| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$25,000.00 |
$13,423.88 |
$10,000.00 |
$48,096.40 |
$51,205.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,376.23 | CY |
$9.10 |
$11.53 |
$7.00 |
$12.00 |
$15.84 |
$12.05 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,447 | CY |
$12.00 |
$10.00 |
$10.60 |
$14.00 |
$12.10 |
$15.70 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 2,710.53 | CY |
$10.00 |
$7.29 |
$11.86 |
$8.00 |
$11.18 |
$12.55 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,825 | LF |
$1.75 |
$1.50 |
$1.89 |
$3.00 |
$2.20 |
$4.55 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$1,005.69 |
$1,797.57 |
$800.00 |
$550.00 |
$1,570.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,050 | LF |
$9.00 |
$4.57 |
$9.74 |
$6.00 |
$7.70 |
$12.50 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 58.55 | CY |
$100.00 |
$61.85 |
$107.10 |
$85.00 |
$121.00 |
$89.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 15,273.59 | SY |
$1.99 |
$1.80 |
$1.89 |
$2.00 |
$1.65 |
$1.70 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.16 | AC |
$500.00 |
$122.62 |
$487.20 |
$400.00 |
$660.00 |
$105.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,486.49 | CY |
$51.20 |
$62.00 |
$71.87 |
$48.00 |
$111.66 |
$93.00 |
| 12 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,907.81 | SY |
$4.20 |
$9.00 |
$11.13 |
$11.00 |
$16.07 |
$8.90 |
| 13 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 493.06 | SY |
$1.80 |
$2.51 |
$6.38 |
$3.00 |
$15.19 |
$6.80 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 780.77 | TON |
$28.00 |
$35.00 |
$41.79 |
$49.00 |
$69.43 |
$57.10 |
| 15 | 407(B) 0250 |
TACK COAT | 4,539 | GAL |
$3.25 |
$2.15 |
$3.91 |
$4.00 |
$3.50 |
$3.05 |
| 16 | 408 5774 |
PRIME COAT | 5,081.43 | GAL |
$6.70 |
$1.25 |
$10.56 |
$11.00 |
$8.09 |
$4.70 |
| 17 | 409(A) 4242 |
FABRIC REINFORCEMENT | 4,023.49 | SY |
$0.9800 |
$2.75 |
$12.14 |
$2.75 |
$11.31 |
$5.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 551.41 | TON |
$85.00 |
$79.00 |
$87.15 |
$90.00 |
$76.12 |
$133.35 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,030.52 | TON |
$90.00 |
$80.00 |
$91.45 |
$95.00 |
$82.42 |
$80.60 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 3,327.32 | SY |
$13.60 |
$4.91 |
$3.05 |
$4.50 |
$5.48 |
$11.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 28.34 | CY |
$27.00 |
$6.19 |
$60.90 |
$60.00 |
$218.59 |
$15.90 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 135.1 | CY |
$480.00 |
$599.37 |
$369.94 |
$600.00 |
$379.78 |
$680.10 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 202.2 | CY |
$278.00 |
$507.17 |
$320.99 |
$450.00 |
$357.50 |
$379.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 19,735.5 | LB |
$1.11 |
$1.11 |
$0.4900 |
$1.00 |
$1.25 |
$0.9100 |
| 25 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$1,000.00 |
$4,954.39 |
$6,333.60 |
$3,000.00 |
$3,000.00 |
$9,200.00 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 122.5 | TON |
$57.30 |
$61.08 |
$68.40 |
$60.00 |
$160.38 |
$56.05 |
| 27 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 40.1 | SY |
$70.00 |
$113.67 |
$91.35 |
$60.00 |
$218.42 |
$200.60 |
| 28 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$2,900.00 |
$3,079.01 |
$3,142.44 |
$4,000.00 |
$145.80 |
$3,955.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 18 | LF |
$83.00 |
$95.78 |
$85.55 |
$100.00 |
$1,417.68 |
$64.55 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 226 | LF |
$30.00 |
$54.77 |
$65.99 |
$47.00 |
$151.20 |
$43.60 |
| 31 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 54 | LF |
$39.15 |
$47.33 |
$75.87 |
$45.00 |
$85.00 |
$48.35 |
| 32 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 30 | LF |
$48.96 |
$79.51 |
$73.93 |
$60.00 |
$63.25 |
$56.50 |
| 33 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$300.00 |
$397.57 |
$473.27 |
$700.00 |
$65.76 |
$307.70 |
| 34 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$450.00 |
$533.81 |
$595.60 |
$1,200.00 |
$648.19 |
$487.60 |
| 35 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 14 | EA |
$250.00 |
$281.15 |
$345.18 |
$200.00 |
$777.50 |
$864.20 |
| 36 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$700.00 |
$1,414.43 |
$1,126.65 |
$500.00 |
$657.77 |
$975.00 |
| 37 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 10.81 | CY |
$56.00 |
$231.90 |
$101.14 |
$80.00 |
$1,298.34 |
$63.60 |
| 38 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$12,000.00 |
$12,180.00 |
$20,000.00 |
$19,052.00 |
$46,850.00 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 699 | LF |
$3.84 |
$3.23 |
$7.17 |
$6.00 |
$4.66 |
$6.40 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 187.5 | LF |
$17.50 |
$37.16 |
$21.25 |
$26.00 |
$20.08 |
$19.35 |
| 41 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$2,525.00 |
$3,715.79 |
$3,051.09 |
$3,200.00 |
$2,310.00 |
$3,300.00 |
| 42 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 402.6 | LF |
$5.00 |
$6.19 |
$11.25 |
$7.00 |
$5.50 |
$6.40 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 611.66 | LF |
$7.90 |
$6.81 |
$11.39 |
$7.00 |
$5.50 |
$6.40 |
| 44 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,071.43 |
$619.30 |
$638.23 |
$750.00 |
$880.00 |
$848.00 |
| 45 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 12 | EA |
$100.00 |
$105.28 |
$133.98 |
$150.00 |
$93.50 |
$106.00 |
| 46 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$215.00 |
$247.72 |
$237.51 |
$250.00 |
$220.00 |
$212.00 |
| 47 | 629(C) 4960 |
MAILBOX | 21 | EA |
$30.00 |
$61.93 |
$34.10 |
$40.00 |
$55.00 |
$57.50 |
| 48 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$135.00 |
$247.72 |
$225.33 |
$200.00 |
$220.00 |
$371.00 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 54.38 | SF |
$18.00 |
$18.58 |
$36.54 |
$20.00 |
$16.50 |
$21.20 |
| 50 | 851(C) 8324 |
2" SQUARE TUBE POST | 77.5 | LF |
$9.00 |
$14.86 |
$10.96 |
$12.00 |
$13.20 |
$12.75 |
| 51 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 21,204 | LF |
$0.1500 |
$0.1900 |
$0.2200 |
$0.3000 |
$0.1700 |
$0.6500 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$15,482.47 |
$10,962.00 |
$15,000.00 |
$13,750.00 |
$14,840.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$18,578.97 |
$17,508.75 |
$20,000.00 |
$38,225.00 |
$38,955.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$1,543.00 |
$1,200.00 |
$3,191.16 |
$10,000.00 |
$5,000.00 |
$9,540.00 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$50,000.00 |
$67,096.58 |
$80,000.00 |
$68,288.00 |
$179,000.00 |