| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$28,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,111 | CY |
$5.00 |
$21.00 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 135 | CY |
$15.00 |
$40.00 |
$24.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$12,000.00 |
$6,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 550 | LF |
$2.50 |
$3.00 |
$1.65 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 49 | LF |
$10.00 |
$10.00 |
$4.55 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,203 | SY |
$2.00 |
$2.00 |
$1.60 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 2.57 | AC |
$500.00 |
$440.00 |
$510.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.29 | AC |
$400.00 |
$550.00 |
$400.00 |
| 10 | 241 2832 |
MOWING | 2.57 | AC |
$100.00 |
$100.00 |
$46.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 410 | CY |
$55.00 |
$60.00 |
$65.00 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,709 | SY |
$4.00 |
$3.00 |
$5.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 2,746 | SY |
$1.50 |
$1.25 |
$2.00 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 2,372 | SY |
$5.00 |
$3.00 |
$2.50 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 528 | TON |
$35.00 |
$29.00 |
$36.00 |
| 16 | 409(A) 4242 |
FABRIC REINFORCEMENT | 561 | SY |
$3.00 |
$10.00 |
$8.30 |
| 17 | 409(B) 4268 |
BITUMINOUS BINDER | 176 | GAL |
$2.00 |
$9.00 |
$3.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,006 | TON |
$75.00 |
$77.00 |
$77.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 537 | TON |
$85.00 |
$92.00 |
$100.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 2,160 | SY |
$3.50 |
$5.00 |
$7.50 |
| 21 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 40 | SY |
$30.00 |
$44.00 |
$105.00 |
| 22 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 15 | CY |
$300.00 |
$135.00 |
$130.00 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 114 | CY |
$25.00 |
$65.00 |
$30.00 |
| 24 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 39 | LF |
$90.00 |
$132.00 |
$100.00 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 281.7 | CY |
$500.00 |
$360.00 |
$600.00 |
| 26 | 509(B) 0321 |
CLASS A CONCRETE | 19.1 | CY |
$450.00 |
$320.00 |
$600.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 5.6 | CY |
$400.00 |
$825.00 |
$1,000.00 |
| 28 | 510(A) 6333 |
RETAINING WALL | 135 | SY |
$1,400.00 |
$1,250.00 |
$1,275.00 |
| 29 | 510(C) 6136 |
SLOPE WALL (6") | 24.7 | SY |
$90.00 |
$55.00 |
$150.00 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 36,416 | LB |
$0.9000 |
$0.8000 |
$0.9000 |
| 31 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 6,396 | LB |
$1.00 |
$1.10 |
$0.9000 |
| 32 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 125 | TON |
$50.00 |
$78.00 |
$40.00 |
| 33 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 27 | TON |
$40.00 |
$50.00 |
$38.00 |
| 34 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 66 | LF |
$25.00 |
$70.00 |
$27.00 |
| 35 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 39 | LF |
$20.00 |
$30.00 |
$17.00 |
| 36 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 15 | LF |
$30.00 |
$40.00 |
$17.00 |
| 37 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$500.00 |
$300.00 |
$125.00 |
| 38 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$500.00 |
$600.00 |
$325.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$6,800.00 |
$4,500.00 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 704 | SY |
$4.00 |
$11.00 |
$8.00 |
| 41 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 199 | SY |
$15.00 |
$19.00 |
$10.00 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 1,800 | LF |
$2.00 |
$3.00 |
$3.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$22,000.00 |
$8,000.00 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 150 | LF |
$20.00 |
$18.00 |
$14.50 |
| 45 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,250.00 |
$2,500.00 |
$2,150.00 |
| 46 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,750.00 |
$1,900.00 |
$1,800.00 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 889 | LF |
$4.50 |
$7.00 |
$6.25 |
| 48 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$50.00 |
$5.50 |
$51.00 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 14.92 | SF |
$25.00 |
$16.00 |
$14.50 |
| 50 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 25 | LF |
$15.00 |
$9.00 |
$8.25 |
| 51 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 7 | EA |
$20.00 |
$11.00 |
$10.50 |
| 52 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 2,512 | LF |
$0.6500 |
$1.10 |
$1.05 |
| 53 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,835 | LF |
$0.5000 |
$0.2800 |
$0.2600 |
| 54 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 540 | LF |
$0.7500 |
$1.10 |
$1.05 |
| 55 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 250 | SD |
$5.00 |
$16.50 |
$15.25 |
| 56 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 50 | SD |
$15.00 |
$22.00 |
$20.50 |
| 57 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 775 | LF |
$40.00 |
$40.00 |
$21.25 |
| 58 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 635 | LF |
$7.50 |
$6.00 |
$4.50 |
| 59 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,400 | SD |
$0.5000 |
$1.10 |
$1.05 |
| 60 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 45 | SD |
$0.7500 |
$1.10 |
$1.05 |
| 61 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,430 | SD |
$1.00 |
$1.10 |
$1.05 |
| 62 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 45 | SD |
$5.00 |
$1.10 |
$1.05 |
| 63 | 880(C) 8848 |
WING BARRICADES | 440 | SD |
$0.6500 |
$0.2800 |
$0.2600 |
| 64 | 880(D) 8854 |
VERTICAL PANELS | 1,040 | SD |
$0.2500 |
$0.2800 |
$0.2600 |
| 65 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,560 | SD |
$0.1500 |
$0.2800 |
$0.2600 |
| 66 | 880(F) 8878 |
DRUMS | 2,050 | SD |
$0.2500 |
$0.2800 |
$0.2600 |
| 67 | 880(I) 8902 |
FLAGGER | 35 | SD |
$200.00 |
$130.00 |
$325.00 |
| 68 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 220 | SD |
$5.00 |
$16.50 |
$15.25 |
| 69 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$9,200.00 |
$8,500.00 |
| 70 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$2,155.00 |
| 71 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,500.00 |
$6,000.00 |
$6,550.00 |
| 72 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$66,182.85 |
$30,000.00 |
$70,000.00 |