| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$21,000.00 |
$75,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,845 | CY |
$5.50 |
$6.00 |
$5.00 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 33,125 | CY |
$7.50 |
$7.00 |
$5.00 |
$9.50 |
| 4 | 202(E) 0186 |
SELECT BORROW | 8,160 | CY |
$15.00 |
$12.25 |
$10.00 |
$16.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$10,500.00 |
$10,000.00 |
$10,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,865 | LF |
$2.50 |
$1.40 |
$1.50 |
$1.27 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$9.00 |
$8.20 |
$8.00 |
$7.44 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 14,228 | SY |
$2.00 |
$1.52 |
$1.50 |
$1.38 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.33 | AC |
$415.00 |
$500.00 |
$600.00 |
$518.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,230 | TON |
$28.00 |
$23.05 |
$25.00 |
$19.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$250.00 |
$400.00 |
$385.00 |
| 12 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 52 | LF |
$475.00 |
$210.00 |
$150.00 |
$200.00 |
| 13 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 190 | LF |
$27.50 |
$27.00 |
$40.00 |
$30.00 |
| 14 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$325.00 |
$225.00 |
$500.00 |
$175.00 |
| 15 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,250.00 |
$2,200.00 |
$2,500.00 |
$3,000.00 |
| 16 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,910 | LF |
$5.00 |
$4.51 |
$5.00 |
$6.00 |
| 17 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 4 | EA |
$650.00 |
$880.00 |
$500.00 |
$800.00 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$8.50 |
$8.50 |
$10.00 |
$19.00 |
| 19 | 501(F) 6352 |
GRANULAR BACKFILL | 56 | CY |
$50.00 |
$62.00 |
$40.00 |
$80.00 |
| 20 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 478 | LF |
$200.00 |
$203.38 |
$225.00 |
$200.00 |
| 21 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$200.00 |
$238.00 |
$275.00 |
$250.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$160.00 |
$170.00 |
$100.00 |
$175.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 88.8 | SY |
$4.00 |
$22.00 |
$10.00 |
$18.02 |
| 24 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 591.1 | LF |
$70.00 |
$70.00 |
$100.00 |
$65.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 1,200 | LB |
$3.15 |
$2.00 |
$2.00 |
$2.00 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$376.00 |
$400.00 |
$225.00 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,200.00 |
$580.00 |
$600.00 |
$500.00 |
| 28 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 12 | EA |
$450.00 |
$800.00 |
$400.00 |
$650.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 213.7 | CY |
$550.00 |
$534.00 |
$650.00 |
$475.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 105.81 | CY |
$500.00 |
$560.00 |
$600.00 |
$575.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 64,708 | LB |
$1.15 |
$0.8800 |
$1.00 |
$1.00 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 636 | LF |
$30.00 |
$27.30 |
$30.00 |
$23.00 |
| 33 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 636 | LF |
$15.00 |
$11.70 |
$20.00 |
$10.00 |
| 34 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 120 | LF |
$760.00 |
$660.00 |
$600.00 |
$545.00 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,614 | TON |
$40.00 |
$32.86 |
$40.00 |
$28.00 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 430.3 | TON |
$30.00 |
$26.45 |
$25.00 |
$22.00 |
| 37 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 3,227.1 | SY |
$2.00 |
$3.50 |
$1.00 |
$1.50 |
| 38 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 54 | LF |
$22.00 |
$28.00 |
$10.00 |
$24.00 |
| 39 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$20.00 |
$28.00 |
$10.00 |
$12.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$11,200.00 |
$10,000.00 |
$6,500.00 |
| 41 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$2,255.00 |
$3,500.00 |
$2,535.00 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,300.00 |
$3,800.00 |
$4,000.00 |
$2,090.00 |
| 43 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$3,043.41 |
$8,500.00 |
$10,000.00 |
$5,000.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,650.00 |
$5,000.00 |
$2,000.00 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$64,650.00 |
$55,000.00 |
$85,000.00 |