| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100,648 | CY |
$6.00 |
$2.40 |
$9.00 |
$4.71 |
$10.60 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,896 | CY |
$7.50 |
$12.50 |
$8.05 |
$4.71 |
$15.65 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$123,620.00 |
$71,610.00 |
$75,000.00 |
$50,519.03 |
$143,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,500 | LF |
$2.20 |
$1.35 |
$1.36 |
$2.51 |
$1.35 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 28 | EA |
$300.00 |
$220.00 |
$225.78 |
$211.57 |
$222.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,156 | LF |
$9.00 |
$6.50 |
$6.67 |
$6.80 |
$6.55 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 74,002 | SY |
$2.00 |
$1.25 |
$1.30 |
$1.25 |
$1.28 |
| 8 | 230(F) 2812 |
WATERING | 2,961 | KGAL |
$5.25 |
$4.15 |
$4.26 |
$5.57 |
$4.20 |
| 9 | 234(A) 2824 |
FERTILIZING (10-20-10) | 8 | TON |
$800.00 |
$779.00 |
$798.75 |
$664.37 |
$787.50 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 147,291 | CY |
$40.00 |
$24.20 |
$16.00 |
$34.70 |
$29.70 |
| 11 | 317 4270 |
CEMENT TREATED BASE | 186,678 | SY |
$2.75 |
$10.40 |
$11.00 |
$13.86 |
$12.25 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 255,340 | SY |
$1.25 |
$1.15 |
$1.10 |
$0.9600 |
$1.40 |
| 13 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 235,552 | SY |
$2.25 |
$1.65 |
$1.50 |
$1.75 |
$1.90 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 32,404 | TON |
$25.00 |
$2.15 |
$14.50 |
$18.38 |
$25.00 |
| 15 | 407(B) 0250 |
TACK COAT | 7,002 | GAL |
$4.00 |
$3.15 |
$4.05 |
$4.57 |
$1.85 |
| 16 | 408 5774 |
PRIME COAT | 138,407 | GAL |
$4.50 |
$4.65 |
$1.50 |
$6.57 |
$4.15 |
| 17 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 10,629 | TON |
$95.00 |
$83.10 |
$95.16 |
$97.09 |
$94.40 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 845 | SY |
$10.00 |
$14.60 |
$10.00 |
$13.71 |
$6.00 |
| 19 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 42,153 | SY |
$9.00 |
$6.20 |
$9.00 |
$8.12 |
$12.15 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 128,822 | SY |
$12.00 |
$8.95 |
$15.00 |
$13.06 |
$14.00 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 45,360 | CY |
$92.00 |
$73.50 |
$100.00 |
$108.40 |
$77.75 |
| 22 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 121 | LF |
$5.70 |
$31.00 |
$25.00 |
$1.68 |
$18.25 |
| 23 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 80 | SY |
$63.00 |
$73.20 |
$54.38 |
$43.91 |
$52.65 |
| 24 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 48 | LF |
$70.00 |
$102.00 |
$103.42 |
$87.09 |
$82.00 |
| 25 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 29,567 | LF |
$13.00 |
$8.10 |
$5.00 |
$4.51 |
$13.65 |
| 26 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 9,853 | LF |
$11.00 |
$11.50 |
$8.00 |
$4.99 |
$15.75 |
| 27 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,250.00 |
$1,207.00 |
$1,858.50 |
$927.94 |
$1,770.00 |
| 28 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 132 | EA |
$700.00 |
$210.50 |
$205.34 |
$173.34 |
$787.50 |
| 29 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 1,971 | CY |
$37.00 |
$40.30 |
$34.30 |
$34.56 |
$57.75 |
| 30 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 2,956 | CY |
$46.00 |
$38.80 |
$68.06 |
$47.25 |
$65.10 |
| 31 | 613(V) 1180 |
