| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 8,621.25 | CY |
$11.18 |
$10.00 |
$16.00 |
$14.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$62,000.00 |
$80,000.00 |
$110,000.00 |
$110,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 480 | LF |
$2.00 |
$2.00 |
$1.50 |
$1.29 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 329 | LF |
$7.17 |
$6.00 |
$6.50 |
$6.33 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 44,307.97 | SY |
$1.24 |
$1.10 |
$1.25 |
$1.03 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.15 | AC |
$520.00 |
$300.00 |
$300.00 |
$288.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,086.7 | CY |
$57.00 |
$100.00 |
$90.00 |
$60.00 |
| 8 | 307(A) 4200 |
FLY ASH | 1,538.84 | TON |
$55.00 |
$100.00 |
$77.00 |
$75.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 56,155.23 | SY |
$3.00 |
$2.30 |
$3.00 |
$2.80 |
| 10 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 21,033.56 | LF |
$4.33 |
$3.25 |
$4.00 |
$9.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 396 | TON |
$36.00 |
$50.00 |
$60.00 |
$40.00 |
| 12 | 407(B) 0250 |
TACK COAT | 3,362.72 | GAL |
$4.10 |
$3.75 |
$2.40 |
$2.60 |
| 13 | 408 5774 |
PRIME COAT | 23,764.58 | GAL |
$4.70 |
$3.75 |
$3.00 |
$3.50 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,969.42 | TON |
$80.00 |
$85.00 |
$80.50 |
$102.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,527.28 | TON |
$85.00 |
$90.00 |
$90.50 |
$108.50 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 15,704.59 | SY |
$4.25 |
$3.65 |
$2.00 |
$6.50 |
| 17 | 433 5109 |
RUBBLIZING PAVEMENT | 11,778.44 | SY |
$2.00 |
$3.80 |
$4.00 |
$3.75 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 38 | CY |
$18.00 |
$70.00 |
$30.00 |
$25.00 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 89.31 | CY |
$600.00 |
$680.00 |
$600.00 |
$580.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$320.00 |
$300.00 |
$425.00 |
$400.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 4,425 | LB |
$1.17 |
$1.00 |
$1.25 |
$1.20 |
| 22 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 314 | TON |
$81.00 |
$80.00 |
$65.00 |
$79.00 |
| 23 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 217 | SY |
$102.00 |
$60.00 |
$75.00 |
$70.00 |
| 24 | 611(L) 0487 |
JUNCTION BOXES | 30.42 | CF |
$61.00 |
$80.00 |
$115.00 |
$110.00 |
| 25 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 104 | LF |
$81.17 |
$100.00 |
$145.00 |
$132.00 |
| 26 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 256 | LF |
$275.00 |
$125.00 |
$200.00 |
$181.50 |
| 27 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 144 | LF |
$260.00 |
$125.00 |
$235.00 |
$213.00 |
| 28 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 112 | LF |
$210.00 |
$175.00 |
$290.00 |
$261.00 |
| 29 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 398 | LF |
$57.06 |
$24.00 |
$27.00 |
$24.00 |
| 30 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 327 | LF |
$57.00 |
$29.50 |
$31.00 |
$28.00 |
| 31 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$36.70 |
$37.50 |
$42.00 |
$38.00 |
| 32 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 18 | EA |
$450.00 |
$200.00 |
$200.00 |
$160.00 |
| 33 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 5 | EA |
$1,100.00 |
$1,000.00 |
$1,500.00 |
$1,300.00 |
| 34 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 12 | EA |
$460.00 |
$250.00 |
$500.00 |
$300.00 |
| 35 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$753.00 |
$350.00 |
$700.00 |
$500.00 |
| 36 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$1,650.00 |
$1,400.00 |
$1,600.00 |
$1,400.00 |
| 37 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$980.00 |
$1,000.00 |
$1,000.00 |
$940.80 |
| 38 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$22,000.00 |
$20,000.00 |
$45,000.00 |
$40,000.00 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,139.37 | SY |
$8.00 |
$5.00 |
$3.00 |
$9.00 |
| 40 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 216.89 | SY |
$7.50 |
$8.00 |
$9.00 |
$8.00 |
| 41 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 264.67 | SY |
$11.75 |
$10.00 |
$7.00 |
$6.00 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 245 | LF |
$11.00 |
$11.00 |
$4.00 |
$5.00 |
| 43 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 480 | LF |
$21.00 |
$18.00 |
$16.50 |
$16.50 |
| 44 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,400.00 |
$2,000.00 |
$1,950.00 |
$1,950.00 |
| 45 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$1,975.00 |
$2,000.00 |
$2,050.00 |
$2,050.00 |
| 46 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$195.00 |
$200.00 |
$500.00 |
$250.00 |
| 47 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 140.48 | SF |
$28.00 |
$28.00 |
$28.00 |
$28.00 |
| 48 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 13,934 | LF |
$0.6500 |
$1.00 |
$0.8800 |
$0.8800 |
| 49 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,200.00 |
$10,000.00 |
$10,000.00 |
$6,250.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$60,000.00 |
$50,000.00 |
$47,500.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$15,000.00 |
$24,000.00 |
$4,000.00 |
| 52 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$195,000.00 |
$205,000.00 |
$198,000.00 |
$228,000.00 |