| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$25,000.00 |
$10,384.29 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$75,000.00 |
$76,000.00 |
$106,818.39 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,390 | LF |
$2.00 |
$1.50 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 610 | LF |
$8.00 |
$8.00 |
$8.97 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 13,233 | SY |
$1.50 |
$1.50 |
$2.32 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,336 | CY |
$51.49 |
$48.00 |
$64.76 |
| 7 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 26,275.05 | LF |
$5.00 |
$13.60 |
$12.34 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,549 | TON |
$30.00 |
$33.00 |
$22.16 |
| 9 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 70,378 | SY |
$14.00 |
$10.50 |
$5.11 |
| 10 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 12,434 | CY |
$98.00 |
$99.50 |
$164.90 |
| 11 | 509(A) 0319 |
CLASS AA CONCRETE | 157 | CY |
$600.00 |
$451.35 |
$742.88 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$350.00 |
$1,119.47 |
$385.20 |
| 13 | 511(A) 0332 |
REINFORCING STEEL | 26,647.7 | LB |
$1.00 |
$0.9600 |
$0.9900 |
| 14 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 2,330.28 | LF |
$6.50 |
$8.00 |
$3.79 |
| 15 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 24 | LF |
$275.00 |
$150.88 |
$109.96 |
| 16 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 30 | LF |
$300.00 |
$169.45 |
$98.22 |
| 17 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 78 | LF |
$300.00 |
$137.37 |
$82.85 |
| 18 | 613(C) 5102 |
24" PRECOATED CORR. STEEL PIPE | 38 | LF |
$70.00 |
$77.82 |
$59.59 |
| 19 | 613(C) 5216 |
28" X 20" PRECOATED CORR. STL. PIPE ARCH | 78 | LF |
$70.00 |
$111.72 |
$60.58 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,500.00 |
$1,298.71 |
$1,113.80 |
| 21 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,600.00 |
$1,387.82 |
$1,203.98 |
| 22 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,800.00 |
$1,512.57 |
$1,354.28 |
| 23 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$600.00 |
$699.06 |
$378.29 |
| 24 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 18 | EA |
$650.00 |
$665.12 |
$284.15 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$11,071.94 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 74 | LF |
$5.00 |
$6.91 |
$2.40 |
| 27 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 7.68 | CY |
$40.00 |
$21.30 |
$33.02 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 33.8 | CY |
$600.00 |
$567.65 |
$671.34 |
| 29 | 511(A) 1332 |
REINFORCING STEEL | 5,212.5 | LB |
$1.00 |
$1.12 |
$0.9400 |
| 30 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$4,686.00 |
$9,354.86 |
| 31 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 17.98 | CY |
$40.00 |
$21.30 |
$33.02 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 70.2 | CY |
$600.00 |
$567.65 |
$671.34 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 10,554.9 | LB |
$1.00 |
$1.12 |
$0.9400 |
| 34 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$5,112.00 |
$9,354.86 |
| 35 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 21.15 | CY |
$40.00 |
$21.30 |
$33.02 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 79.9 | CY |
$600.00 |
$567.65 |
$671.34 |
| 37 | 511(A) 1332 |
REINFORCING STEEL | 12,792.8 | LB |
$1.00 |
$1.12 |
$0.9400 |
| 38 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$5,112.00 |
$9,354.86 |
| 39 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 105,056 | LF |
$0.1000 |
$0.2700 |
$0.1500 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$5,325.00 |
$16,459.04 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,500.00 |
$21,000.00 |
$42,889.26 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$750.00 |
$11,996.22 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$180,000.00 |
$225,373.17 |