| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,250 | CY |
$10.00 |
$18.27 |
$26.00 |
$11.50 |
$26.63 |
$5.50 |
$13.20 |
$10.00 |
$22.20 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,038 | CY |
$16.25 |
$31.32 |
$34.00 |
$21.00 |
$31.95 |
$11.00 |
$17.60 |
$20.00 |
$40.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,420.00 |
$6,526.00 |
$14,000.00 |
$7,000.00 |
$7,987.50 |
$5,500.00 |
$11,000.00 |
$15,000.00 |
$20,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.00 |
$2.02 |
$2.00 |
$4.50 |
$1.65 |
$4.40 |
$1.71 |
$1.99 |
$2.00 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$245.00 |
$130.52 |
$200.00 |
$450.00 |
$106.50 |
$440.00 |
$110.00 |
$325.00 |
$500.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,906 | SY |
$2.80 |
$2.15 |
$1.90 |
$2.40 |
$1.76 |
$2.20 |
$1.82 |
$2.38 |
$2.07 |
| 7 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,556 | SY |
$7.60 |
$6.45 |
$7.50 |
$5.50 |
$10.65 |
$5.80 |
$7.15 |
$4.75 |
$10.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 280 | TON |
$40.00 |
$48.55 |
$40.00 |
$36.00 |
$42.60 |
$60.50 |
$41.80 |
$45.00 |
$40.00 |
| 9 | 407(B) 0250 |
TACK COAT | 1,030 | GAL |
$4.00 |
$3.92 |
$3.30 |
$4.50 |
$3.20 |
$3.30 |
$3.30 |
$3.45 |
$5.00 |
| 10 | 408 5774 |
PRIME COAT | 1,246 | GAL |
$5.80 |
$4.57 |
$3.85 |
$12.00 |
$3.20 |
$9.20 |
$3.85 |
$4.00 |
$5.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,534 | TON |
$92.00 |
$88.10 |
$74.25 |
$85.00 |
$95.00 |
$55.00 |
$74.25 |
$77.50 |
$80.00 |
| 12 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 520 | TON |
$100.00 |
$140.96 |
$118.80 |
$156.00 |
$120.00 |
$113.00 |
$118.80 |
$124.00 |
$110.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 852 | TON |
$96.00 |
$126.60 |
$106.70 |
$146.00 |
$110.00 |
$93.00 |
$106.70 |
$111.00 |
$100.00 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 2,856 | SY |
$5.00 |
$6.53 |
$9.00 |
$13.50 |
$5.33 |
$7.80 |
$8.80 |
$2.45 |
$8.00 |
| 15 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 1,240 | LF |
$2.30 |
$6.53 |
$1.10 |
$1.25 |
$1.07 |
$1.10 |
$6.60 |
$1.72 |
$9.50 |
| 16 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,040 | LF |
$28.50 |
$23.49 |
$30.00 |
$48.00 |
$23.91 |
$44.00 |
$31.41 |
$26.00 |
$30.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,556 | SY |
$5.00 |
$4.57 |
$5.00 |
$11.50 |
$5.00 |
$9.00 |
$6.05 |
$10.35 |
$6.00 |
| 18 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$2,010.01 |
$2,475.00 |
$2,900.00 |
$2,396.25 |
$2,470.00 |
$2,678.50 |
$2,600.00 |
$2,435.00 |
| 19 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 600 | LF |
$9.92 |
$19.25 |
$12.34 |
$12.00 |
$11.95 |
$12.50 |
$11.00 |
$13.00 |
$10.00 |
| 20 | 501(F) 6352 |
GRANULAR BACKFILL | 50 | CY |
$52.00 |
$43.07 |
$80.00 |
$120.00 |
$78.39 |
$114.00 |
$137.76 |
$52.00 |
$73.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 10 | CY |
$250.00 |
$215.36 |
$205.00 |
$185.00 |
$200.00 |
$307.00 |
$610.15 |
$173.00 |
$200.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$210.00 |
$234.94 |
$210.00 |
$218.00 |
$200.00 |
$221.00 |
$233.74 |
$200.00 |
$200.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 710 | SY |
$6.00 |
$9.14 |
$5.06 |
$9.00 |
$4.90 |
$5.10 |
$5.52 |
$5.25 |
$4.60 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 39 | LF |
$260.00 |
$326.30 |
$266.00 |
$275.00 |
$230.48 |
$271.00 |
$309.66 |
$300.00 |
$330.00 |
| 25 | 504(E) 6190 |
42" F-SHAPED PARAPET | 336 | LF |
$90.00 |
$97.89 |
