| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$9,000.00 |
$14,250.00 |
$27,170.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$53,000.00 |
$40,000.00 |
$65,340.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.50 |
$1.50 |
$1.75 |
$2.20 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$6.00 |
$8.50 |
$8.90 |
$11.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 14,000 | SY |
$2.50 |
$1.35 |
$1.60 |
$1.93 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.6 | AC |
$500.00 |
$440.00 |
$300.00 |
$770.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 750 | CY |
$52.00 |
$60.00 |
$65.82 |
$57.59 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 4,617 | SY |
$2.20 |
$2.40 |
$2.64 |
$1.75 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 998 | TON |
$90.00 |
$86.00 |
$102.18 |
$123.92 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 510 | TON |
$100.00 |
$111.00 |
$132.60 |
$135.58 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$325.00 |
$320.00 |
$405.89 |
| 12 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 38 | LF |
$50.00 |
$50.00 |
$81.00 |
$72.13 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 38 | LF |
$60.00 |
$60.00 |
$86.00 |
$86.55 |
| 14 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$80.00 |
$300.00 |
$250.00 |
$314.76 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 86 | LF |
$30.00 |
$45.00 |
$49.00 |
$51.73 |
| 16 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 34 | LF |
$30.00 |
$43.00 |
$45.00 |
$50.01 |
| 17 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$300.00 |
$300.00 |
$310.00 |
$280.98 |
| 18 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$800.00 |
$350.00 |
$340.00 |
$349.49 |
| 19 | 613(O) 4373 |
SPECIAL END SECTION OF 18" RCP ROUND | 2 | EA |
$500.00 |
$1,000.00 |
$1,100.00 |
$1,030.45 |
| 20 | 613(O) 4375 |
SPECIAL END SECTION OF 24" RCP ROUND | 2 | EA |
$600.00 |
$1,100.00 |
$1,350.00 |
$1,238.71 |
| 21 | 613(O) 4820 |
SPECIAL END SECTION OF 58" X 36" RCP ARCH | 2 | EA |
$800.00 |
$3,600.00 |
$3,500.00 |
$4,242.06 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$6,000.00 |
$13,147.18 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27.68 | SF |
$17.00 |
$15.00 |
$16.80 |
$15.40 |
| 24 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 65 | LF |
$10.00 |
$6.50 |
$7.20 |
$6.60 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$12.00 |
$25.00 |
$14.00 |
$17.25 |
| 26 | 501(F) 6352 |
GRANULAR BACKFILL | 46 | CY |
$65.00 |
$75.00 |
$71.00 |
$62.54 |
| 27 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 208 | LF |
$205.00 |
$220.00 |
$208.00 |
$213.46 |
| 28 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$220.00 |
$270.00 |
$256.00 |
$238.86 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 373.8 | SY |
$6.00 |
$6.00 |
$7.00 |
$5.75 |
| 30 | 504(C) 6250 |
SEALED EXPANSION JOINT | 28.17 | LF |
$300.00 |
$260.00 |
$305.00 |
$308.75 |
| 31 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 365.4 | LF |
$65.00 |
$75.00 |
$78.50 |
$106.17 |
| 32 | 506(A) 1322 |
STRUCTURAL STEEL | 890 | LB |
$3.00 |
$3.00 |
$3.00 |
$3.00 |
| 33 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$750.00 |
$1,000.00 |
$400.00 |
$939.92 |
| 34 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$850.00 |
$1,000.00 |
$525.00 |
$1,145.72 |
| 35 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 12 | EA |
$500.00 |
$330.00 |
$600.00 |
$231.89 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 136.7 | CY |
$600.00 |
$625.00 |
$697.50 |
$737.27 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 77.9 | CY |
$550.00 |
$675.00 |
$730.00 |
$731.21 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 54,620 | LB |
$1.00 |
$1.00 |
$0.9600 |
$1.29 |
| 39 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 615 | LF |
$30.00 |
$40.00 |
$33.60 |
$42.14 |
| 40 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 615 | LF |
$10.00 |
$10.00 |
$14.40 |
$11.50 |
| 41 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 42 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 98 | SY |
$5.00 |
$5.00 |
$18.00 |
$5.75 |
| 43 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 276 | LF |
$820.00 |
$825.00 |
$834.00 |
$754.85 |
| 44 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,000.00 |
$3,500.00 |
$4,500.00 |
$5,347.50 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,620 | TON |
$35.00 |
$45.00 |
$39.34 |
$56.12 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 430 | TON |
$30.00 |
$33.00 |
$31.33 |
$42.61 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$11.00 |
$37.00 |
$32.86 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$21.00 |
$11.00 |
$37.00 |
$33.01 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$45,000.00 |
$20,000.00 |
$34,500.00 |
| 50 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,000.00 |
$2,268.00 |
$2,173.50 |
| 51 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,000.00 |
$1,600.00 |
$1,770.00 |
$1,696.25 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$2,800.00 |
$2,070.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$14,000.00 |
$16,500.00 |
$14,662.50 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$4,400.00 |
$4,025.00 |
| 55 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$73,000.00 |
$80,000.00 |
$84,000.00 |
$92,807.77 |