TRENCH EXCAVATION | 11,823 | CY |
$12.00 |
$1.70 |
$5.48 |
$0.5600 |
$15.75 |
| 32 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 165,508 | SY |
$1.50 |
$2.95 |
$5.00 |
$4.31 |
$5.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,386 | SY |
$8.00 |
$2.85 |
$7.25 |
$4.47 |
$5.10 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,118 | LF |
$3.50 |
$1.85 |
$2.17 |
$3.25 |
$3.40 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 6,156 | LF |
$3.00 |
$6.85 |
$3.33 |
$2.83 |
$4.20 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 963 | LF |
$17.00 |
$20.50 |
$18.05 |
$14.81 |
$13.25 |
| 37 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 3 | EA |
$1,600.00 |
$729.00 |
$798.75 |
$940.55 |
$840.00 |
| 38 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,300.00 |
$2,151.00 |
$2,183.25 |
$1,645.96 |
$1,470.00 |
| 39 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 25 | EA |
$13.00 |
$10.50 |
$10.65 |
$7.03 |
$6.30 |
| 40 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,200 | SD |
$13.00 |
$5.25 |
$4.26 |
$17.38 |
$15.75 |
| 41 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$15.00 |
$5.25 |
$26.63 |
$23.18 |
$21.00 |
| 42 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 37,200 | LF |
$22.00 |
$25.80 |
$18.00 |
$17.53 |
$27.45 |
| 43 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$2.00 |
$26.20 |
$26.63 |
$25.49 |
$23.10 |
| 44 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,120 | SD |
$0.4000 |
$0.2600 |
$0.0500 |
$0.0600 |
$0.0500 |
| 45 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 17,040 | SD |
$0.9500 |
$0.8900 |
$0.5300 |
$0.0600 |
$0.0500 |
| 46 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,080 | SD |
$0.2000 |
$2.60 |
$3.20 |
$1.16 |
$1.05 |
| 47 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,760 | SD |
$0.5000 |
$1.05 |
$1.07 |
$0.0600 |
$0.0500 |
| 48 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$0.7000 |
$2.10 |
$1.07 |
$1.16 |
$1.05 |
| 49 | 880(D) 8854 |
VERTICAL PANELS | 35,520 | SD |
$0.1500 |
$0.2100 |
$0.1100 |
$0.4100 |
$0.3700 |
| 50 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,080 | SD |
$0.2000 |
$0.3700 |
$1.07 |
$0.4600 |
$0.4200 |
| 51 | 880(F) 8878 |
DRUMS | 57,840 | SD |
$0.1500 |
$0.1600 |
$0.0900 |
$0.0200 |
$0.0200 |
| 52 | 880(G) 8890 |
CHANNELIZER CONES | 14,400 | SD |
$0.9000 |
$0.4700 |
$0.1600 |
$0.4600 |
$0.4200 |
| 53 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 1,000 | HOUR |
$66.00 |
$68.20 |
$58.04 |
$75.32 |
$68.25 |
| 54 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$11.75 |
$15.70 |
$15.98 |
$28.97 |
$26.25 |
| 55 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 49 | EA |
$130.00 |
$105.00 |
$159.75 |
$110.09 |
$99.75 |
| 56 | 854(B) 8803 |
TRAFFIC STRIPE(PAINT)(ARROW) | 12 | EA |
$106.50 |
$26.20 |
$53.25 |
$527.28 |
$47.25 |
| 57 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 134,700 | LF |
$0.4000 |
$0.3600 |
$0.5300 |
$0.5000 |
$0.4500 |
| 58 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 3,000 | LF |
$1.20 |
$0.7300 |
$1.07 |
$0.5200 |
$0.4700 |
| 59 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 36 | LF |
$0.9500 |
$5.25 |
$26.63 |
$3.48 |
$3.15 |
| 60 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 7 | EA |
$50.00 |
$105.00 |
$106.50 |
$110.09 |
