| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,000.00 |
$10,000.00 |
$18,000.00 |
$100,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 782 | CY |
$14.00 |
$11.00 |
$9.00 |
$20.00 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,516 | CY |
$12.00 |
$8.00 |
$14.00 |
$15.00 |
$14.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$8,000.00 |
$10,000.00 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 400 | LF |
$2.00 |
$3.00 |
$1.60 |
$2.50 |
$2.25 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$11.00 |
$12.00 |
$8.00 |
$8.30 |
$7.52 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 50 | LF |
$2.85 |
$1.00 |
$4.00 |
$1.75 |
$1.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 9,879 | SY |
$1.75 |
$1.80 |
$2.50 |
$1.45 |
$1.32 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 2.23 | AC |
$800.00 |
$900.00 |
$650.00 |
$495.00 |
$448.50 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.23 | AC |
$885.00 |
$1,000.00 |
$650.00 |
$495.00 |
$448.50 |
| 11 | 241 2832 |
MOWING | 4.46 | AC |
$120.00 |
$65.00 |
$120.00 |
$86.00 |
$78.50 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,500 | SY |
$2.70 |
$3.00 |
$6.00 |
$3.00 |
$2.75 |
| 13 | 407(B) 0250 |
TACK COAT | 507 | GAL |
$5.00 |
$3.50 |
$12.00 |
$10.00 |
$9.22 |
| 14 | 408 5774 |
PRIME COAT | 925 | GAL |
$8.00 |
$6.00 |
$22.00 |
$20.00 |
$18.17 |
| 15 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 225 | TON |
$95.00 |
$109.00 |
$110.00 |
$108.00 |
$98.45 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,058 | TON |
$75.00 |
$104.00 |
$100.00 |
$99.00 |
$89.76 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 150 | TON |
$105.00 |
$120.00 |
$110.00 |
$108.00 |
$98.27 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 115 | TON |
$85.00 |
$106.00 |
$105.00 |
$100.00 |
$90.29 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 85 | CY |
$30.00 |
$30.00 |
$20.00 |
$35.00 |
$5.00 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 294 | CY |
$425.00 |
$600.00 |
$550.00 |
$600.00 |
$581.51 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 25 | CY |
$350.00 |
$325.00 |
$350.00 |
$400.00 |
$375.00 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 42,255 | LB |
$1.10 |
$0.8500 |
$1.00 |
$1.00 |
$0.9000 |
| 23 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 36 | LF |
$30.00 |
$25.00 |
$20.00 |
$25.00 |
$55.00 |
| 24 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 12 | LF |
$30.00 |
$25.00 |
$20.00 |
$25.00 |
$55.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$1,500.00 |
$20,000.00 |
$5,000.00 |
$10,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,949 | SY |
$4.45 |
$9.00 |
$6.00 |
$5.00 |
$4.05 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,385 | LF |
$5.00 |
$3.00 |
$4.00 |
$5.00 |
$2.25 |
| 28 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 86 | LF |
$12.00 |
$12.00 |
$12.00 |
$8.80 |
$4.85 |
| 29 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 500 | LF |
$10.00 |
$14.00 |
$12.00 |
$8.80 |
$5.10 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$40,000.00 |
$50,000.00 |
$85,000.00 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,600.00 |
$7,000.00 |
$6,500.00 |
$8,250.00 |
$7,500.00 |
| 32 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$22.50 |
$37.00 |
$50.00 |
$55.00 |
$50.00 |
| 33 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$200.00 |
$250.00 |
$300.00 |
$550.00 |
$500.00 |
| 34 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,000 | LF |
$0.8500 |
$2.00 |
$2.20 |
$3.30 |
$3.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$5,700.00 |
$10,000.00 |
$6,500.00 |
$4,670.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$3,500.00 |
$3,000.00 |
$4,500.00 |
| 37 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$65,000.00 |
$60,000.00 |
$40,000.00 |
$201,789.55 |