| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$5,638.04 |
$22,000.00 |
$7,000.00 |
$20,000.00 |
$30,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$33,000.00 |
$42,650.00 |
$58,886.22 |
$61,000.00 |
$47,400.00 |
$55,000.00 |
$50,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,650 | LF |
$2.50 |
$1.80 |
$1.58 |
$1.55 |
$2.50 |
$1.40 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 154 | LF |
$6.00 |
$9.00 |
$7.52 |
$8.00 |
$8.00 |
$7.15 |
$6.75 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 11,013 | SY |
$2.50 |
$1.56 |
$1.67 |
$1.35 |
$2.33 |
$1.65 |
$1.65 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 5 | AC |
$500.00 |
$100.00 |
$473.60 |
$200.00 |
$500.00 |
$660.00 |
$380.00 |
| 7 | 307(B) 4210 |
CEMENT KILN DUST | 348 | TON |
$50.00 |
$60.50 |
$98.10 |
$79.00 |
$70.00 |
$70.00 |
$65.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 6,436 | SY |
$2.00 |
$4.20 |
$3.70 |
$3.00 |
$5.95 |
$4.00 |
$4.45 |
| 9 | 408 5774 |
PRIME COAT | 2,863 | GAL |
$4.50 |
$8.05 |
$3.51 |
$2.80 |
$9.00 |
$8.80 |
$8.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,409 | TON |
$80.00 |
$97.75 |
$90.71 |
$73.00 |
$95.00 |
$92.00 |
$99.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 784 | TON |
$85.00 |
$120.75 |
$114.64 |
$92.00 |
$115.00 |
$101.00 |
$107.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$285.00 |
$245.57 |
$200.00 |
$300.00 |
$300.00 |
$300.00 |
| 13 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 122 | LF |
$50.00 |
$66.00 |
$42.60 |
$55.00 |
$110.00 |
$52.00 |
$75.00 |
| 14 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 102 | LF |
$70.00 |
$72.00 |
$56.38 |
$65.00 |
$125.00 |
$82.00 |
$75.00 |
| 15 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 82 | LF |
$100.00 |
$125.00 |
$91.46 |
$110.00 |
$150.00 |
$92.00 |
$135.00 |
| 16 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$50.00 |
$108.00 |
$79.50 |
$94.00 |
$165.00 |
$93.00 |
$100.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 86 | LF |
$30.00 |
$49.00 |
$31.32 |
$40.00 |
$36.00 |
$25.00 |
$45.00 |
| 18 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$500.00 |
$600.00 |
$707.89 |
$750.00 |
$425.00 |
$1,050.00 |
$850.00 |
| 19 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$700.00 |
$1,400.00 |
$1,566.12 |
$1,500.00 |
$600.00 |
$2,050.00 |
$2,200.00 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$975.00 |
$1,879.35 |
$1,300.00 |
$1,900.00 |
$1,200.00 |
$1,100.00 |
| 21 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,000.00 |
$2,881.67 |
$1,900.00 |
$2,800.00 |
$1,250.00 |
$2,100.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$375.87 |
$4,000.00 |
$6,000.00 |
$22,000.00 |
$8,000.00 |
| 23 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$100.00 |
$165.00 |
$125.29 |
$200.00 |
$300.00 |
$100.00 |
$200.00 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$10.00 |
$9.00 |
$15.03 |
$26.00 |
$15.00 |
$15.00 |
$15.00 |
| 25 | 501(F) 6352 |
GRANULAR BACKFILL | 48 | CY |
$50.00 |
$60.00 |
$26.31 |
$70.00 |
$70.00 |
$75.00 |
$80.00 |
| 26 | 504(B) 1305 |
SAW-CUT GROOVING | 209 | SY |
$4.00 |
$11.00 |
$18.23 |
$11.00 |
$15.00 |
$12.00 |
$15.00 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 226.6 | LF |
$60.00 |
$78.50 |
$81.44 |
$85.00 |
$75.00 |
$75.00 |
$110.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 59,560 | LB |
$1.80 |
$1.97 |
$2.44 |
$2.00 |
$2.02 |
$2.00 |
$2.10 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$750.00 |
$500.00 |
$152.85 |
$800.00 |
$265.00 |
$250.00 |
$400.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 82.4 | CY |
$550.00 |
$652.50 |
$400.93 |
$700.00 |
$550.00 |
$700.00 |
$695.00 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$450.00 |
$662.50 |
$814.38 |
$650.00 |
$550.00 |
$750.00 |
$695.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 21,770 | LB |
$0.8000 |
$0.9300 |
$0.5400 |
$1.10 |
$1.05 |
$1.00 |
$1.00 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 930 | LF |
$30.00 |
$28.00 |
$27.63 |
$50.00 |
$26.50 |
$30.00 |
$41.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 930 | LF |
$12.00 |
$12.00 |
$23.81 |
$12.00 |
$15.00 |
$15.00 |
$17.00 |
| 35 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,817 | TON |
$35.00 |
$36.39 |
$40.09 |
$40.00 |
$34.00 |
$37.00 |
$40.00 |
| 37 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 582 | TON |
$30.00 |
$28.08 |
$31.32 |
$30.00 |
$32.00 |
$30.00 |
$32.00 |
| 38 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$20.00 |
$28.00 |
$18.17 |
$40.00 |
$65.00 |
$25.00 |
$20.00 |
| 39 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$20.00 |
$28.00 |
$18.17 |
$40.00 |
$15.00 |
$25.00 |
$20.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,250.00 |
$9,396.74 |
$10,000.00 |
$9,500.00 |
$10,000.00 |
$17,500.00 |
| 41 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$1,661.75 |
$1,810.44 |
$1,675.00 |
$1,800.00 |
$1,600.00 |
$1,800.00 |
| 42 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$3,000.00 |
$1,457.05 |
$1,587.42 |
$1,625.00 |
$1,800.00 |
$1,400.00 |
$1,600.00 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,412.90 |
$3,800.00 |
$3,600.00 |
$3,000.00 |
$5,000.00 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 13.18 | SF |
$20.00 |
$28.00 |
$35.08 |
$25.00 |
$35.00 |
$30.00 |
$34.00 |
| 45 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 30 | LF |
$11.00 |
$14.00 |
$17.54 |
$10.00 |
$20.00 |
$16.00 |
$17.00 |
| 46 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 5,172 | LF |
$0.3000 |
$0.3500 |
$0.3500 |
$0.3000 |
$0.6000 |
$0.4800 |
$0.3500 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$16,000.00 |
$3,758.69 |
$11,000.00 |
$11,000.00 |
$16,000.00 |
$13,000.00 |
| 48 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,132.25 |
$2,500.00 |
$3,000.00 |
$3,000.00 |
$6,000.00 |
| 49 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,000.00 |
$34,750.00 |
$42,347.96 |
$71,000.00 |
$54,000.00 |
$42,000.00 |
$20,000.00 |