00 |
| 57 | 523(A) 6550 |
SEALER CRACK PREPARATION | 523.4 | LF |
$4.00 |
$7.50 |
$5.52 |
$6.00 |
| 58 | 523(B) 6560 |
SEALER RESIN | 4 | GAL |
$150.00 |
$300.00 |
$55.24 |
$59.00 |
| 59 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2.4 | SY |
$60.00 |
$45.00 |
$49.72 |
$53.00 |
| 60 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$19,000.00 |
$66,288.75 |
$56,670.00 |
| 61 | 619(C) 0924 |
SAWING PAVEMENT | 350 | LF |
$12.00 |
$12.00 |
$5.52 |
$6.00 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 3.4 | CY |
$345.00 |
$250.00 |
$718.13 |
$770.00 |
| 63 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$88,385.00 |
$70,830.00 |
| 64 | 504(A) 1304 |
APPROACH SLAB | 38.1 | SY |
$260.00 |
$430.00 |
$939.09 |
$1,005.00 |
| 65 | 504(C) 6250 |
SEALED EXPANSION JOINT | 169.66 | LF |
$275.00 |
$280.00 |
$497.17 |
$530.00 |
| 66 | 504(E) 1381 |
CONCRETE PARAPET | 32 | LF |
$280.00 |
$280.00 |
$524.79 |
$560.00 |
| 67 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 450 | LF |
$25.00 |
$37.00 |
$36.46 |
$39.00 |
| 68 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$7,000.00 |
$6,628.88 |
$7,085.00 |
| 69 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,200.00 |
$3,100.00 |
$4,971.66 |
$5,315.00 |
| 70 | 509(A) 1326 |
CLASS AA CONCRETE | 10 | CY |
$800.00 |
$3,700.00 |
$2,405.18 |
$2,570.00 |
| 71 | 509(B) 1328 |
CLASS A CONCRETE | 130 | CY |
$650.00 |
$500.00 |
$994.33 |
$1,065.00 |
| 72 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 100 | LB |
$1.15 |
$2.00 |
$1.10 |
$1.20 |
| 73 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 105 | SY |
$400.00 |
$280.00 |
$497.17 |
$415.00 |
| 74 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 114.2 | SY |
$600.00 |
$1,200.00 |
$1,988.66 |
$1,890.00 |
| 75 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 22.4 | SY |
$4.00 |
$18.00 |
$16.57 |
$18.00 |
| 76 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 208 | LF |
$38.00 |
$57.00 |
$23.20 |
$25.00 |
| 77 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3 | GAL |
$105.00 |
$150.00 |
$88.39 |
$95.00 |
| 78 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 206 | SY |
$700.00 |
$720.00 |
$718.13 |
$765.00 |
| 79 | 523(A) 6550 |
SEALER CRACK PREPARATION | 664.9 | LF |
$4.00 |
$7.50 |
$5.52 |
$6.00 |
| 80 | 523(B) 6560 |
SEALER RESIN | 5.1 | GAL |
$150.00 |
$300.00 |
$55.24 |
$59.00 |
| 81 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 247.2 | SY |
$60.00 |
$45.00 |
$38.67 |
$41.00 |
| 82 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$4,500.00 |
$2,000.00 |
$11,048.13 |
$11,805.00 |
| 83 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 2 | EA |
$3,500.00 |
$6,100.00 |
$8,838.50 |
$9,445.00 |
| 84 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$21,000.00 |
$66,288.75 |
$56,700.00 |
| 85 | 619(C) 0924 |
SAWING PAVEMENT | 450 | LF |
$12.00 |
$12.00 |
$5.52 |
$6.00 |
| 86 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 7,000 | LF |
$1.00 |
$1.50 |
$1.10 |
$0.8500 |
| 87 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,700 | LF |
$1.50 |
$2.00 |
$1.66 |
$1.75 |
| 88 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 4,500 | LF |
$3.50 |
$3.00 |
$2.21 |
$1.75 |
| 89 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 1 | EA |
$8,500.00 |
$37,000.00 |
$10,932.12 |
$11,680.00 |
| 90 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 19,200 | LF |
$1.00 |
$1.00 |
$0.8300 |
$0.8500 |
| 91 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 15,200 | LF |
$0.2500 |
$0.2000 |
$0.1100 |
$0.2500 |
| 92 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 798 | SD |
$0.5000 |
$4.50 |
$3.31 |
$1.20 |
| 93 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 375 | LF |
$27.00 |
$15.00 |
$15.00 |
$62.00 |
| 94 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,125 | LF |
$5.00 |
$3.50 |
$15.00 |
$14.00 |
| 95 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 132 | SD |
$6.00 |
$7.00 |
$5.52 |
$6.00 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,566 | SD |
$1.00 |
$0.7000 |
$0.5500 |
$0.2500 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,272 | SD |
$1.50 |
$1.50 |
$1.10 |
$0.2500 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,628 | SD |
$2.00 |
$3.00 |
$2.21 |
$2.35 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 546 | SD |
$2.00 |
$2.00 |
$1.66 |
$7.00 |
| 100 | 880(C) 8848 |
WING BARRICADES | 168 | SD |
$1.10 |
$4.50 |
$3.31 |
$30.00 |
| 101 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,998 | SD |
$0.3000 |
$0.5000 |
$0.3900 |
$6.00 |
| 102 | 880(F) 8878 |
DRUMS | 7,812 | SD |
$0.4000 |
$0.6000 |
$0.5000 |
$0.1500 |
| 103 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 10 | HOUR |
$80.00 |
$100.00 |
$82.02 |
$110.00 |
| 104 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 504 | SD |
$20.00 |
$21.00 |
$16.57 |
$18.00 |
| 105 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,400.00 |
$66,000.00 |
$35,000.00 |
$46,040.00 |
| 106 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,700.00 |
$20,000.00 |
$11,325.00 |
| 107 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$145,000.00 |
$221,000.00 |
$338,000.00 |
$280,310.00 |