| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$9,000.00 |
$9,000.00 |
$9,500.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,956 | CY |
$8.00 |
$7.15 |
$8.00 |
$8.13 |
$8.21 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 612 | CY |
$15.00 |
$10.25 |
$11.00 |
$11.50 |
$16.43 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$3,800.00 |
$8,000.00 |
$5,150.00 |
$20,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,518 | LF |
$2.00 |
$1.75 |
$1.80 |
$1.98 |
$2.05 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 106 | LF |
$9.00 |
$12.95 |
$7.00 |
$10.80 |
$15.20 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,509 | SY |
$1.50 |
$1.44 |
$1.50 |
$1.75 |
$1.69 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.34 | AC |
$500.00 |
$795.00 |
$200.00 |
$400.00 |
$932.83 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 2,323 | SY |
$2.00 |
$1.07 |
$1.50 |
$3.45 |
$2.02 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,629 | TON |
$35.00 |
$19.10 |
$25.00 |
$29.12 |
$28.04 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$400.00 |
$200.00 |
$295.00 |
$427.83 |
| 12 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 218 | LF |
$25.00 |
$21.00 |
$40.00 |
$24.00 |
$33.95 |
| 13 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 143 | LF |
$75.00 |
$66.50 |
$95.00 |
$63.00 |
$79.23 |
| 14 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$800.00 |
$1,200.00 |
$1,400.00 |
$900.00 |
$1,402.92 |
| 15 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$1,500.00 |
$3,000.00 |
$2,250.00 |
$2,012.02 |
| 16 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 124 | CY |
$30.00 |
$40.00 |
$45.00 |
$60.00 |
$66.41 |
| 17 | 613(V) 1180 |
TRENCH EXCAVATION | 222 | CY |
$10.00 |
$10.75 |
$6.00 |
$9.00 |
$8.21 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,700.00 |
$2,500.00 |
$4,750.00 |
$4,458.83 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$10.00 |
$28.00 |
$26.00 |
$8.50 |
$23.14 |
| 20 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$80.00 |
$110.00 |
$160.00 |
$175.00 |
$175.00 |
| 21 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 179 | LF |
$200.00 |
$230.00 |
$250.00 |
$240.00 |
$375.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 125 | SY |
$200.00 |
$170.00 |
$185.00 |
$227.50 |
$160.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 156.7 | SY |
$7.00 |
$12.76 |
$19.00 |
$16.20 |
$14.97 |
| 24 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 188.1 | LF |
$70.00 |
$85.00 |
$75.00 |
$86.50 |
$150.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 580 | LB |
$3.00 |
$5.00 |
$5.00 |
$4.00 |
$10.00 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$600.00 |
$1,000.00 |
$1,200.00 |
$732.00 |
$1,306.08 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$1,000.00 |
$1,200.00 |
$732.00 |
$1,306.08 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 50.6 | CY |
$670.00 |
$800.00 |
$700.00 |
$690.00 |
$1,775.97 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 72.5 | CY |
$670.00 |
$800.00 |
$700.00 |
$697.50 |
$590.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 26,143 | LB |
$1.10 |
$0.8500 |
$1.00 |
$0.9400 |
$1.30 |
| 31 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 96 | LF |
$35.00 |
$55.00 |
$45.00 |
$64.40 |
$30.00 |
| 32 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 210 | LF |
$45.00 |
$55.00 |
$57.00 |
$69.30 |
$35.00 |
| 33 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 96 | LF |
$15.00 |
$55.00 |
$10.00 |
$27.60 |
$135.00 |
| 34 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 210 | LF |
$20.00 |
$55.00 |
$10.00 |
$29.70 |
$165.51 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 859 | TON |
$40.00 |
$37.39 |
$45.00 |
$45.41 |
$44.88 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 167 | TON |
$30.00 |
$35.03 |
$36.00 |
$31.22 |
$32.27 |
| 37 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$35.00 |
$35.00 |
$35.00 |
$27.18 |
| 38 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$35.00 |
$40.00 |
$35.00 |
$16.86 |
| 39 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$21,000.00 |
$14,000.00 |
$9,625.00 |
$25,000.00 |
| 40 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,775.00 |
$1,675.00 |
$2,130.00 |
$2,018.21 |
| 41 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,200.00 |
$2,200.00 |
$2,640.00 |
$2,170.75 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$3,600.00 |
$6,250.00 |
$4,200.00 |
$4,224.15 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$8,500.00 |
$8,500.00 |
$12,000.00 |
$11,616.42 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$3,000.00 |
$2,700.00 |
$4,000.00 |
$1,987.07 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$41,120.00 |
$50,000.00 |
$53,000.00 |
$41,000.00 |
$61,800.00 |