$104.40 |
$125.00 |
$150.00 |
$128.00 |
$125.15 |
$100.00 |
$120.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 65,170 | LB |
$2.40 |
$2.44 |
$1.96 |
$2.15 |
$1.68 |
$2.10 |
$2.27 |
$2.01 |
$4.50 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$800.00 |
$776.60 |
$1,150.00 |
$950.00 |
$650.00 |
$765.00 |
$1,515.90 |
$700.00 |
$1,600.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$850.00 |
$776.59 |
$1,150.00 |
$950.00 |
$650.00 |
$765.00 |
$1,515.90 |
$700.00 |
$1,600.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 114.6 | CY |
$700.00 |
$717.86 |
$820.00 |
$877.00 |
$825.00 |
$777.00 |
$1,076.58 |
$1,420.00 |
$1,100.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 12.4 | CY |
$1,100.00 |
$1,892.54 |
$2,800.00 |
$1,250.00 |
$5,000.00 |
$4,910.00 |
$2,576.58 |
$4,000.00 |
$3,000.00 |
| 31 | 510(C) 6137 |
SLOPE WALL (4") | 131 | SY |
$75.00 |
$52.21 |
$155.00 |
$68.00 |
$250.00 |
$143.00 |
$102.62 |
$70.00 |
$160.00 |
| 32 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 32,930 | LB |
$1.15 |
$0.9300 |
$1.06 |
$1.00 |
$1.08 |
$1.30 |
$1.36 |
$0.8800 |
$1.50 |
| 33 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 436 | SY |
$4.50 |
$3.07 |
$4.00 |
$5.00 |
$3.30 |
$3.40 |
$3.72 |
$4.00 |
$3.65 |
| 34 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$650.00 |
$901.63 |
$863.50 |
$900.00 |
$735.70 |
$760.00 |
$942.00 |
$700.00 |
$690.00 |
| 35 | 523(A) 6550 |
SEALER CRACK PREPARATION | 38 | LF |
$5.30 |
$46.99 |
$4.20 |
$6.00 |
$4.26 |
$4.40 |
$4.80 |
$5.00 |
$4.00 |
| 36 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$155.00 |
$208.83 |
$160.00 |
$240.00 |
$159.75 |
$165.00 |
$180.00 |
$175.00 |
$150.00 |
| 37 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$15,000.00 |
$8,614.33 |
$10,000.00 |
$7,500.00 |
$10,241.74 |
$11,250.00 |
$12,000.00 |
$10,000.00 |
$10,000.00 |
| 38 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$15,000.00 |
$13,052.01 |
$10,000.00 |
$7,500.00 |
$4,500.00 |
$11,250.00 |
$14,400.00 |
$10,000.00 |
$5,000.00 |
| 39 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$25,000.00 |
$44,376.83 |
$45,000.00 |
$37,500.00 |
$57,776.79 |
$47,850.00 |
$96,000.00 |
$125,000.00 |
$80,000.00 |
| 40 | 619(B) 2540 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 1 | LSUM |
$5,000.00 |
$4,307.16 |
$9,000.00 |
$3,700.00 |
$5,000.00 |
$6,210.00 |
$9,000.00 |
$50,000.00 |
$4,000.00 |
| 41 | 501(F) 6352 |
GRANULAR BACKFILL | 10 | CY |
$52.00 |
$43.07 |
$80.00 |
$120.00 |
$78.45 |
$114.00 |
$167.70 |
$53.00 |
$73.00 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$250.00 |
$215.36 |
$205.00 |
$185.00 |
$200.00 |
$481.00 |
$610.15 |
$175.00 |
$200.00 |
| 43 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$210.00 |
$234.94 |
$210.00 |
$218.00 |
$200.00 |
$221.00 |
$233.74 |
$200.00 |
$200.00 |
| 44 | 504(B) 1305 |
SAW-CUT GROOVING | 710 | SY |
$6.00 |
$9.14 |
$5.06 |
$9.00 |
$4.90 |
$5.10 |
$5.52 |
$5.25 |
$4.60 |
| 45 | 504(C) 6250 |
SEALED EXPANSION JOINT | 39 | LF |
$260.00 |
$379.81 |
$266.00 |
$275.00 |
$230.48 |
$254.00 |
$309.66 |
$300.00 |
$330.00 |
| 46 | 504(E) 6190 |
42" F-SHAPED PARAPET | 336 | LF |
$90.00 |
$97.89 |
$104.40 |
$125.00 |
$150.00 |
$128.00 |
$125.15 |
$100.00 |
$120.00 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 65,170 | LB |
$2.40 |
$2.44 |
$1.96 |
$2.15 |
$1.68 |
$2.10 |
$2.87 |
$2.11 |
$4.50 |
| 48 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$800.00 |
$776.60 |
$1,150.00 |
