| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$34,000.00 |
$45,000.00 |
$33,785.33 |
$43,014.00 |
$45,000.00 |
$100,000.00 |
$65,000.00 |
$66,976.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 720 | LF |
$1.50 |
$1.50 |
$1.60 |
$1.44 |
$2.60 |
$1.65 |
$2.00 |
$1.65 |
$1.61 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 364 | LF |
$5.00 |
$8.00 |
$8.40 |
$7.66 |
$4.10 |
$8.50 |
$8.50 |
$8.50 |
$8.58 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 8,600 | SY |
$2.00 |
$1.68 |
$2.00 |
$1.68 |
$2.05 |
$1.80 |
$2.50 |
$1.80 |
$1.88 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.7 | AC |
$675.00 |
$588.00 |
$588.00 |
$588.00 |
$300.00 |
$650.00 |
$250.00 |
$600.00 |
$658.56 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 568 | TON |
$40.00 |
$38.00 |
$39.00 |
$40.00 |
$45.09 |
$44.00 |
$55.00 |
$44.00 |
$49.66 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$400.00 |
$400.00 |
$500.00 |
$350.00 |
$450.00 |
$250.00 |
$200.00 |
$498.18 |
| 8 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 178 | TON |
$47.00 |
$52.00 |
$50.00 |
$55.00 |
$60.92 |
$58.00 |
$60.00 |
$65.00 |
$67.58 |
| 9 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 60 | TON |
$42.00 |
$45.00 |
$42.00 |
$45.00 |
$51.34 |
$44.00 |
$60.00 |
$53.00 |
$60.03 |
| 10 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 54 | LF |
$36.00 |
$34.00 |
$35.00 |
$30.00 |
$33.00 |
$28.00 |
$35.00 |
$35.00 |
$44.37 |
| 11 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 102 | LF |
$65.00 |
$71.00 |
$62.00 |
$60.00 |
$135.00 |
$50.00 |
$150.00 |
$85.00 |
$83.21 |
| 12 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,350.00 |
$1,200.00 |
$1,200.00 |
$1,500.00 |
$1,600.00 |
$1,500.00 |
$1,000.00 |
$1,400.00 |
$1,830.13 |
| 13 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$1,200.00 |
$1,200.00 |
$2,000.00 |
$3,100.00 |
$1,900.00 |
$1,200.00 |
$2,500.00 |
$2,706.63 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$14.00 |
$18.00 |
$15.00 |
$32.00 |
$11.00 |
$20.00 |
$12.00 |
$25.00 |
$16.80 |
| 15 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$88.00 |
$80.00 |
$85.00 |
$90.00 |
$77.17 |
$89.00 |
$80.00 |
$85.00 |
$140.23 |
| 16 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 537 | LF |
$190.00 |
$260.00 |
$186.00 |
$200.00 |
$192.00 |
$203.41 |
$190.00 |
$205.00 |
$204.76 |
| 17 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$270.00 |
$325.00 |
$250.00 |
$275.00 |
$295.00 |
$272.00 |
$200.00 |
$260.00 |
$356.70 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 416 | LF |
$86.00 |
$70.00 |
$75.00 |
$80.00 |
$86.00 |
$80.00 |
$65.00 |
$85.00 |
$99.19 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$2.35 |
$5.00 |
$2.50 |
$2.80 |
$2.60 |
$3.85 |
$2.00 |
$2.75 |
$2.92 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$900.00 |
$525.00 |
$1,000.00 |
$800.00 |
$745.00 |
$1,500.00 |
$400.00 |
$825.00 |
$1,327.19 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$900.00 |
$525.00 |
$1,000.00 |
$800.00 |
$745.00 |
$1,500.00 |
$400.00 |
$825.00 |
$1,327.19 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 138.7 | CY |
$600.00 |
$575.00 |
$720.00 |
$680.00 |
$702.50 |
$700.00 |
$850.00 |
$775.00 |
$707.46 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 91.2 | CY |
$625.00 |
$775.00 |
$700.00 |
$680.00 |
$722.50 |
$700.00 |
$500.00 |
$800.00 |
$789.98 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 49,568 | LB |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$0.9500 |
$1.17 |
$1.00 |
$1.10 |
$1.06 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 118 | LF |
$25.00 |
$50.00 |
$30.00 |
$30.00 |
$37.10 |
$47.70 |
$35.00 |
$38.00 |
$47.70 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 265 | LF |
$30.00 |
$65.00 |
$35.00 |
$42.00 |
$44.10 |
$56.75 |
$45.00 |
$49.00 |
$57.88 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 118 | LF |
$12.00 |
$10.00 |
$15.00 |
$26.00 |
$15.90 |
$15.00 |
$75.00 |
$11.00 |
$16.80 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 265 | LF |
$14.00 |
$10.00 |
$15.00 |
$25.00 |
$18.90 |
$15.00 |
$75.00 |
$12.00 |
$16.80 |
| 29 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 30 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 154 | LF |
$600.00 |
$500.00 |
$800.00 |
$675.00 |
$670.00 |
$572.00 |
$575.00 |
$850.00 |
$800.57 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 431 | TON |
$47.00 |
$52.00 |
$49.00 |
$55.00 |
$57.82 |
$58.00 |
$55.00 |
$65.00 |
$67.58 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 144 | TON |
$42.00 |
$45.00 |
$42.00 |
$45.00 |
$49.34 |
$50.00 |
$60.00 |
$52.00 |
$60.03 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$20.00 |
$25.00 |
$40.00 |
$40.00 |
$18.00 |
$25.00 |
$15.00 |
$31.17 |
| 34 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$35.00 |
$20.00 |
$25.00 |
$40.00 |
$40.00 |
$18.00 |
$20.00 |
$15.00 |
$33.51 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$18,500.00 |
$8,435.25 |
$18,500.00 |
$12,000.00 |
$41,603.00 |
$29,000.00 |
$39,200.00 |
| 36 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,200.00 |
$2,300.00 |
$2,300.00 |
$2,000.00 |
$2,300.00 |
$2,200.00 |
$2,400.00 |
$2,000.00 |
$2,525.32 |
| 37 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,450.00 |
$1,500.00 |
$1,800.00 |
$1,250.00 |
$1,500.00 |
$1,375.00 |
$1,600.00 |
$1,250.00 |
$1,999.20 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$2,800.00 |
$2,650.00 |
$2,400.00 |
$4,200.00 |
$3,000.00 |
$3,000.00 |
$3,000.00 |
$3,132.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,650.00 |
$7,500.00 |
$8,000.00 |
$7,800.00 |
$10,000.00 |
$7,500.00 |
$6,650.00 |
$7,448.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$4,000.00 |
$2,000.00 |
$4,000.00 |
$3,900.00 |
$4,000.00 |
$2,000.00 |
$3,000.00 |
$2,800.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$43,500.00 |
$40,000.00 |
$75,275.00 |
$49,000.00 |
$63,000.00 |
$65,000.00 |
$66,000.00 |
$71,000.01 |