| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,260.00 |
$45,000.00 |
$15,000.00 |
$70,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,781 | CY |
$4.50 |
$8.10 |
$8.40 |
$11.00 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 27,400 | CY |
$7.00 |
$9.72 |
$10.50 |
$9.00 |
$14.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$16,200.00 |
$18,500.00 |
$20,000.00 |
$18,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,535 | LF |
$1.50 |
$1.32 |
$1.47 |
$1.60 |
$1.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 60 | LF |
$8.00 |
$12.90 |
$14.33 |
$10.00 |
$13.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 6 | CY |
$160.00 |
$216.00 |
$172.50 |
$160.00 |
$70.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 16,813 | SY |
$1.50 |
$1.43 |
$1.52 |
$2.10 |
$1.70 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 6.95 | AC |
$500.00 |
$527.04 |
$535.00 |
$200.00 |
$650.00 |
| 10 | 241 2832 |
MOWING | 6.95 | AC |
$50.00 |
$120.96 |
$140.00 |
$105.00 |
$125.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,435 | CY |
$48.00 |
$43.70 |
$46.58 |
$40.00 |
$46.00 |
| 12 | 307(A) 4200 |
FLY ASH | 69 | TON |
$60.00 |
$102.60 |
$109.25 |
$85.00 |
$105.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 7,300 | SY |
$3.00 |
$3.08 |
$3.50 |
$3.40 |
$5.00 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 13,481 | SY |
$1.25 |
$1.13 |
$1.21 |
$1.80 |
$2.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,324 | TON |
$25.00 |
$45.41 |
$27.00 |
$35.00 |
$26.00 |
| 16 | 407(B) 0250 |
TACK COAT | 1,139 | GAL |
$3.00 |
$3.24 |
$3.50 |
$3.60 |
$4.00 |
| 17 | 408 5774 |
PRIME COAT | 4,924 | GAL |
$5.00 |
$2.70 |
$3.00 |
$3.60 |
$3.50 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,765 | TON |
$70.00 |
$78.14 |
$84.65 |
$85.00 |
$95.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 965 | TON |
$85.00 |
$99.36 |
$107.65 |
$100.00 |
$112.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 267 | SY |
$5.00 |
$11.12 |
$14.00 |
$15.00 |
$12.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 32 | CY |
$4.00 |
$10.80 |
$62.00 |
$60.00 |
$20.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 90 | CY |
$450.00 |
$504.33 |
$605.00 |
$750.00 |
$550.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 11,326 | LB |
$1.00 |
$0.9100 |
$1.15 |
$1.00 |
$1.00 |
| 24 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$8,100.00 |
$9,250.00 |
$6,000.00 |
$45,000.00 |
| 25 | 619(B) 4725 |
REMOVAL OF FENCE | 1,704 | LF |
$1.50 |
$2.16 |
$3.23 |
$1.00 |
$2.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,846 | SY |
$3.00 |
$5.40 |
$7.25 |
$5.00 |
$6.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 466 | LF |
$2.00 |
$3.24 |
$5.00 |
$4.00 |
$3.00 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 325 | LF |
$18.00 |
$17.01 |
$18.12 |
$17.00 |
$20.00 |
| 29 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,106.00 |
$2,242.50 |
$2,200.00 |
$2,400.00 |
| 30 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,495.80 |
$1,592.75 |
$2,100.00 |
$1,800.00 |
| 31 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 3,608 | LF |
$4.00 |
$3.89 |
$9.50 |
$3.00 |
$10.00 |
| 32 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 330.4 | CY |
$25.00 |
$16.80 |
$11.00 |
$24.00 |
$20.00 |
| 33 | 501(G) 6309 |
CLSM BACKFILL | 324 | CY |
$140.00 |
$173.45 |
$157.50 |
$150.00 |
$160.00 |
| 34 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 1,376 | LF |
$300.00 |
$280.39 |
$277.00 |
$260.00 |
$260.00 |
| 35 | 504(A) 1304 |
APPROACH SLAB | 393.8 | SY |
$185.00 |
$177.13 |
$195.00 |
$170.00 |
$145.00 |
| 36 | 504(B) 1305 |
SAW-CUT GROOVING | 1,922.6 | SY |
$5.00 |
$4.26 |
$4.37 |
$5.10 |
$4.50 |
| 37 | 504(C) 6250 |
SEALED EXPANSION JOINT | 49.1 | LF |
$275.00 |
$300.70 |
$290.00 |
$250.00 |
$195.00 |
| 38 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 866 | LF |
$85.00 |
$97.43 |
$89.50 |
$80.00 |
$70.00 |
| 39 | 506(A) 1322 |
STRUCTURAL STEEL | 4,043 | LB |
$3.50 |
$2.12 |
$3.00 |
$3.00 |
$3.00 |
