| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,478 | CY |
$10.00 |
$13.79 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$100,000.00 |
$83,119.63 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,050 | LF |
$2.00 |
$1.13 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 882 | LF |
$6.00 |
$6.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 45,777 | SY |
$1.15 |
$1.41 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.46 | AC |
$300.00 |
$299.78 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 71,861 | SY |
$1.80 |
$0.6900 |
| 8 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 26,428 | LF |
$3.25 |
$12.79 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 687 | TON |
$55.00 |
$51.92 |
| 10 | 407(B) 0250 |
TACK COAT | 3,455 | GAL |
$3.00 |
$2.28 |
| 11 | 408 5774 |
PRIME COAT | 25,313 | GAL |
$3.50 |
$3.16 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,845 | TON |
$78.00 |
$87.68 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,663 | TON |
$85.00 |
$89.36 |
| 14 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$755.00 |
$987.52 |
| 15 | 504 6179 |
BRIDGE TRAFFIC RAIL | 120 | LF |
$200.00 |
$150.00 |
| 16 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 3 | CY |
$1,700.00 |
$800.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
| 18 | 611(L) 0487 |
JUNCTION BOXES | 67.48 | CF |
$90.00 |
$75.00 |
| 19 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 88 | LF |
$72.00 |
$80.98 |
| 20 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 104 | LF |
$95.00 |
$113.34 |
| 21 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 40 | LF |
$145.00 |
$190.72 |
| 22 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$240.00 |
$222.49 |
| 23 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 359 | LF |
$25.00 |
$29.46 |
| 24 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 101 | LF |
$30.00 |
$38.40 |
| 25 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 68 | LF |
$36.00 |
$35.65 |
| 26 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$2,400.00 |
$2,213.21 |
| 27 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$866.16 |
| 28 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,037.74 |
| 29 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,800.00 |
$2,026.79 |
| 30 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 9 | EA |
$950.00 |
$1,000.00 |
| 31 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,100.00 |
$1,200.00 |
| 32 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,800.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$10,351.26 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 400 | LF |
$7.50 |
$4.66 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 270 | LF |
$8.00 |
$1.25 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,200 | LF |
$17.25 |
$14.95 |
| 37 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$2,000.00 |
$1,150.00 |
| 38 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,100.00 |
$2,025.00 |
| 39 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 5 | EA |
$200.00 |
$99.67 |
| 40 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 137.56 | SF |
$28.00 |
$30.00 |
| 41 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 32,899 | LF |
$0.6500 |
$0.5500 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$9,049.37 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$20,000.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$5,000.00 |
| 45 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$196,503.15 |