$99.75 |
| 61 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 138,400 | LF |
$0.1000 |
$0.1600 |
$0.0900 |
$0.0800 |
$0.0700 |
| 62 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 207,200 | LF |
$0.1500 |
$0.0500 |
$0.0200 |
$0.0700 |
$0.0600 |
| 63 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 19 | EA |
$3.00 |
$26.20 |
$53.25 |
$52.15 |
$47.25 |
| 64 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 41,000 | LF |
$0.2500 |
$0.2900 |
$0.2900 |
$0.2500 |
$0.3300 |
| 65 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$125,000.00 |
$75,000.00 |
$85,000.00 |
$43,519.81 |
$131,300.00 |
| 66 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$621.54 |
$2,791.45 |
$11,200.00 |
| 67 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$15,000.00 |
$13,000.00 |
$5,582.90 |
$18,145.00 |
| 68 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$920,388.00 |
$500,000.00 |
$600,000.00 |
$918,983.99 |
$865,000.00 |
| 69 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$40,600.00 |
$54,000.00 |
$55,000.00 |
$100,050.60 |
$56,000.00 |
| 70 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,763.86 | CY |
$4.50 |
$19.70 |
$2.51 |
$4.71 |
$12.10 |
| 71 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,151.21 | CY |
$6.00 |
$12.60 |
$10.24 |
$4.71 |
$15.65 |
| 72 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,500 | LF |
$1.25 |
$1.35 |
$1.36 |
$2.51 |
$1.35 |
| 73 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 40 | EA |
$70.00 |
$220.00 |
$225.78 |
$211.57 |
$222.50 |
| 74 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,844 | LF |
$8.50 |
$6.50 |
$6.67 |
$6.80 |
$6.55 |
| 75 | 230(A) 2806 |
SOLID SLAB SODDING | 18,492 | SY |
$1.50 |
$1.25 |
$1.30 |
$1.25 |
$1.30 |
| 76 | 241 2832 |
MOWING | 3.83 | AC |
$66.00 |
$104.00 |
$70.22 |
$106.07 |
$92.40 |
| 77 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 9,693.42 | TON |
$25.00 |
$18.30 |
$21.49 |
$18.38 |
$26.25 |
| 78 | 509(A) 0319 |
CLASS AA CONCRETE | 511 | CY |
$297.00 |
$276.00 |
$124.73 |
$442.06 |
$393.75 |
| 79 | 509(D) 0325 |
CLASS C CONCRETE | 183.69 | CY |
$225.00 |
$573.50 |
$288.89 |
$250.34 |
$345.00 |
| 80 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 20 | EA |
$1,500.00 |
$2,158.00 |
$2,705.80 |
$1,643.07 |
$2,322.00 |
| 81 | 612(C) 0645 |
INLET ADJUST TO GRADE | 5 | EA |
$1,600.00 |
$2,115.00 |
$3,239.88 |
$1,020.44 |
$2,375.00 |
| 82 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,067 | SY |
$3.75 |
$11.80 |
$2.95 |
$3.04 |
$7.20 |
| 83 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 20 | EA |
$500.00 |
$590.50 |
$1,143.88 |
$393.77 |
$545.00 |
| 84 | 619(C) 0924 |
SAWING PAVEMENT | 7,000 | LF |
$3.50 |
$4.55 |
$2.40 |
$2.83 |
$2.75 |
| 85 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 51,987 | LF |
$7.50 |
$7.80 |
$7.90 |
$7.42 |
$6.70 |
| 86 | 628(C) 5110 |
END ANCHORS | 38 | EA |
$1,100.00 |
$749.00 |
$1,210.54 |
$3,802.18 |
$3,400.00 |
| 87 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$1,000.00 |
$1,894.00 |
$3,402.68 |
$3,527.07 |
$315.00 |
| 88 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,000 | LF |
$0.8000 |
$0.3600 |
$0.8000 |
$0.5800 |
$0.5300 |
| 89 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 7,000 | LF |
$0.2500 |
$0.0500 |
$0.2700 |
$0.1200 |
$0.1100 |