| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$6,000.00 |
$4,000.00 |
$8,500.00 |
$20,000.00 |
$8,551.06 |
$12,500.00 |
$9,305.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,910 | CY |
$7.50 |
$9.55 |
$8.00 |
$8.50 |
$10.00 |
$8.30 |
$9.50 |
$10.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,182 | CY |
$12.50 |
$9.25 |
$10.00 |
$8.00 |
$12.00 |
$14.68 |
$12.25 |
$16.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 720 | LF |
$2.00 |
$1.30 |
$1.66 |
$2.90 |
$1.82 |
$2.23 |
$2.00 |
$1.80 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 150 | LF |
$5.00 |
$6.85 |
$8.25 |
$14.00 |
$9.00 |
$10.85 |
$10.00 |
$9.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 5,620 | SY |
$2.50 |
$1.85 |
$1.72 |
$2.50 |
$1.89 |
$3.77 |
$2.10 |
$1.90 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.01 | AC |
$600.00 |
$150.00 |
$200.00 |
$150.00 |
$220.00 |
$759.39 |
$200.00 |
$218.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 780 | TON |
$35.00 |
$29.20 |
$30.00 |
$34.50 |
$30.00 |
$39.56 |
$47.00 |
$46.50 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$245.00 |
$300.00 |
$300.00 |
$400.00 |
$216.97 |
$200.00 |
$630.00 |
| 10 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 34 | LF |
$32.00 |
$22.00 |
$35.00 |
$22.75 |
$35.00 |
$27.57 |
$33.00 |
$65.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 36 | LF |
$40.00 |
$28.00 |
$45.00 |
$28.00 |
$45.00 |
$40.14 |
$44.00 |
$69.50 |
| 12 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 96 | LF |
$55.00 |
$78.00 |
$100.00 |
$122.00 |
$55.00 |
$57.43 |
$58.00 |
$84.50 |
| 13 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$225.00 |
$250.00 |
$165.00 |
$185.00 |
$606.24 |
$825.00 |
$682.00 |
| 14 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$750.00 |
$250.00 |
$300.00 |
$195.00 |
$245.00 |
$644.53 |
$1,045.00 |
$726.00 |
| 15 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,300.00 |
$470.00 |
$700.00 |
$475.00 |
$500.00 |
$765.77 |
$1,650.00 |
$1,015.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,550.00 |
$1,000.00 |
$3,000.00 |
$3,000.00 |
$957.21 |
$3,300.00 |
$3,990.00 |
| 17 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,485.00 |
$1,650.00 |
$1,980.00 |
$1,500.00 |
$2,297.30 |
$1,485.00 |
$1,475.00 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,485.00 |
$1,450.00 |
$1,800.00 |
$1,500.00 |
$2,814.83 |
$1,485.00 |
$1,475.00 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$15.00 |
$7.50 |
$15.00 |
$12.50 |
$15.00 |
$15.95 |
$17.50 |
$16.00 |
| 20 | 501(F) 6352 |
GRANULAR BACKFILL | 102 | CY |
$65.00 |
$58.00 |
$70.00 |
$50.00 |
$70.00 |
$26.80 |
$80.00 |
$70.00 |
| 21 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$235.00 |
$234.00 |
$260.00 |
$238.00 |
$215.00 |
$271.68 |
$280.00 |
$231.00 |
| 22 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$80.00 |
$72.50 |
$75.00 |
$78.00 |
$70.00 |
$91.13 |
$110.00 |
$83.50 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 690 | LB |
$4.00 |
$2.10 |
$2.50 |
$1.85 |
$3.00 |
$2.71 |
$4.00 |
$5.70 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,300.00 |
$750.00 |
$900.00 |
$500.00 |
$700.00 |
$938.55 |
$1,200.00 |
$1,065.00 |
| 25 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,600.00 |
$750.00 |
$900.00 |
$500.00 |
$700.00 |
$938.55 |
$1,200.00 |
$1,065.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 86.1 | CY |
$650.00 |
$610.00 |
$550.00 |
$600.00 |
$650.00 |
$701.95 |
$730.00 |
$663.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$650.00 |
$628.00 |
$550.00 |
$550.00 |
$650.00 |
$484.99 |
$610.00 |
$744.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 35,130 | LB |
$0.9500 |
$0.8000 |
$0.8000 |
$1.00 |
$0.7200 |
$0.4300 |
$0.9000 |
$1.30 |
| 29 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 80 | LF |
$32.00 |
$30.80 |
$28.00 |
$24.00 |
$30.00 |
$23.14 |
$55.00 |
$36.00 |
| 30 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,191 | LF |
$35.00 |
$24.50 |
$29.00 |
$23.40 |
$30.00 |
$29.20 |
$44.00 |
$29.50 |
| 31 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 80 | LF |
$12.00 |
$13.20 |
$10.00 |
$12.00 |
$15.00 |
$18.51 |
$22.00 |
$18.50 |
| 32 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,191 | LF |
$14.00 |
$10.50 |
$10.00 |
$10.00 |
$15.00 |
$18.51 |
$22.00 |
$21.50 |
| 33 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 34 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 561 | TON |
$38.00 |
$41.55 |
$47.00 |
$41.00 |
$45.00 |
$51.05 |
$58.00 |
$46.00 |
| 35 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 153 | TON |
$35.00 |
$31.40 |
$37.00 |
$39.00 |
$35.00 |
$29.35 |
$46.00 |
$36.50 |
| 36 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$25.00 |
$30.00 |
$30.00 |
$54.00 |
$25.00 |
$25.53 |
$20.00 |
$34.50 |
| 37 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$30.00 |
$25.00 |
$25.00 |
$25.00 |
$26.80 |
$20.00 |
$21.00 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$10,000.00 |
$16,500.00 |
$25,000.00 |
$5,105.11 |
$20,000.00 |
$12,770.00 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,500.00 |
$3,150.00 |
$2,640.00 |
$3,500.00 |
$2,900.00 |
$3,343.85 |
$3,950.00 |
$1,060.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,000.00 |
$5,300.00 |
$5,200.00 |
$5,500.00 |
$5,200.00 |
$6,636.64 |
$5,100.00 |
$5,675.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,750.00 |
$1,200.00 |
$2,200.00 |
$4,000.00 |
$12,571.34 |
$4,500.00 |
$3,140.00 |
| 42 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$29,500.00 |
$50,000.00 |
$48,000.00 |
$30,000.00 |
$59,916.12 |
$20,000.00 |
$63,978.22 |