$950.00 |
$650.00 |
$765.00 |
$1,095.90 |
$700.00 |
$1,600.00 |
| 49 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$850.00 |
$776.59 |
$1,150.00 |
$950.00 |
$650.00 |
$765.00 |
$855.90 |
$700.00 |
$1,600.00 |
| 50 | 509(A) 1326 |
CLASS AA CONCRETE | 114.6 | CY |
$700.00 |
$717.86 |
$820.00 |
$877.00 |
$825.00 |
$777.00 |
$956.58 |
$1,420.00 |
$1,100.00 |
| 51 | 509(B) 1328 |
CLASS A CONCRETE | 12.4 | CY |
$1,100.00 |
$1,892.54 |
$2,800.00 |
$1,250.00 |
$5,000.00 |
$4,910.00 |
$2,336.58 |
$4,000.00 |
$3,000.00 |
| 52 | 510(C) 6137 |
SLOPE WALL (4") | 131 | SY |
$75.00 |
$52.21 |
$155.00 |
$68.00 |
$250.00 |
$143.00 |
$102.62 |
$70.00 |
$160.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 32,930 | LB |
$1.15 |
$0.9300 |
$1.06 |
$1.00 |
$1.08 |
$1.30 |
$1.42 |
$0.8800 |
$1.50 |
| 54 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 436 | SY |
$4.50 |
$3.07 |
$4.00 |
$5.00 |
$3.30 |
$3.40 |
$3.72 |
$4.00 |
$3.65 |
| 55 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$650.00 |
$901.63 |
$863.50 |
$900.00 |
$735.70 |
$760.00 |
$942.00 |
$700.00 |
$690.00 |
| 56 | 523(A) 6550 |
SEALER CRACK PREPARATION | 38 | LF |
$5.30 |
$46.99 |
$4.20 |
$6.00 |
$4.26 |
$4.40 |
$4.80 |
$5.00 |
$4.00 |
| 57 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$155.00 |
$195.78 |
$160.00 |
$240.00 |
$159.75 |
$165.00 |
$180.00 |
$175.00 |
$150.00 |
| 58 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$15,000.00 |
$8,614.33 |
$10,000.00 |
$7,500.00 |
$3,529.28 |
$11,250.00 |
$10,200.00 |
$10,000.00 |
$10,000.00 |
| 59 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$15,000.00 |
$13,052.01 |
$10,000.00 |
$7,500.00 |
$4,500.00 |
$11,250.00 |
$18,000.00 |
$10,000.00 |
$5,000.00 |
| 60 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$25,000.00 |
$44,376.83 |
$45,000.00 |
$37,500.00 |
$20,272.63 |
$47,850.00 |
$90,000.00 |
$125,000.00 |
$80,000.00 |
| 61 | 619(B) 2540 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 1 | LSUM |
$5,000.00 |
$4,307.16 |
$9,000.00 |
$3,700.00 |
$5,000.00 |
$6,210.00 |
$6,600.00 |
$50,000.00 |
$3,800.00 |
| 62 | 628(C) 5110 |
END ANCHORS | 2 | EA |
$3,500.00 |
$5,168.60 |
$10,450.00 |
$12,000.00 |
$10,117.50 |
$10,450.00 |
$10,450.00 |
$11,000.00 |
$10,000.00 |
| 63 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,200 | LF |
$0.2500 |
$0.6500 |
$0.5500 |
$0.6000 |
$0.5300 |
$0.5500 |
$0.5500 |
$0.5700 |
$0.5000 |
| 64 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 11,500 | LF |
$0.8900 |
$1.54 |
$1.30 |
$1.40 |
$1.26 |
$1.30 |
$1.30 |
$1.35 |
$0.8000 |
| 65 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,000 | EA |
$0.9000 |
$0.6900 |
$0.5900 |
$0.6000 |
$0.5600 |
$0.6000 |
$0.5800 |
$0.6100 |
$0.5500 |
| 66 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 14,500 | LF |
$0.2500 |
$0.6500 |
$0.5500 |
$0.6000 |
$0.5300 |
$0.5500 |
$0.5500 |
$0.5700 |
$0.2500 |
| 67 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$36.00 |
$52.21 |
$44.00 |
$48.00 |
$42.60 |
$44.00 |
$44.00 |
$45.00 |
$75.00 |
| 68 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,131 | LF |
$28.00 |
$28.71 |
$28.50 |
$47.00 |
$25.00 |
$23.00 |
$23.10 |
$54.00 |
$25.00 |
| 69 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,092 | LF |
$3.85 |
$7.83 |
$5.95 |
$5.75 |
$10.00 |
$10.00 |
$4.40 |
$2.60 |
$5.00 |
| 70 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 115,680 | SD |
$0.1500 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.1500 |