| 40 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,873.45 |
$2,250.00 |
$2,200.00 |
$1,800.00 |
| 41 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$2,500.00 |
$1,873.45 |
$2,250.00 |
$2,200.00 |
$1,800.00 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 485 | CY |
$500.00 |
$494.47 |
$615.00 |
$580.00 |
$470.00 |
| 43 | 509(B) 1328 |
CLASS A CONCRETE | 249.9 | CY |
$575.00 |
$544.66 |
$635.00 |
$650.00 |
$510.00 |
| 44 | 509(D) 1331 |
CLASS C CONCRETE | 11 | CY |
$550.00 |
$520.72 |
$587.50 |
$850.00 |
$300.00 |
| 45 | 511(A) 1332 |
REINFORCING STEEL | 659 | LB |
$1.00 |
$1.04 |
$1.75 |
$1.30 |
$0.8000 |
| 46 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 144,347 | LB |
$1.10 |
$1.01 |
$1.08 |
$0.9000 |
$1.10 |
| 47 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 496 | LF |
$30.00 |
$39.20 |
$28.00 |
$30.00 |
$28.00 |
| 48 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,265 | LF |
$40.00 |
$45.60 |
$33.60 |
$35.00 |
$38.00 |
| 49 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 496 | LF |
$20.00 |
$13.44 |
$12.00 |
$20.00 |
$30.00 |
| 50 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,265 | LF |
$20.00 |
$13.44 |
$14.40 |
$20.00 |
$30.00 |
| 51 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 52 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,808 | SY |
$4.00 |
$3.53 |
$4.00 |
$4.00 |
$4.00 |
| 53 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 228 | LF |
$900.00 |
$915.66 |
$1,040.00 |
$760.00 |
$800.00 |
| 54 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,500.00 |
$1,999.20 |
$2,900.00 |
$1,400.00 |
$3,200.00 |
| 55 | 523(A) 6550 |
SEALER CRACK PREPARATION | 48.1 | LF |
$5.00 |
$5.38 |
$4.40 |
$4.00 |
$5.00 |
| 56 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$150.00 |
$224.00 |
$220.00 |
$500.00 |
$250.00 |
| 57 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,297 | TON |
$40.00 |
$38.69 |
$33.00 |
$45.00 |
$40.00 |
| 58 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 178 | TON |
$35.00 |
$30.91 |
$27.00 |
$75.00 |
$28.00 |
| 59 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 98 | LF |
$30.00 |
$29.80 |
$31.00 |
$30.00 |
$20.00 |
| 60 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 49 | LF |
$30.00 |
$31.61 |
$31.00 |
$30.00 |
$20.00 |
| 61 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$104,000.00 |
$151,200.00 |
$65,000.00 |
$110,000.00 |
$100,000.00 |
| 62 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$66,000.00 |
$55,000.00 |
$56,500.00 |
$55,000.00 |
$30,000.00 |
| 63 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 10 | EA |
$50.00 |
$27.50 |
$23.00 |
$30.00 |
$25.00 |
| 64 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12 | SF |
$20.00 |
$48.40 |
$16.10 |
$50.00 |
$20.00 |
| 65 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 57 | LF |
$12.00 |
$9.35 |
$8.00 |
$10.00 |
$10.00 |
| 66 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$20.00 |
$5.67 |
$23.00 |
$20.00 |
$25.00 |
| 67 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 5,720 | LF |
$0.5000 |
$0.3900 |
$0.6000 |
$0.4000 |
$0.6000 |
| 68 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,280 | SD |
$0.2500 |
$0.4400 |
$1.20 |
$0.5000 |
$1.20 |
| 69 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,680 | SD |
$0.7500 |
$0.4400 |
$0.6000 |
$0.5000 |
$0.6000 |
| 70 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 960 | SD |
$1.25 |
$0.4400 |
$0.3000 |
$0.5000 |
$0.3000 |
| 71 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$0.5000 |
$0.5000 |
$1.20 |
$0.5000 |
$1.20 |
| 72 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,920 | SD |
$0.1500 |
$0.1300 |
$1.20 |
$0.1500 |
$1.20 |
| 73 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$13,475.00 |
$16,500.00 |
$60,000.00 |
$30,000.00 |
| 74 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,300.00 |
$7,000.00 |
$7,000.00 |
$3,500.00 |
| 75 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$169,064.05 |
$174,708.86 |
$168,000.00 |
$285,000.00 |
$150,000.00 |