| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,150.00 |
$50,000.00 |
$100,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$397,195.00 |
$500,000.00 |
$600,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,150.00 |
$120,000.00 |
$100,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,300 | LF |
$2.50 |
$2.00 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,948 | LF |
$5.00 |
$7.00 |
$11.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 96,670 | SY |
$2.25 |
$1.50 |
$2.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 19.97 | AC |
$1,000.00 |
$700.00 |
$1,000.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,130 | CY |
$50.00 |
$65.00 |
$80.00 |
| 9 | 307(C) 4220 |
PORTLAND CEMENT | 444 | TON |
$65.00 |
$125.00 |
$125.00 |
| 10 | 307(D) 4230 |
LIME | 303 | TON |
$60.00 |
$160.00 |
$175.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 40,333 | SY |
$2.10 |
$2.50 |
$1.50 |
| 12 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 23,333 | SY |
$2.10 |
$3.00 |
$2.25 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,556 | TON |
$50.00 |
$30.00 |
$45.00 |
| 14 | 407(B) 0250 |
TACK COAT | 2,858 | GAL |
$2.50 |
$3.00 |
$2.50 |
| 15 | 408 5774 |
PRIME COAT | 24,692 | GAL |
$3.50 |
$3.00 |
$7.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,977 | TON |
$65.00 |
$60.00 |
$76.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,768 | TON |
$65.00 |
$70.00 |
$88.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 442.66 | CY |
$350.00 |
$400.00 |
$385.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 1,160 | CY |
$350.00 |
$330.00 |
$230.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 68,904 | LB |
$1.10 |
$1.00 |
$1.00 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,435 | TON |
$45.00 |
$50.00 |
$77.00 |
| 22 | 602(C) 4155 |
FILTER FABRIC | 1,648 | SY |
$10.00 |
$2.00 |
$2.00 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 244 | LF |
$20.00 |
$85.00 |
$105.00 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 60 | LF |
$30.00 |
$135.00 |
$170.00 |
| 25 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 190 | LF |
$40.00 |
$190.00 |
$190.00 |
| 26 | 613(A) 0498 |
60" R.C.PIPE CLASS III | 200 | LF |
$50.00 |
$260.00 |
$270.00 |
| 27 | 613(A) 4506 |
29" X 45" R.C.PIPE ELLIPTICAL CLASS HE-III | 40 | LF |
$25.00 |
$150.00 |
$215.00 |
| 28 | 613(C) 5100 |
18" PRECOATED CORR. STEEL PIPE | 720 | LF |
$30.00 |
$55.00 |
$38.00 |
| 29 | 613(C) 5102 |
24" PRECOATED CORR. STEEL PIPE | 496 | LF |
$35.00 |
$70.00 |
$53.00 |
| 30 | 613(C) 5105 |
36" PRECOATED CORR. STEEL PIPE | 60 | LF |
$40.00 |
$100.00 |
$65.00 |
| 31 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$300.00 |
$700.00 |
$1,000.00 |
| 32 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$900.00 |
$1,800.00 |
| 33 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$900.00 |
$1,700.00 |
$2,400.00 |
| 34 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,200.00 |
$2,400.00 |
$3,000.00 |
| 35 | 613(L) 5830 |
29" X 45" PREFAB. CULVERT END SEC., ELLIPTICAL | 2 | EA |
$375.00 |
$1,500.00 |
$2,300.00 |
| 36 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 36 | EA |
$800.00 |
$800.00 |
$700.00 |
| 37 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$900.00 |
$1,000.00 |
$800.00 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,500.00 |
$1,100.00 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,000 | SY |
$5.00 |
$3.00 |
$8.65 |
| 40 | 619(C) 0924 |
SAWING PAVEMENT | 50 | LF |
$10.00 |
$5.00 |
$19.00 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 37,222 | LF |
$2.50 |
$4.00 |
$4.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 36.26 | SF |
$75.00 |
$13.00 |
$13.00 |
| 43 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 105 | LF |
$15.00 |
$10.00 |
$10.00 |
| 44 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 69,840 | LF |
$0.5000 |
$0.3500 |
$0.3500 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$40,000.00 |
$8,000.00 |
$8,000.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$30,000.00 |
$40,000.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$3,000.00 |
$2,500.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$200,000.00 |
$120,000.00 |