| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$15,488.72 |
$10,000.00 |
$11,000.00 |
$60,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$47,085.71 |
$33,000.00 |
$48,215.00 |
$80,000.00 |
| 3 | 210 0121 |
OBLITERATING ABANDONED ROAD | 300 | LF |
$7.00 |
$1.50 |
$32.22 |
$5.00 |
$10.00 |
$10.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$2.00 |
$1.33 |
$1.86 |
$3.00 |
$1.55 |
$1.33 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$9.00 |
$7.45 |
$7.43 |
$7.00 |
$9.00 |
$7.45 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 4,000 | SY |
$3.00 |
$1.39 |
$1.71 |
$2.50 |
$1.65 |
$1.39 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,180 | TON |
$30.00 |
$20.00 |
$32.22 |
$28.00 |
$38.22 |
$36.00 |
| 8 | 407(B) 0250 |
TACK COAT | 340 | GAL |
$4.00 |
$8.00 |
$9.91 |
$8.00 |
$10.00 |
$3.00 |
| 9 | 408 5774 |
PRIME COAT | 1,210 | GAL |
$4.00 |
$3.00 |
$3.72 |
$4.00 |
$4.00 |
$3.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 390 | TON |
$90.00 |
$92.00 |
$114.00 |
$100.00 |
$110.40 |
$94.50 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 260 | TON |
$95.00 |
$200.00 |
$247.82 |
$220.00 |
$195.00 |
$123.95 |
| 12 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 350 | TON |
$39.00 |
$32.00 |
$39.65 |
$50.00 |
$40.69 |
$45.00 |
| 13 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 600 | SY |
$2.75 |
$2.00 |
$2.97 |
$2.00 |
$4.75 |
$3.00 |
| 14 | 613(C) 5100 |
18" PRECOATED CORR. STEEL PIPE | 70 | LF |
$40.00 |
$35.00 |
$52.72 |
$35.00 |
$47.00 |
$60.00 |
| 15 | 613(C) 5221 |
35" X 24" PRECOATED CORR. STL. PIPE ARCH | 50 | LF |
$70.00 |
$45.00 |
$73.60 |
$50.00 |
$84.00 |
$72.00 |
| 16 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,500.00 |
$350.00 |
$545.20 |
$350.00 |
$400.00 |
$560.00 |
| 17 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$200.00 |
$315.97 |
$250.00 |
$250.00 |
$300.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$20.00 |
$30.00 |
$37.17 |
$25.00 |
$19.20 |
$16.00 |
| 19 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$1,500.00 |
$850.00 |
$1,053.23 |
$500.00 |
$960.00 |
$800.00 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,900.00 |
$2,354.29 |
$2,200.00 |
$2,070.00 |
$1,725.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,265.00 |
$1,815.00 |
$2,248.96 |
$2,500.00 |
$2,100.00 |
$1,760.00 |
| 22 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 653 | LF |
$7.00 |
$6.00 |
$6.82 |
$5.00 |
$9.00 |
$6.50 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 168 | CY |
$17.00 |
$15.00 |
$18.59 |
$15.00 |
$10.00 |
$25.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 89.04 | CY |
$155.00 |
$170.00 |
$171.00 |
$145.00 |
$182.50 |
$175.00 |
| 25 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$150.00 |
$200.00 |
$216.84 |
$155.00 |
$220.00 |
$200.00 |
| 26 | 504(B) 1305 |
SAW-CUT GROOVING | 487.26 | SY |
$5.50 |
$5.50 |
$6.82 |
$6.25 |
$6.60 |
$5.50 |
| 27 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.17 | LF |
$265.00 |
$200.00 |
$309.77 |
$225.00 |
$275.00 |
$380.00 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 328.4 | LF |
$80.00 |
$80.00 |
$80.54 |
$85.00 |
$77.50 |
$75.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 11,740 | LB |
$2.20 |
$2.00 |
$2.17 |
$3.10 |
$4.50 |
$5.00 |
| 30 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 11 | EA |
$600.00 |
$1,500.00 |
$681.50 |
$1,250.00 |
$1,050.00 |
$1,000.00 |
| 31 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 11 | EA |
$850.00 |
$1,500.00 |
$681.50 |
$1,250.00 |
$1,050.00 |
$1,000.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 101.4 | CY |
$600.00 |
$600.00 |
$540.25 |
$650.00 |
$685.00 |
$700.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 83 | CY |
$600.00 |
$700.00 |
$607.16 |
$700.00 |
$703.50 |
$750.00 |
| 34 | 511(A) 0332 |
REINFORCING STEEL | 35,000 | LB |
$1.00 |
$1.00 |
$0.9700 |
$0.9500 |
$0.9300 |
$1.00 |
| 35 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 297.44 | LF |
$35.00 |
$27.00 |
$30.98 |
$35.00 |
$37.10 |
$39.00 |
| 36 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 717.38 | LF |
$40.00 |
$34.00 |
$33.46 |
$45.00 |
$40.60 |
$48.00 |
| 37 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 297.44 | LF |
$15.00 |
$12.00 |
$17.35 |
$15.00 |
$15.90 |
$11.00 |
| 38 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 717.38 | LF |
$15.00 |
$15.00 |
$17.35 |
$15.00 |
$17.40 |
$11.00 |
| 39 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 40 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 142.14 | LF |
$680.00 |
$998.00 |
$613.35 |
$850.00 |
$905.00 |
$1,100.00 |
| 41 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$60,000.00 |
$28,000.00 |
$35,933.83 |
$75,000.00 |
$102,000.00 |
$65,000.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 469.7 | TON |
$40.00 |
$32.00 |
$39.65 |
$40.00 |
$37.59 |
$45.00 |
| 43 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 568.8 | SY |
$2.75 |
$2.00 |
$28.50 |
$2.00 |
$4.75 |
$3.00 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$16,500.00 |
$4,708.57 |
$10,000.00 |
$8,125.00 |
$12,000.00 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,950.00 |
$4,027.07 |
$3,500.00 |
$4,250.00 |
$3,425.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$11,461.65 |
$5,000.00 |
$12,000.00 |
$9,250.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,600.00 |
$1,500.00 |
$1,858.65 |
$3,500.00 |
$4,500.00 |
$2,700.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$60,000.00 |
$52,042.10 |
$55,000.00 |
$63,000.00 |
$75,000.00 |