| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$13,800.00 |
$14,490.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,397 | CY |
$5.00 |
$6.00 |
$8.05 |
$7.06 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,732 | CY |
$8.00 |
$9.50 |
$10.93 |
$10.65 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$10,350.00 |
$11,471.25 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,235 | LF |
$2.50 |
$1.35 |
$2.86 |
$2.49 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 472 | LF |
$7.00 |
$4.00 |
$13.74 |
$11.95 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 36,598 | SY |
$1.50 |
$1.59 |
$1.83 |
$1.59 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.52 | AC |
$350.00 |
$194.00 |
$223.10 |
$194.00 |
| 9 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 2,133 | CY |
$40.00 |
$50.11 |
$57.63 |
$50.09 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 476 | TON |
$20.00 |
$24.60 |
$28.29 |
$39.15 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,103 | TON |
$75.00 |
$83.21 |
$95.69 |
$73.68 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,052 | TON |
$95.00 |
$91.27 |
$104.96 |
$92.66 |
| 13 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 13 | CY |
$25.00 |
$100.00 |
$17.25 |
$318.73 |
| 14 | 509(B) 0321 |
CLASS A CONCRETE | 31 | CY |
$350.00 |
$400.00 |
$720.75 |
$1,250.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$704.83 |
$500.00 |
| 16 | 511(A) 0332 |
REINFORCING STEEL | 4,312 | LB |
$0.8500 |
$1.75 |
$1.71 |
$1.50 |
| 17 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 60 | LF |
$100.00 |
$60.89 |
$70.02 |
$100.00 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 58 | LF |
$25.00 |
$40.00 |
$46.00 |
$21.00 |
| 19 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$1,250.00 |
$1,437.50 |
$3,200.00 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,500.00 |
$1,977.30 |
$1,250.00 |
| 21 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 45 | CY |
$40.00 |
$41.67 |
$47.92 |
$61.17 |
| 22 | 613(V) 1180 |
TRENCH EXCAVATION | 23 | CY |
$20.00 |
$20.00 |
$23.00 |
$10.50 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$3,000.00 |
$3,450.00 |
$3,105.00 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,840 | SY |
$3.50 |
$3.50 |
$4.03 |
$3.80 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$15.00 |
$20.00 |
$17.25 |
$35.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$80.00 |
$120.00 |
$133.81 |
$120.00 |
| 27 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 317 | LF |
$170.00 |
$150.00 |
$192.34 |
$285.00 |
| 28 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 399 | LF |
$180.00 |
$175.00 |
$230.52 |
$300.00 |
| 29 | 504(A) 1304 |
APPROACH SLAB | 142 | SY |
$120.00 |
$135.00 |
$175.19 |
$200.00 |
| 30 | 504(B) 1305 |
SAW-CUT GROOVING | 694 | SY |
$5.53 |
$4.05 |
$4.66 |
$4.05 |
| 31 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 415 | LF |
$60.00 |
$150.00 |
$99.77 |
$65.00 |
| 32 | 506(A) 1322 |
STRUCTURAL STEEL | 870 | LB |
$2.50 |
$4.00 |
$3.40 |
$3.50 |
| 33 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$500.00 |
$750.00 |
$834.90 |
$500.00 |
| 34 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$750.00 |
$750.00 |
$1,024.80 |
$750.00 |
| 35 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$280.00 |
$250.00 |
$582.54 |
$600.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 193 | CY |
$350.00 |
$600.00 |
$725.65 |
$700.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 97 | CY |
$400.00 |
$600.00 |
$749.50 |
$700.00 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 66,913 | LB |
$0.8500 |
$1.25 |
$1.17 |
$1.05 |
| 39 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 315 | LF |
$20.00 |
$21.00 |
$44.27 |
$37.50 |
| 40 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 315 | LF |
$12.00 |
$7.00 |
$11.50 |
$23.50 |
| 41 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 112 | LF |
$560.00 |
$700.00 |
$815.32 |
$800.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,975 | TON |
$25.00 |
$29.46 |
$33.88 |
$37.00 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 700 | TON |
$20.00 |
$22.38 |
$25.74 |
$32.00 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$20.00 |
$50.00 |
$31.35 |
$35.00 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$20.00 |
$33.04 |
$35.00 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$17,250.00 |
$39,675.00 |
$25,000.00 |
| 47 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,475.00 |
$2,323.00 |
$1,475.00 |
| 48 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,150.00 |
$2,300.00 |
$2,150.00 |
| 49 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 11,200 | LF |
$0.7500 |
$0.5800 |
$0.6600 |
$0.5800 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,750.00 |
$2,530.00 |
$3,750.00 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$7,500.00 |
$14,375.00 |
$13,000.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$3,000.00 |
$3,450.00 |
$4,000.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$87,300.00 |
$40,000.00 |
$90,578.71 |
$180,000.00 |