| 71 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 540 | SD |
$7.50 |
$9.14 |
$7.70 |
$8.40 |
$7.46 |
$7.70 |
$7.70 |
$8.00 |
$2.00 |
| 72 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,530 | SD |
$0.5200 |
$1.63 |
$1.38 |
$1.50 |
$1.33 |
$1.40 |
$1.38 |
$1.43 |
$0.5000 |
| 73 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,460 | SD |
$0.7500 |
$1.63 |
$1.38 |
$1.50 |
$1.33 |
$1.40 |
$1.38 |
$1.43 |
$1.00 |
| 74 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,000 | SD |
$1.20 |
$1.63 |
$1.38 |
$1.50 |
$1.33 |
$1.40 |
$1.38 |
$1.43 |
$2.00 |
| 75 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,480 | SD |
$1.10 |
$2.61 |
$2.20 |
$2.40 |
$2.13 |
$2.20 |
$2.20 |
$2.30 |
$1.00 |
| 76 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.20 |
$3.92 |
$3.30 |
$3.60 |
$3.20 |
$3.30 |
$3.30 |
$3.44 |
$1.00 |
| 77 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 11,340 | SD |
$0.6000 |
$0.3900 |
$0.3300 |
$0.4000 |
$0.3200 |
$0.3500 |
$0.3300 |
$0.3400 |
$0.2500 |
| 78 | 880(E) 8900 |
(PL) CONSTRUCTION ZONE SEQUENTIAL LIGHTING SYSTEM | 1 | LSUM |
$12,500.00 |
$4,959.76 |
$4,180.00 |
$5,000.00 |
$4,047.00 |
$4,180.00 |
$4,180.00 |
$4,500.00 |
$2,000.00 |
| 79 | 880(F) 8878 |
DRUMS | 30,030 | SD |
$0.2200 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.2500 |
| 80 | 880(G) 8890 |
CHANNELIZER CONES | 46,500 | SD |
$0.2700 |
$0.0300 |
$0.0400 |
$0.0300 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0200 |
$0.2500 |
| 81 | 880(I) 8902 |
FLAGGER | 30 | SD |
$180.00 |
$326.30 |
$375.00 |
$265.00 |
$545.97 |
$550.00 |
$330.00 |
$392.82 |
$140.00 |
| 82 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 1,200 | HOUR |
$65.00 |
$65.26 |
$64.00 |
$65.00 |
$102.65 |
$82.50 |
$66.00 |
$74.50 |
$75.00 |
| 83 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 4,200 | SD |
$15.00 |
$14.36 |
$12.00 |
$14.50 |
$11.72 |
$12.00 |
$12.10 |
$12.62 |
$5.00 |
| 84 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 3,600 | SD |
$14.00 |
$6.53 |
$5.50 |
$6.00 |
$5.33 |
$5.50 |
$5.50 |
$5.74 |
$5.00 |
| 85 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 300 | SD |
$40.00 |
$19.58 |
$16.50 |
$20.00 |
$15.98 |
$16.50 |
$16.50 |
$17.21 |
$20.00 |
| 86 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 300 | SD |
$15.00 |
$19.58 |
$16.50 |
$20.00 |
$15.98 |
$16.50 |
$16.50 |
$17.21 |
$50.00 |
| 87 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$160,000.00 |
$75,701.65 |
$81,950.00 |
$85,000.00 |
$79,342.50 |
$81,950.00 |
$81,950.00 |
$85,494.87 |
$130,000.00 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 570 | SD |
$15.00 |
$19.58 |
$16.50 |
$24.00 |
$15.98 |
$16.50 |
$16.50 |
$17.21 |
$15.00 |
| 89 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,400 | LF |
$16.00 |
$11.81 |
$20.50 |
$22.25 |
$19.80 |
$20.50 |
$20.45 |
$21.33 |
$50.00 |
| 90 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$175.00 |
$587.34 |
$450.00 |
$540.00 |
$479.25 |
$495.00 |
$495.00 |
$516.41 |
$500.00 |
| 91 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 2,300 | LF |
$1.10 |
$3.09 |
$2.61 |
$2.90 |
$2.52 |
$2.60 |
$2.61 |
$3.48 |
$2.00 |
| 92 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$20,230.61 |
$17,000.00 |
$10,000.00 |
$50,000.00 |
$10,650.00 |
$8,635.00 |
$25,000.00 |
$16,000.00 |
| 93 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$125,957.00 |
$90,477.83 |
$111,000.00 |
$53,000.00 |
$145,000.00 |
$227,822.47 |
$146,759.89 |
$155,000.00 |
$205,000.00 |